Connect with us
ford f-150 lightning ford f-150 lightning

News

Ford’s Farley commits to 600k units in 22 months: ‘I think we’re one of the first to scale’

One year after Ford confirmed construction of the Rouge Electric Vehicle Center in Dearborn, Mich., the first Ford F-150 Lightning pre-production units begin leaving the factory. Pre-production model shown. F-150 Lightning available starting spring 2022.

Published

on

Ford Motor Company CEO Jim Farley said the Detroit automaker is committed to delivering 600,000 all-electric vehicles within the next 22 months.

Farley, who has spearheaded Ford’s commitment to transitioning to electric vehicles, joined Fox Business this morning ahead of a meeting with President Joe Biden later today. Farley, along with General Motors CEO Mary Barra, will meet with the President and several other CEOs from various industries later today.

In a lofty goal commitment, Farley stated that Ford would deliver 600,000 new electric cars to customers in less than two years because the American automotive industry is in desperate need to “catch up.”

Farley mentioned how China and Europe, two leading electric vehicle markets, have incredible demand for EVs. In some European markets, like Norway, combustion engine vehicles are hard to come by, as electric powertrains dominate the country’s passenger market.

Advertisement

“We have to catch up,” Farley said in an interview with Grady Trimble. “We’re going to do the investment in the product and capacity expansion and make vehicles as affordable as possible. We need the government’s help to make the switch to e-mobility through consumer incentives.”

President Biden has specific EV incentives listed in his Build Back Better plan, but it is having a hard time making it through the Senate after the House of Representatives passed the bill on November 19. However, Senator Joe Manchin has not supported the bill due to massive budgetary issues. It needs support from all 50 Democratic senators, which seems unlikely.

Nevertheless, Farley and Ford are committed to an electrified future. Recently, Farley increased the production plans for the F-150 Lightning by boosting production goals to 150,000 units per year. Initial projections were for around 40,000 units annually. This was doubled to 80,000 per year in September and essentially doubled again in early January to 150,000.

One year after Ford confirmed construction of the Rouge Electric Vehicle Center in Dearborn, Mich., the first Ford F-150 Lightning pre-production units begin leaving the factory. Pre-production model shown. F-150 Lightning available starting spring 2022.

Farley does not feel that the massive goal for deliveries in just 22 months is out of reach, especially as Ford has leveraged the names of its most iconic models to help surge sales of its newfound electrification project. “I think we’re one of the first to scale. We’re committed to 600,000 units in 22 months from now,” Farley said in the interview. “What makes us different is we’re electrifying our most iconic vehicles where we sell the best.” The Mustang Mach-E accumulated 27,140 sales in 2021, making it the second best-selling model in its class, trailing only the Tesla Model Y.

Ford is also utilizing the solid consumer base behind the F-150, which has been the nation’s best-selling pickup truck for several years. The F-150 Lightning, which Ford recently opened order banks for, has several different trim options, all of which sport iconic packages that have been included with the combustion engine version.

Advertisement

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

Elon Musk’s last manually driven Tesla will do something no other production car will do

Elon Musk confirmed the Roadster as Tesla’s last manually driven car, with a debut coming soon.

Published

on

By

Tesla Roadster driving along sunset cliff (Credit: Grok)

During Tesla’s Q1 2026 earnings call on April 22, Elon Musk made a brief but notable comment about the long-awaited next generation Roadster while describing Tesla’s future vehicle lineup. “Long term, the only manually driven car will be the new Tesla Roadster,” he said. “Speaking of which, we may be able to debut that in a month or so. It requires a lot of testing and validation before we can actually have a demo and not have something go wrong with the demo.”

That single statement is the entire Roadster update from yesterday’s call, and while it represents another timeline shift, it comes as no surprise with Tesla heads-down-at-work on the mass rollout of its Robotaxi service across US cities, and the industrial scale production of the humanoid Optimus.

The fact that Musk specifically framed the Roadster as the last manually driven Tesla is significant on its own. As the rest of the lineup moves toward full autonomy, the Roadster becomes something rare in the Tesla-sphere by keeping the driver in control. Driving enthusiasts who buy a $200,000 supercar are not doing so to be passengers. They want the physical connection to the road, the feel of acceleration under their own input, and the experience of controlling something with that level of performance. FSD, however capable it becomes, removes that entirely. The Roadster signals that Tesla understands this distinction and is building a car specifically for the people who consider driving itself the point.

Tesla isn’t joking about building Optimus at an industrial scale: Here we go

Advertisement

The specs for the Roadster Musk has teased over the years are genuinely unlike anything in production. The base model targets 0 to 60 mph in 1.9 seconds, a top speed above 250 mph, and up to 620 miles of range from a 200 kWh battery. The optional SpaceX package takes it further, rumored to add roughly ten cold gas thrusters operating at 10,000 psi, borrowed directly from Falcon 9 rocket technology. With thrusters, Musk has claimed 0 to 60 mph in as little as 1.1 seconds. In a 2021 Joe Rogan interview he went further, stating “I want it to hover. We got to figure out how to make it hover without killing people.” Tesla filed a patent for ground effect technology in August 2025, suggesting the hover concept has not been abandoned. The starting price remains $200,000, with the Founders Series requiring a $250,000 full deposit. Some reservation holders placed those deposits in 2017 and are approaching a full decade of waiting.

With production now targeted for 2027 or 2028 at the earliest, the Roadster remains Tesla’s most audacious promise and its longest-running delay. But if what Musk is testing lives up to even half of what he has described, the demo alone should be worth waiting for.

Continue Reading

Elon Musk

Tesla confirmed HW3 can’t do Unsupervised FSD but there’s more to the story

Tesla confirmed HW3 vehicles cannot run unsupervised FSD, replacing its free upgrade promise with a discounted trade-in.

Published

on

By

tesla autopilot

Tesla has officially confirmed that early vehicles with its Autopilot Hardware 3 (HW3) will not be capable of unsupervised Full Self-Driving, while extending a path forward for legacy owners through a discounted trade-in program. The announcement came by way of Elon Musk in today’s Tesla Q1 2026 earnings call.

The history here matters. HW3 launched in April 2019, and Tesla sold Full Self-Driving packages to owners on the understanding that the hardware was sufficient for full autonomy. Some owners paid between $8,000 and $15,000 for FSD during that period. For years, as FSD’s AI models grew more demanding, HW3 vehicles fell progressively further behind, eventually landing on FSD v12.6 in January 2025 while AI4 vehicles moved to v13 and then v14. When Musk acknowledged in January 2025 that HW3 simply could not reach unsupervised operation, and alluded to a difficult hardware retrofit.

Advertisement

The near-term offering is more concrete. Tesla’s head of Autopilot Ashok Elluswamy confirmed on today’s call that a V14-lite will be coming to HW3 vehicles in late June, bringing all the V14 features currently running on AI4 hardware. That is a meaningful software update for owners who have been frozen at v12.6 for over a year, and it represents genuine effort to keep older hardware relevant. Unsupervised FSD for vehicles is now targeted for Q4 2026 at the earliest, with Musk describing it as a gradual, geography-limited rollout.

For HW3 owners, the over-the-air V14-lite update is welcomed, and the discounted trade-in path at least acknowledges an old obligation. What happens next with the trade-in pricing will define how this chapter ultimately gets written. If Tesla prices the hardware path fairly, acknowledges what early adopters are owed, and delivers V14-lite on the June timeline it committed to today, it has a real opportunity to convert one of the longest-running sore subjects among early adopters into a loyalty story.

Continue Reading

Elon Musk

Tesla isn’t joking about building Optimus at an industrial scale: Here we go

Tesla’s Optimus factory in Texas targets 10 million robots yearly, with 5.2 million square feet under construction.

Published

on

By

Tesla’s Q1 2026 Update Letter, released today, confirms that first generation Optimus production lines are now well underway at its Fremont, California factory, with a pilot line targeting one million robots per year to start. Of bigger note is a shared aerial image of a large piece of land adjacent to Gigafactory Texas, that Tesla has prominently labeled “Optimus factory site preparation.”

Permit documents show Tesla is seeking to add over 5.2 million square feet of new building space to the Giga Texas North Campus by the end of 2026, at an estimated construction investment of $5 billion to $10 billion. The longer term production target for that facility is 10 million Optimus units per year. Giga Texas already sits on 2,500 acres with over 10 million square feet of existing factory floor, and the North Campus expansion is being built to support multiple projects, including the dedicated Optimus factory, the Terafab chip fabrication facility (a joint Tesla/SpaceX/xAI venture), a Cybercab test track, road infrastructure, and supporting facilities.

Credit: TESLA

Texas makes strategic sense beyond the existing infrastructure. The state’s tax structure, lower labor costs relative to California, and the proximity to Tesla’s AI training cluster Cortex 1 and 2, both located at Giga Texas and now totaling over 230,000 H100 equivalent GPUs, means the Optimus software stack and the factory producing the hardware will share the same campus. Tesla’s Q1 report also confirmed completion of the AI5 chip tape out in April, the inference processor designed specifically to power Optimus units in the field.

As Teslarati reported, the Texas facility is intended to house Optimus V4 production at full scale. Musk told the World Economic Forum in January that Tesla plans to sell Optimus to the public by end of 2027 at a price between $20,000 and $30,000, stating, “I think everyone on earth is going to have one and want one.” He has previously pegged long term demand for general purpose humanoid robots at over 20 billion units globally, citing both consumer and industrial use cases.

Advertisement
Continue Reading