News
High winds scrub SpaceX Starship SN9’s Monday launch attempt
Update (2:30 pm CST): SpaceX appears to have called off Monday’s Starship SN9 launch attempt due (primarily) to high winds along the flight corridor. Additional opportunities are available from 8 am to 6 pm CST (UTC-6) on Tuesday (Jan 26) and Wednesday (Jan 27).
Technically, lacking any official confirmation, there’s still a chance of a launch attempt or additional ground testing happening today but either possibility is extremely unlikely at this point.
Update: SpaceX has completed what is known as a Flight Readiness Review (FRR) and determined that Starship prototype SN9 is ready to attempt its first high-altitude launch as early as today.
All necessary aviation and maritime notices and restrictions are in place and the company has begun the process of closing a public highway and clearing the launch site of employees. Today’s (Jan 25) launch window lasts from noon to 6 pm CST (UTC-6) and Starship SN9 could likely be made ready to launch anytime after 2pm be ready to fly as early as 4 pm CST according to a loudspeaker announcement at the launch pad. Stay tuned for updates and, hopefully, an official SpaceX webcast.
All signs point to SpaceX’s second high-altitude Starship prototype preparing for a 12.5-kilometer (~40,000 ft) as early as Monday, January 25th in a bid to rectify a last-second bug that caused its predecessor to explode last month.
Known as Starship serial number 8 (SN8), the SpaceX-built prototype was the first to have its basic airframe (tank and nose sections) fully integrated, as well as the first Starship to attempt to break the 150m (~500 ft) ceiling set by Starhopper, SN5, and SN6. Break the ceiling SN8 most certainly did, performing a spectacularly successful 12.5 km launch that aced almost every single goal SpaceX had hoped to complete. Keyword almost.
After an impressive 280 seconds of uninterrupted operation of its Raptors, Starship SN8 shut down the last of those three engines, flipped onto its belly, and successful freefell ~12 kilometers back to Earth. The rocket then carried that success even further, reigniting two Raptors, performing a dramatic 120-degree flip, orienting itself vertically, and beginning to slow down for a soft landing.
Only then did Starship SN8’s performance deviate from virtual perfection. At T+6:38, a few seconds after beginning its crucial landing burn, one of Starship’s active Raptors shut down and the other effectively stopped generating thrust. The reason, CEO Elon Musk would later explain, was low head pressure in a smaller tank (‘header tank’) dedicated to supplying fuel during Starship’s wild flip and landing maneuver. It was never confirmed if the Raptor engine shutdown observed milliseconds prior to the other engine losing thrust was intentional.
Cause aside, the end result was unsurprising: without enough thrust to slow down, Starship SN8 accurately impacted the concrete landing zone but did so at high speed – likely around 50-60 m/s (100-150 mph). Given that Starhopper and Starships SN5 and SN6 had already successfully proven Starship’s ability to gently land from 150 meters on a single Raptor engine and that, prior to SN8, Starship’s bizarre belly-flop descent and 90-degree flip had been almost entirely theoretical, SpaceX deemed the launch a spectacular success.
Nothing better exemplifies that than the fact that a little over a month later, SpaceX quite literally began scrapping the most complex, completed section of a future Starship prototype (SN12) before it ever reached the assembly phase. Instead, SpaceX appears to be more focused than ever on a mysterious series of “major” upgrades Musk has said will debut on Starship SN15. Nearly all SN15 subsections have been completed and are simply waiting to be joined together, while parts of SN16 and SN17 are also starting to pile up in staging areas.
Starship SN10 is practically ready to move to the launch pad to prepare for flight as soon as SpaceX chooses to do so and Starship SN11 is likely no more than a week or two of work away from reaching same level of readiness.
Ultimately, despite a long and delay-ridden test campaign, Starship SN9 finally completed what looked like a full-duration static fire of all three of its Raptor engines – the rocket’s sixth static fire overall. On Saturday, January 23rd, SpaceXers installed SN9’s flight termination system (FTS) – a system of explosives designed to destroy Starship if it flies too far off course. For Starship, FTS installation all but guarantees that a launch attempt is a matter of days away. Fresh county roadblocks, Temporary Flight Restrictions (TFRs) granted by the FAA, and Coast Guard a safety notice further imply that SN9 will attempt to launch as early as Monday morning, January 25th, with backup opportunities on Tuesday and Wednesday.
With any luck, like SN8’s high-altitude debut, SpaceX hopefully livestream Starship SN9’s own attempt at the same feat. Stay tuned for more details as they come.
News
Tesla Robotaxi service in Austin achieves monumental new accomplishment
Tesla Robotaxi services in Austin have been operating since last Summer, but Tesla has admittedly been delayed in its expansion of the geofence, fleet size, and other details in a bid to prioritize safety as new technology rolls out.
But those barriers are being broken with new guardrails being removed from the program.
Tesla has achieved a significant advancement in its autonomous ride-hailing program. As of May 4, the Robotaxi fleet in Austin, Texas, has begun operating unsupervised during evening hours for the first time. This expansion moves beyond previous limitations that restricted unsupervised service to daylight hours, typically ending in mid-afternoon.
Tesla Robotaxi in Austin is operating unsupervised in the evenings for the first time today.
Previously in Austin, unsupervised operation ended mid-afternoon
— Robotaxi Tracker (@RtaxiTracker) May 4, 2026
The change brings Austin in line with operations in Dallas and Houston. Those cities have supported evening unsupervised runs since their initial launches in April, and both recently received additions of new unsupervised vehicles to their fleets. This coordinated progress across Texas strengthens Tesla’s regional presence and provides a broader testing ground for the technology.
This milestone carries substantial weight in the development of autonomous vehicles. Extending operations into low-light conditions meaningfully expands the Robotaxi’s operational design domain (ODD)—the specific environments and scenarios in which the system is approved to operate safely without human intervention.
Nighttime driving presents unique technical demands: diminished visibility, headlight glare from oncoming traffic, reduced contrast for identifying pedestrians and lane markings, and greater variability in camera sensor exposure.
Tesla’s pure vision approach, powered by neural networks trained on vast real-world datasets rather than lidar or pre-mapped routes, must handle these variables reliably. Demonstrating consistent unsupervised performance after sunset validates the robustness of the end-to-end AI stack and its ability to generalize across diverse lighting conditions.
Beyond technical validation, the expansion holds important operational and economic implications. Evening hours often coincide with peak urban demand for rides, including commutes, dining, and entertainment outings.
Enabling service during these periods increases daily vehicle utilization, allowing each Robotaxi to generate more revenue while gathering additional high-value training data. Higher utilization accelerates the virtuous cycle of data collection, model improvement, and further ODD growth.
Looking ahead, this step paves the way for more ambitious rollouts. Success in low-light environments positions Tesla to pursue near-24-hour operations, potentially integrating highways and expanding into varied weather patterns. Regulators worldwide frequently demand evidence of safe performance across day-night cycles before granting wider approvals.
Proven capability in Texas could expedite deployments in planned cities such as Phoenix, Miami, Orlando, Tampa, and Las Vegas during the first half of 2026.
Tesla confirms Robotaxi expansion plans with new cities and aggressive timeline
Moreover, scaling evening service supports Tesla’s long-term vision of a high-efficiency robotaxi network. Greater fleet productivity lowers the cost per mile, making autonomous mobility more accessible and competitive against traditional ride-hailing.
As the company iterates on software updates informed by nighttime data, reliability is expected to compound rapidly, unlocking denser urban coverage and longer-distance trips.
In summary, the introduction of an unsupervised evening Robotaxi service in Austin represents more than an incremental schedule adjustment. It signals a critical maturation of the underlying technology and sets the foundation for broader geographic and temporal expansion.
With Texas operations gaining momentum, Tesla is steadily advancing toward transforming urban transportation at scale.
Cybertruck
Tesla Cybercab just rolled through Miami inside a glass box
Tesla paraded a Cybercab in a glass display at Miami’s F1 Grand Prix event this week.
Tesla set up an “Autonomy Pop-Up” at Lummus Park in Miami Beach from April 29 through May 3, 2026, embedded within the official F1 Miami Grand Prix Fan Fest. The centerpiece was a Cybertruck towing the Cybercab inside a glass display case marked “Future is Autonomous,” rolling through the beachfront crowd.
Miami is on Tesla’s confirmed list of cities for robotaxi expansion in the first half of 2026, making the promotion a strategic promotion that lays groundwork in a target market.
This was not Tesla’s first time using Miami as a showcase city. In December 2025, Tesla hosted “The Future of Autonomy Visualized” at its Miami Design District showroom, coinciding with Art Basel Miami Beach. That event featured the Cybercab prototype and Optimus robots interacting with attendees. The F1 pop-up this week marks Tesla’s return to Miami and follows a pattern Tesla has been running since early 2026. Just two weeks before Miami, Tesla stationed Optimus at the Tesla Boston Boylston Street showroom on April 19 and 20, directly on the final stretch of the Boston Marathon, letting tens of thousands of runners and spectators meet the robot for free, generating massive earned media at zero advertising cost.
Tesla is sending its humanoid Optimus robot to the Boston Marathon
Tesla has confirmed plans to expand its robotaxi service to seven cities in the first half of 2026, including Dallas, Houston, Phoenix, Miami, Orlando, Tampa, and Las Vegas, building on the unsupervised service already running in Austin. Musk has said he expects robotaxis to cover between a quarter and half of the United States by end of year. On the production side, Musk told shareholders that the Cybercab manufacturing process could eventually produce up to 5 million vehicles per year, targeting a cycle time of one unit every ten seconds. Scaling robotaxis to 10 million operational units over the next ten years is a key condition of his compensation package, alongside selling 20 million passenger vehicles.
As for the Cybercab’s price, Musk has said buyers will be able to purchase one for under $30,000, with an average operating cost around $0.20 per mile. Whether those numbers hold through full production remains to be seen.
Cybercab at F1 Fan Fest in Miami
by
u/Joshalander in
teslamotors
News
Tesla Semi gets new product launch as mass manufacturing hits Plaid Mode
While the 1.2 MW Megacharger handles quick 30-minute en-route boosts, the Basecharger serves as a reliable overnight solution for longer dwell times at warehouses, distribution centers, fleet yards, and even, potentially, homes.
The Tesla Semi is getting a new production launch as mass manufacturing on the all-electric truck is gearing up to hit Plaid Mode.
Tesla has introduced a game-changing addition to its commercial charging lineup with the new 125 kW Basecharger for Semi. Launched this week as part of the new “Semi Charging for Business” program, this compact unit is purpose-built for depot and overnight charging of Tesla Semi trucks.
While the 1.2 MW Megacharger handles quick 30-minute en-route boosts, the Basecharger serves as a reliable overnight solution for longer dwell times at warehouses, distribution centers, fleet yards, and even, potentially, homes.
Our new 125 kW Basecharger is designed for longer dwell times and overnight charging of Semis. It’s the “home charging” for heavy-duty fleets.
It features a fully integrated design that eliminates the need for a separate AC-to-DC cabinet, simplifying installation. The 6 meter… https://t.co/ovy1C4PsRW pic.twitter.com/vBUCNMzs57
— Tesla Charging (@TeslaCharging) May 1, 2026
Delivering up to 60 percent of the Semi’s range in roughly four hours, perfect for overnight top-ups during mandated driver rest periods or while trucks are loaded or unloaded. Its fully integrated design eliminates the need for bulky separate AC-to-DC cabinets.
Tesla engineers tucked one of the power modules from a V4 Supercharger Cabinet directly inside the sleek post, resulting in a compact footprint. It also features a six-meter cable for layout flexibility. This is one thing that must have been learned through the V4 Supercharger rollout.
Installation and operating costs drop dramatically thanks to daisy-chaining. Up to three Basechargers can share a single 125 kVA breaker, slashing electrical infrastructure requirements. The unit outputs 150 amps continuous across an 180–1,000 VDC range, matching the Semi’s high-voltage architecture while supporting the MCS 3.2 standard.
Tesla Semi sends clear message to Diesel rivals with latest move
Priced from $40,000 for a minimum order of two units, the Basecharger is far more affordable than the $188,000 Megacharger setup for two posts. Deliveries begin in early 2027. Buyers also receive Tesla’s full network-level software, remote monitoring, maintenance, and a guaranteed 97 percent or higher uptime—critical for fleet reliability.
This launch arrives as Tesla accelerates high-volume Semi production at its Nevada factory, targeting 50,000 units annually. By pairing affordable depot charging with ultra-fast highway options, Tesla removes one of the biggest obstacles to electrifying Class 8 trucking: infrastructure cost and complexity.
Fleet operators stand to gain lower electricity rates during off-peak hours, dramatically reduced maintenance compared to diesel, and quieter yards at night. The Basecharger isn’t just another charger—it’s the practical bridge that makes large-scale electric semi adoption economically viable.
With the Basecharger handling “home” duties and Megachargers powering the road, Tesla is delivering a complete ecosystem that could finally tip the scales toward zero-emission freight. For trucking companies ready to go electric, the future just got a whole lot more charger-friendly.