Connect with us

News

Elon Musk explains Tesla’s FSD ‘Download Beta’ button and its expected release date

(Credit: Whole Mars Catalog/YouTube)

Published

on

Elon Musk recently remarked that Tesla would be releasing a “Download Beta” button for FSD users. The button, which is part of the company’s efforts to expand the FSD Beta’s user base, is expected to be released with the Build 8.3 update. In a recent set of tweets, Musk shared some additional details about the upcoming FSD “Download Beta” button, as well as the feature’s estimated release date. 

Musk’s update came as a response to Model 3 owner @WholeMarsBlog, who asked if the upcoming button would place Tesla owners in a queue for the FSD Beta. According to Musk, using the feature would actually allow vehicles to download the latest QA-tested FSD Beta build as soon as the car connects to a WiFi network.

In a later tweet, the Tesla CEO added that the FSD Beta’s Build 8.3 should be done QA testing by the end of the following week, which should be around the same time the “Download Beta” button should show up in users’ vehicles. When asked if the FSD Beta will be expanded into Europe, Musk noted that Tesla would be asking regulators for a potential release in the region as well. 

The release of FSD Beta’s Build 8.3 has been teased by the Tesla CEO in recent days, with Musk stating that the update would present ~1,000 improvements to the advanced driver-assist system. Musk posted a warning that the QA process for FSD Beta Build 8.3 would take some time, though he remarked that the update’s release is definitely coming. 

Advertisement
-

The first iteration of the FSD Beta was released in late October last year, and since then, the system has received several important updates from the electric car maker. Videos shared by members of the company’s select group of FSD Beta testers show vehicles operating almost like a human driver at times. Other demos of the feature even included trips from San Francisco to Los Angeles with no human intervention. 

The Full Self-Driving suite is a key pillar of Elon Musk’s vision for the future of transportation. As he noted during Autonomy Day, Tesla eventually plans to release a network of autonomous Robotaxis that utilizes FSD’s full hands-off version. Granted, Tesla’s FSD Beta still requires drivers to keep their hands at the wheel and monitor the road closely, but if Build 8.3 is indeed as impressive as Elon Musk suggests, the upcoming update could prove to be a definitive step towards achieving autonomy. 

Don’t hesitate to contact us for news tips. Just send a message to tips@teslarati.com to give us a heads up. 

Advertisement
-

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

News

Starlink Mini 2 arrives with one feature for true off-grid connectivity

Published

on

Credit: SpaceX

SpaceX officially launched the Starlink Mini 2 on November 10, delivering the first portable Starlink terminal designed around independent power.

Invitation-only preorders for select U.S. customers are priced at $999 plus tax, a figure that includes a full year of Roam Unlimited service valued at roughly $2,100. A refundable $100 deposit reserves the kit, with the balance due at shipment, expected to begin in mid-December. Broader availability is listed as coming soon.

Advertisement
-

The headline feature is the quick-swap 71 Wh battery. Clipped to the rear of the dish without tools, it delivers up to 4.5 hours of connectivity on a single charge.

The 490-gram pack includes its own USB-C port and LED indicators, so users can charge a spare separately and swap it in seconds while staying online. Starlink notes that the terminal can continue operating while the battery charges or run directly from a 60 W USB-C source. The retail box includes one battery, a 60 W USB-C charger, and a 3-meter cable.

Beyond power, the Mini 2 is thinner at 23.1 mm (versus 38.5 mm on the original Mini) while measuring 263 × 314 mm. With the battery and kickstand attached it weighs 1.6 kg.

Built-in Wi-Fi 6 expands coverage to up to 1,800 square feet, an IP67 rating protects against dust and water, and a standard 1/4-20 tripod thread plus physical power button round out the design. Field of view remains 110 degrees, and the unit retains support for mobile use.

For travelers, campers, and remote workers, the swappable battery removes the longstanding requirement for an external power bank or vehicle outlet that defined the first Mini. Spare packs sold separately further extend runtime, turning the compact terminal into a more self-contained solution.

While the bundled $999 invitation price sits well above the original Mini’s current $149 starting point, the included year of service and genuine untethered operation mark a clear step forward in portable satellite internet.

Advertisement
-
Continue Reading

Elon Musk

SpaceX’s $24B Starbase supercomputer plan slipped past a key roadblock

SpaceX wants a Starbase tax break for a $24 billion gas plant and supercomputer campus.

Published

on

By

Concept rendering of SpaceX President Gwynne Shotwell overlooks the company’s Hawthorne, California headquarters as an American flag flies over the campus at sunset.

SpaceX is asking its own company town for a tax break on a $24 billion natural gas power plant and supercomputing facility at Starbase, Texas, and the land it picked sits just outside the reach of a data center moratorium that took effect in neighboring Brownsville last week.

A City of Starbase public hearing notice says SpaceX “proposes to construct, own, and operate a gas-fired power plant and super-compute facility” on roughly 444 acres between Boca Chica Boulevard and the Port of Brownsville. The $24 billion figure covers only the initial phases, and the notice leaves room for future expansions. The Starbase City Commission will consider a property tax abatement and a related economic development agreement at a 7 p.m. hearing on December 9. The notice does not disclose the size or length of the abatement, or how much computing capacity the site would hold.

The location has a history. Over the summer, SpaceX asked Brownsville to remove the tract from its city limits and offered $220 million for water and wastewater projects in return. Brownsville approved the move in August, and Starbase later annexed the land. Brownsville’s own 90-day pause on data center applications took effect last week, and had the tract stayed inside the city, the project likely would have needed a different home.

The power side is already in front of state regulators. SpaceX has applied to the Texas Commission on Environmental Quality for air permits covering 35 mobile gas turbines producing roughly 750 megawatts, according to Politico, which also noted that two of the three Starbase commissioners voting on the incentives are SpaceX executives.

Building its own plant lets SpaceX skip the Texas grid. Gov. Greg Abbott paused new data center grid connections in August pending an audit, but a facility that generates its own electricity does not need one. The air permit still has to clear the TCEQ, where Abbott also ordered a halt on data center permits.

Advertisement
-

The bigger test arrives in January. Governor-elect Gina Hinojosa, who unseated Abbott last week, has said she will block data center approvals until the legislature passes new protections, and she has already asked state officials to hold off on any sale of Boca Chica State Park to SpaceX until she is sworn in. Tesla and SpaceX shares both fell the day after the election, and Musk’s first reaction on X was “Data centers in space looking pretty appealing right now.”

That line points to Starmind, SpaceX’s orbital compute constellation. Musk has said terrestrial compute will be “peanuts compared to orbital compute” and expects monthly orbital deployments to pass ground deployments around the end of 2028, as Teslarati reported. Until then, SpaceX still needs gigawatts on the ground. It ended the third quarter with 1.7 GW of nameplate compute, is targeting 2.5 to 3 GW by the end of this year and wants at least 10 GW more in 2027. Its existing Colossus sites around Memphis already run on gas turbines and face a lawsuit from residents over emissions.

Local reaction is split. The South Texas Environmental Justice Network has announced a protest, citing air quality, water use and energy bills, while some Brownsville residents told the Tribune they welcome the jobs. SpaceX did not respond to the Tribune’s questions about the project.

Continue Reading

Elon Musk

Tesla extends Cybertruck production as Musk concedes ‘sentimentality’

Published

on

Credit: diagnosticdennis/Instagram and @smile__no via Tesla Owners of Santa Clarita Valley/X

Tesla CEO Elon Musk announced that the company will extend Cybertruck production slightly to handle its extensive order backlog.

On Wednesday, Musk announced that “In order to work through more of the Cybertruck order backlog, production will be extended through the end of summer 2027.”

Tesla has already attempted to simplify its last months of production for the Cybertruck by eliminating several trim levels and only offering the Cyberbeast, the most expensive trim that starts at $109,990. The other two trim levels, the Cybertruck All-Wheel-Drive and Premium All-Wheel-Drive have both been discontinued.

There has been plenty of backlash against Tesla’s decision to ax the Cybertruck, but the company’s forecast prioritizes Cybercab and autonomy. Factory space at Gigafactory Texas that is not necessary is now being set aside for the Cybercab as the company truly embraces its “transportation-as-a-service” model.

There is still a slim chance the Cybertruck survives. Last evening, Tesla upfitter Unplugged Performance offered to take the Cybertruck line off of Tesla’s hands and continue building it, along with a CyberSUV.

Nevertheless, Tesla seems to be ending the Cybertruck on its terms after what will be a three-and-a-half-year run. It still does not really feel quite real; I think many of us thought the Cybertruck would be around for years to come.

Musk added more detail, stating that while it was not the smartest move, “there must be some room in this world for sentimentality or what’s the point?”

Other EV pickups on the market have experienced a similar fate.

The Ford F-150 Lightning was axed by the Detroit company due to the continued losses the company took from sales. That truck was never profitable, and Ford is still taking a quarterly loss in its EV side. However, things are moving along as it has plans for a mass market EV pickup, which will likely gather some substantial demand if Ford can get it just right.

Perhaps another extension or even a total change of heart might come. Only Musk knows.

Continue Reading