Connect with us

News

Tesla to activate first ultra-fast Supercharger V3.0 this Wednesday

Published

on

Tesla CEO Elon Musk has announced that the first public Tesla V3.0 Supercharger Station will be going live this coming Wednesday, March 6, 2019.

Musk did not drop any additional details for Supercharger V3.0 in his recent tweets, though he did mention last year that the next-generation chargers will have a power output between 200-250 kW, or as much as 50% higher power than Tesla’s current Superchargers. With an even faster charging rate, Tesla will be able to widen the gap between itself and its competitors even further.

Supercharger V3.0’s upgraded output will also allow the company to accommodate more vehicles in its charging facilities, considering that shorter recharging times will result in stalls being open faster for other cars. This will be a crucial advantage for Tesla in the near future, as the company begins rolling out high-volume vehicles like the $35,000 Model 3 and the upcoming Model Y, which is expected to be revealed later this month.

While Tesla’s upcoming Supercharger V3.0 rollout is a way for the electric car maker to establish and emphasize its lead in the electric car market, the Silicon Valley-based company is not the only one developing high-powered charging stations. Volkswagen’s Electrify America, which was established as part of the auto conglomerate’s requirements following its Dieselgate scandal, is installing 350 kW ultra-fast chargers in the United States. Porsche has also announced that its dealers in the United States will be installing Turbo Charging stations, which will have an output of 320 kW. Both these ultra-fast chargers will be compatible with the Porsche Taycan, which is expected to debut later this year.

Elon Musk, for his part, is not intimidated by the higher output of competitors’ charging stations. Explaining this point in the Q1 2018 earnings call, Musk stated that “the thing about a 350 kW charger is that it doesn’t actually make a ton of sense, unless you got a monster battery pack or have like a crazy high C rating. We think 350 kW for a single car; you’re gonna frag the battery pack if you do that.”

Advertisement
-
-

With Tesla’s upcoming Supercharger V3.0 and other ultra-fast charging solutions debuting on the market, electric mobility is closing in on the convenience offered by conventional fuel-ups in gasoline stations.   

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Featured

Tesla finally got its Nevada Robotaxi Permit but with a few catches hard to miss

Nevada granted Tesla’s robotaxi permit, but capped the fleet at just ten vehicles for now.

Published

on

By

Concept art of a Tesla Cybercab in Las Vegas Strip as rendered via Grok

Tesla has received its robotaxi permit in Nevada, more than two months after regulators closed the public comment period on the company’s application. News of the approval surfaced Wednesday night when Tesla investor and longtime company watcher Sawyer Merritt posted a copy of the interim order, and the Nevada Transportation Authority’s own carrier registry now lists the permit, AVNC Permit 002 under Docket 26-05015, as active for Tesla Robotaxi, LLC.

Tesla asked Nevada in June for authority to run up to 5,000 vehicles in Clark County within a year, however the permit the NTA issued is initially capping Tesla at ten fully autonomous vehicles and confines them to a defined geofence along the Las Vegas Strip corridor. Any expansion of that operating area, or any increase to the fleet size, requires the NTA’s approval first.

The order also sets rules that look more restrictive than what Tesla runs in Austin. Rides are barred on roads with posted speed limits above 45 miles per hour, pickups are off limits within a quarter mile of Harry Reid International Airport without separate authorization, and every vehicle has to carry visible “Robotaxi” markings while notifying riders before each trip that no one is driving. The order also requires “appropriate human supervision”, language that suggests Nevada isn’t ready to let Tesla offer the rides without a safety monitor that it has run in parts of Austin since January. As with standard protocol with robotaxi services, Tesla must report any accident, system failure, or vehicle that becomes stranded on a Nevada road within five business days.

Tesla is entering a market Nevada already knows well. Zoox, the Amazon owned robotaxi company, has run its own autonomous vehicle permit in the state since last year, building up to roughly 100 vehicles and 350,000 rides along the Strip. That history likely explains why the NTA started Tesla at ten cars rather than the fleet size the company asked for. The agency has a template for scaling a permit up once a company proves out its safety record.

Advertisement
-
-

Tesla’s Nevada application first surfaced in June, when the company filed for the permit alongside plans for a maintenance hub in southwest Las Vegas. The company has said it won’t meaningfully scale its robotaxi fleet anywhere until FSD v15 ships, expected in late 2026 or early 2027, which makes the ten vehicle cap less of a constraint today than it might look on paper. For now, Tesla has the legal right to start Nevada rides. Whether it starts before FSD v15 arrives is a separate question the permit doesn’t answer.

Continue Reading

Energy

Tesla launches Powerwall Lease for affordable home backup

Published

on

Credit: Tesla

Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.

Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.

This credit lowers the effective cost to roughly $35 per month plus applicable tax.

Advertisement
-
-

Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.

The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.

Tesla announces 100k Powerwalls are participating in Virtual Power Plants

Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.

Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.

The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.

Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.

Advertisement
-
-
Continue Reading

News

Elon Musk teases Tesla Roadster unveiling once again

Published

on

tesla roadster
Credit: Tesla

Elon Musk continues to tease the unveiling event for the Tesla Roadster, a continuing trend that has grown into a bigger game of “When” for fans who have been waiting years for the car to finally enter production.

A video shared on X of the Joe Rogan Experience podcast that Musk appeared on last year, teasing the Roadster unveiling, was shared once again on the social media platform. The poster said the Roadster event will be “unforgettable.”

Musk agreed:

The timing is interesting because just yesterday, Musk said that we will be getting flying cars, and for years, Tesla has hinted that it could develop a SpaceX cold gas thruster package that would help the car float or fly for a short period of time.

It would be reasonable to assume Tesla’s major delays with this unveiling event are likely caused by the company’s need to break the rules and push the envelope on nearly everything. Last July, Lars Moravy, Tesla’s VP of Vehicle Engineering, said:

Advertisement
-
-

“Roadster is definitely in development. We did talk about it last Sunday night. We are gearing up for a super cool demo. It’s going to be mind blowing. We showed Elon some cool demos last week of the tech we’ve been working on and he got a little excited.”

The latest updates that Tesla has given us are that the Roadster is in design development, and it did have several potential dates for an unveiling event this year, including April. It was then pushed to August.

However, there are no clues as to when Tesla will be ready, and fans are certainly getting frustrated with the delays.

For what it is worth, Franz von Holzhausen told Jay Leno this week that the event would be “very soon.”

We sure hope.

Continue Reading