Connect with us

News

Tesla highlights the Megapack site replacing Hawaii’s last coal plant

Credit: Plus Power (via Hawaiian Electric | LinkedIn)

Published

on

Tesla has highlighted a Megapack project that went live in Hawaii earlier this year, which is effectively replacing the state’s last coal plant.

On Thursday, the Tesla Megapack account on X shared a video featuring interviews with employees and partners involved in Oahu’s Kapolei Energy Storage (KES) system. The site, which went live earlier this year, features 158 Megapack 2XL units for 185MW / 565 MWh, and Tesla Residential Energy Director Colby Hastings says it’s roughly the equivalent of the nearby coal plant that was retired.

The battery energy storage system (BESS) is being operated in partnership with Plus Power, and the project has been considered a success in helping to stabilize the grid in preparation for Hawaii’s upcoming climate goals.

Nearby Chairman Anthony Makana says that the BESS project allowed for the “sunsetting of one of the dirtiest polluters in our community,” referring to the coal plant. The site also comes ahead of Hawaiian Electric’s goal of reaching 100 percent renewable energy by 2045.

The features multiple short interview moments, including a few words from Plus Power CEO Brandon Keefe, who notes that the renewable provider first started working on the project in 2018. You can watch the full video below.

The Oahu KES site first went operational in January, and Tesla Senior VP of Powertrain and Energy Engineering Drew Baglino visited the BESS to celebrate its Comercial Operation Date (COD).

“Stopped by to congratulate the local team on the successful COD of the 185MW Hawaiian Electric Tesla Megapack installation on Oahu today,” Baglino wrote in a post on X.

The final shipment of coal to the Oahu coal plant took place in September 2022, as was highlighted in a post from Tesla CEO Elon Musk.

The video also comes as the latest of Tesla’s efforts to create educational advertising material it shares on its various social media platforms. Although much of the company’s advertising team was reportedly affected by widespread layoffs in April, Tesla has continued to roll out educational ads both for its energy products and its electric vehicles (EVs).

Tesla Energy highlights its ‘Charge on Solar’ feature in latest ad

Advertisement
-

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

The Boring Company’s latest Tesla tunnel truck mod “fits like a glove”

The Boring Company has modified a Tesla powered tunnel truck to carry freight containers underground.

Published

on

By

the-boring-company-tesla-robotaxi

The Boring Company has found a second job for the Tesla hardware it already runs underground. In a post on X, Elon Musk’s tunneling company showed its latest Prufrock Liner Truck modified to carry a standard 20 foot shipping container. “Using TBC tunnels to transport freight,” the company wrote. “The latest Prufrock Liner Truck (using Tesla Model 3 batteries and drive units) has been modified to carry a standard 20′ shipping container. Fits like a glove!”

The photo shows a red container sitting on a long, low white chassis parked outside, with drive hardware visible at one end. The Boring Company did not say where or when freight hauling would start, which customers it has in mind, or how many trucks it is converting.

Advertisement
-

Until now, the liner trucks have hauled concrete. Teslarati reported in August on Liner Truck 3, which uses Model 3 battery packs and drive units to move more than 22,000 pounds of precast tunnel segments to the boring machine. It has 28 miles of range, tops out at 12 mph, and is piloted remotely from the company’s operations center in Texas. The freight version appears to be the same platform with a different bed, and The Boring Company has not said whether it will also be remotely piloted.

Freight has been on the company’s menu for years. When TBC updated its product lineup in 2021, its freight tunnel was described as sized to fit a standard shipping container, “barely.” The company later used the idea at Tesla’s own factory, where Prufrock 3 dug a tunnel to Giga Texas that now moves finished Cybertrucks away from the production line.

The Boring Company closed a $3 billion Series D in September at a $23 billion valuation, and Teslarati has covered how that money is tied to a UAE tunneling push and a faster Nashville build. In Nashville, Prufrock MB1 and MB2 are mining at the same time, and a third machine is expected to launch in late October. Each machine needs a steady supply of liner trucks, so any design that works for segments and containers alike gives the company more use out of the same Tesla parts.

The Vegas Loop remains the only Boring Company system open to the public, and it moves passengers in Tesla vehicles. A freight service would be a separate product, and the post gave no indication that one is close to launch. For now, it is a truck, a container and a short caption saying they fit together.

Continue Reading

Elon Musk

Elon Musk will give ‘every kid in America’ a SpaceX share in 2027

Published

on

Credit: Grok Imagine

Elon Musk said he is planning to give “every one of his SpaceX shares to every kid in America” in 2027, stating that “this will be the first of many.”

SpaceX went public earlier this year, and its stock price has been relatively stable since leveling off shortly after its IPO. Based on its current price, it’s a gift of just over $10 billion to children across the United States.

It appears to be closely related to President Donald Trump’s bank accounts for children, which were set up earlier this year as Trump Accounts.

Just hours earlier, Anthropic had announced the establishment of its Anthropic Public Benefit Fund, “a new wholly-owned entity dedicated entirely to public benefit.” Musk responded by stating he recommended “giving the shares directly to the public,” and that he would be doing it that way.

Just a little bit later, Musk said children across the U.S. would be getting a share from him:

Advertisement
-

There are roughly 70 million children, meaning someone under the age of 18, in the United States, according to the Federal Interagency Forum on Child and Family Statistics. Musk’s ownership of SpaceX stock shows he has around 849 million Class A shares of SpaceX stock, according to filings with the SEC.

Continue Reading

Elon Musk

Elon Musk reveals why Boring Co’s biggest East Coast project never happened

Published

on

(Credit: The Boring Company)

Elon Musk revealed in a post on X that “Permits were impossible to get,” explaining the fate of The Boring Company’s most ambitious East Coast proposal.

The comment responded to a query about what became of his July 20, 2017 announcement that he had “just received verbal govt approval” for an underground Hyperloop connecting New York City, Philadelphia, Baltimore, and Washington, D.C., capable of carrying passengers from the Big Apple to the Nation’s Capital in just 29 minutes.

The Boring Company receives verbal ‘approval’ to build NY to DC Hyperloop tunnel

The 2017 post, which envisioned city-center stations and multiple elevators in each city, sparked immediate scrutiny. Local and state officials in New York, Philadelphia, Baltimore, and D.C. said they had no knowledge of any approval. A White House spokesperson confirmed only “promising conversations” about the transformative infrastructure.

Musk clarified shortly after that there was “still a lot of work” to do for formal approvals.

Limited progress followed, as Maryland Governor Larry Hogan’s administration issued a conditional utility permit and supported work near Fort Meade. In 2018, Washington, D.C., granted a preliminary permit for site preparation and excavation on a vacant lot at 53 New York Ave. NE in the NoMa neighborhood, which The Boring Company said could become a station.

A draft environmental assessment for a D.C.-Baltimore segment was released in 2019. Yet, by April 2021, the company had removed the project from its website, and the Federal Highway Administration reported receiving no indication of further interest. Communication with Maryland officials had ceased.

The full corridor would have required coordination among the District of Columbia, Maryland, Pennsylvania, New York, the Federal Highway Administration, the Army Corps of Engineers, the National Park Service, and other agencies.

Environmental reviews under the National Environmental Policy Act, utility clearances, and approvals for novel infrastructure added to the overall complexity of the project and its approval.

Speculation on the permitting barriers centers around a few factors, but a multi-state, multi-level route involving unproven high-speed vacuum-tube technology inherently triggers exhaustive safety, environmental, and engineering reviews that can stretch for years, even for conventional projects.

Advertisement
-

There are also other elements, of course, like officials who may face political exposure if a privately funded, untested system encountered anything such as cost overruns, delays, or safety issues. On the outset of this project, there were limited things such as engineering plans or demonstrated technology maturity, which also added to the potential skepticism.

The East Coast vision for Boring Co., once framed as a privately funded revolution that could reshape Northeast travel, quietly ended without construction of the promised network. Musk’s recent statement frames the outcome as a regulatory impasse, unfortunate but not unexpected.

Continue Reading