Connect with us

News

Tesla Supercharger V4 gets early tests from EV owners

Image Credit: electricfelix/YouTube

Published

on

Tesla’s Supercharger V4 rollout seems to be ramping in Europe, so it’s no surprise that images of the next-generation charging station have been shared online. It was also no surprise that videos have emerged depicting Tesla owners charging their vehicles at the newly-installed Supercharger V4 stations. 

As noted in a previous Teslarati report, Tesla’s Supercharger V4 stations feature some changes from the company’s previous generation chargers. These include a longer charging cable that can accommodate more non-Tesla vehicles, as well as a higher amperage of 615 A, as per a panel label that was photographed at a V4 stall. Their output for now, however, is reportedly rated at 250 kW, similar to V3 chargers. 

This was confirmed by Tesla Model S owner Esther Kokkelman, who noted in a recent video that her experience with the EV maker’s Supercharger V4 station is comparable to the existing V3 network. It should be noted that Kokkelman’s vehicle is a Model S 85, one of Tesla’s legacy vehicles, but it was able to take advantage of the Supercharger V4’s rapid charging speed just fine. 

Similar observations were shared by a fellow Tesla owner in the Netherlands who goes by the name electricfelix on YouTube, who was fortunate enough to test out a Supercharger V4 stall before it was even listed in the company’s in-vehicle navigation system. Similar to the Model S 85 owner’s observations, the NL-based Tesla owner had no issues connecting to the next-generation charger. His car, however, did not experience V3 level charge rates partly because its battery charge is not optimized for the fastest charging speed. 

Advertisement

Tesla’s Supercharger V4 rollout seems to be exclusive to Europe for now, though the company is hard at work ramping their production at Gigafactory New York. Tesla’s Supercharger production team would likely be extremely busy in the future, particularly as the company expands the network further and builds out the Megacharger network for the Tesla Semi. 

Watch a video of Tesla’s Supercharger V4 in action below. 

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Advertisement

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Starlink powers Europe’s first satellite-to-phone service with O2 partnership

The service initially supports text messaging along with apps such as WhatsApp, Facebook Messenger, Google Maps and weather tools.

Published

on

Credit: SpaceX

Starlink is now powering Europe’s first commercial satellite-to-smartphone service, as Virgin Media O2 launches a space-based mobile data offering across the UK.

The new O2 Satellite service uses Starlink’s low-Earth orbit network to connect regular smartphones in areas without terrestrial coverage, expanding O2’s reach from 89% to 95% of Britain’s landmass.

Under the rollout, compatible Samsung devices automatically connect to Starlink satellites when users move beyond traditional mobile coverage, according to Reuters.

The service initially supports text messaging along with apps such as WhatsApp, Facebook Messenger, Google Maps and weather tools. O2 is pricing the add-on at £3 per month.

Advertisement

By leveraging Starlink’s satellite infrastructure, O2 can deliver connectivity in remote and rural regions without building additional ground towers. The move represents another step in Starlink’s push beyond fixed broadband and into direct-to-device mobile services.

Virgin Media O2 chief executive Lutz Schuler shared his thoughts about the Starlink partnership. “By launching O2 Satellite, we’ve become the first operator in Europe to launch a space-based mobile data service that, overnight, has brought new mobile coverage to an area around two-thirds the size of Wales for the first time,” he said.

Satellite-based mobile connectivity is gaining traction globally. In the U.S., T-Mobile has launched a similar satellite-to-cell offering. Meanwhile, Vodafone has conducted satellite video call tests through its partnership with AST SpaceMobile last year.

For Starlink, the O2 agreement highlights how its network is increasingly being integrated into national telecom systems, enabling standard smartphones to connect directly to satellites without specialized hardware.

Advertisement
Continue Reading

Elon Musk

Elon Musk’s Starbase, TX included in $84.6 million coastal funding round

The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.

Published

on

Credit: SpaceX/X

Elon Musk’s Starbase, Texas has been included in an $84.6 million coastal funding round announced by the Texas General Land Office (GLO). The funds mark another step in the state’s ongoing beach restoration and resilience efforts along the Gulf Coast.

Texas Land Commissioner Dawn Buckingham confirmed that 14 coastal counties will receive funding through the Coastal Management Program (CMP) Grant Cycle 31 and Coastal Erosion Planning and Response Act (CEPRA) program Cycle 14. Among the Brownsville-area recipients listed was the City of Starbase, which is home to SpaceX’s Starship factory.

“As someone who spent more than a decade living on the Texas coast, ensuring our communities, wildlife, and their habitats are safe and thriving is of utmost importance. I am honored to bring this much-needed funding to our coastal communities for these beneficial projects,” Commissioner Buckingham said in a press release

“By dedicating this crucial assistance to these impactful projects, the GLO is ensuring our Texas coast will continue to thrive and remain resilient for generations to come.”

Advertisement

The official Starbase account acknowledged the support in a post on X, writing: “Coastal resilience takes teamwork. We appreciate @TXGLO and Commissioner Dawn Buckingham for their continued support of beach restoration projects in Starbase.”

The funding will support a range of coastal initiatives, including beach nourishment, dune restoration, shoreline stabilization, habitat restoration, and water quality improvements.

CMP projects are backed by funding from the National Oceanic and Atmospheric Administration and the Gulf of Mexico Energy Security Act, alongside local partner matches. CEPRA projects focus specifically on reducing coastal erosion and are funded through allocations from the Texas Legislature, the Texas Hotel Occupancy Tax, and GOMESA.

Checks were presented in Corpus Christi and Brownsville to counties, municipalities, universities, and conservation groups. In addition to Starbase, Brownsville-area recipients included Cameron County, the City of South Padre Island, Willacy County, and the Willacy County Navigation District.

Advertisement
Continue Reading

Elon Musk

The Boring Company wins key approval for Nashville Music City Loop

The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system.

Published

on

the boring company's vegas loop entrance
(Credit: Sam Morris, LVCVA/Las Vegas News Bureau)

Tennessee Gov. Bill Lee announced that the Tennessee Department of Transportation (TDOT) and the Federal Highway Administration (FHWA) have jointly approved The Boring Company’s lease application and enhanced grading permit for the Music City Loop.

The approval allows The Boring Company to use state-owned right-of-way along Tennessee’s highway system, clearing a key hurdle for the privately funded tunnel project that aims to connect downtown Nashville to Nashville International Airport in approximately eight minutes, the Office of the TN Governor wrote in a press release.

“Tennessee continues to lead the nation in finding innovative solutions to accommodate growth, and in partnership with The Boring Company, we are exploring possibilities we couldn’t achieve on our own,” Gov. Lee said in a statement.

“The Boring Company is grateful for the leadership and hard work of federal, state, and local agencies in bringing this project to a shovel-ready point,” The Boring Company President Steve Davis said. “Music City Loop will be a safe, fast, and fun public transportation system, and we are excited to build it in Nashville.”

Advertisement

With lease and permitting approvals secured, The Boring Company will move forward with the Loop system’s construction immediately. The first segment of the Loop system is expected to be operational by the end of the year.

The Music City Loop will run beneath state-owned roadways and is designed to connect downtown Nashville to the airport, as well as lower Broadway to West End. The project will be 100% privately funded.

“The Music City Loop shows what’s possible when we leverage private-sector innovation and American ingenuity to solve transportation challenges,” said U.S. Transportation Secretary Sean Duffy. “TDOT’s lease approval will help advance this ambitious project as we work to reduce congestion and make travel more seamless for the American people.”

The Boring Company described the Loop as an all-electric, zero-emissions, high-speed underground transportation system that will meet or exceed safety standards. The Vegas Loop, for one, earned a 99.57% safety and security rating from the DHS and the TSA, the highest score ever awarded to any transportation system.

Advertisement
Continue Reading