Connect with us

Lifestyle

My Top Five Tesla Motors Moments in 2014

Published

on

Each year, Tesla seems to top the previous year with developments and breaking news, and 2014 was no different. Here’s my list of top Tesla Motors moments in 2014:

Tesla's CEO, Elon Musk discussing the footprint of the Gigafactory and its energy needs.

Tesla’s CEO, Elon Musk discussing the footprint of the Gigafactory and its energy needs.

5 – Did you say a $5 Billion Gigafactory? In late March, Tesla announced that four states were in the running for the $5 billion Gigafactory that would produce up to 50-GW-h of battery packs per year and 35-GW-h of energy storage packs per year by 2020. Fast forward to later this year and JB Straubel, CTO, Tesla Motors, said “We’re a bit ahead of schedule in the Gigafactory than what we previously communicated. We felt it was important to go as fast as we possibly could and start some production operations in 2016.”

4 – So who won? I can’t leave you hanging, right? The winner of the Gigafactory sweepstakes was Reno, Nevada and it was announced in September 2014. The entire Nevada legislature voted to approve the land and tax incentives received by Tesla Motors. Of course, old media gnats took a swipe at the incentives that Tesla Motors received, based on the fact the company is only ten years old and not a bloated 20th century company, such as Boeing and Volkswagen.

Just this last year, VW received $230 million dollars from the state of Tennessee for plant expansion that creates 2,000 jobs, compared to the 5,000 jobs at the Gigafactory. Musk is big target. This is a great, “Inside Elon Musk’s 1.4 Gigafactory Score,” and it details the competition among states and Tesla Motor’s dealmaking approach.

3- Rising Tides Lifts All Boats, right? So how do you accelerate auto electrification in the industry? Just release your patents. That’s what Tesla Motors did on June 12, 2014 via the blog post, “All Our Patent Are Belong to You,” and it created a big Internet, social media and media buzz for weeks. During the summer, there was conjecture that BMW was talking with Elon Musk, but nothing came out of it.

So why did they do it? From Musk’s blog post: “At Tesla, however, we felt compelled to create patents out of concern that the big car companies would copy our technology and then use their massive manufacturing, sales and marketing power to overwhelm Tesla. We couldn’t have been more wrong. The unfortunate reality is the opposite: electric car programs (or programs for any vehicle that doesn’t burn hydrocarbons) at the major manufacturers are small to non-existent, constituting an average of far less than 1% of their total vehicle sales.”

2- Against It! It can’t be a completely groovy list, right? Back in March, the state of New Jersey blocked Tesla Motors from selling its cars via a non-elected Commissioner board that announced its ruling on Monday morning (public debate ran from 10:37 – 11:15) and voted to approve the ban later that day… Democracy and free markets, not in New Jersey…Michigan…Missouri, Texas, but I digress. The greed freaks (the state dealer association) and their political minions in New Jersey made sure no Tesla Motors retail stores could exist. The “honorable” Governor Christie said there were no talks between the company and his office, and Christie felt it was an issue that the legislature could rectify.

Advertisement
-

1- All Things D The winner for 2014 is the “All Things D” event and announcement of the Model S P85D (all-wheel drive) that provides the Silicon Valley automaker a new market segment to reach in the coming years and compete with the BMW i8’s price range or higher-end Jaguars and BMW sedans and coupes. Musk tweeted and the Internet followed all the way to southern California, where many witnessed numerous 3.2 second 0 to 60 nighttime demonstrations and driver assist features. Just reported today, these new electric beasts are out on the road in southern California.
Runner ups: The Model X delays vehicle deliveries until 3rd quarter 2015 and on April 24, 2014 the company announced its 100th supercharger. Also, the cross country Tesla Motors trip was a fun 72 hours or so.

Trying out the new superchargers located at Two Brothers Brewery, located in Aurora, IL, the 2nd largest city in Illinois.

Trying out the new superchargers located at Two Brothers Brewery, located in Aurora, IL, the 2nd largest city in Illinois.

**A favorite moment for this Model S driver was the installation of superchargers (photo right) at my favorite craft brewer the Chicago area, Two Brothers Brewery in Aurora.

So what will be the big Tesla Motors moment in 2015? A Model X surprise? Maybe Tesla sells more all-electric vehicles than Nissan’s Leaf? We will see.

"Grant Gerke wears his Model S on his sleeve and has been writing about Tesla for the last five years on numerous media sites. He has a bias towards plug-in vehicles and also writes about manufacturing software for Automation World magazine in Chicago. Find him at Teslarati

Advertisement
Comments

Elon Musk

Elon Musk drops a surprise update on Boring Company’s next big dig

Musk says Boring Company could shrink the Austin to San Antonio drive to just minutes.

Published

on

By

Elon Musk says The Boring Company is working on what he called “a simple, precursor Hyperloop” tunnel connecting Austin and San Antonio, targeting speeds above 200 mph and cutting a drive that can take up to two and a half hours down to a consistent under 30 minutes. Musk posted the idea on X Sunday, in a reply to a repost of an AI generated video imagining a science fiction future with human colonies on other worlds, which he shared with the line “This is the future we shall bring into being.”


The Boring Company’s own account picked up the idea in the same thread, adding a detail about how the trip would actually work: “Because Loop/Hyperloop is express (i.e. no intermediate stops), one could travel from an Austin parking lot to a favorite San Antonio restaurant in about 30 minutes. As long as they both have Loop stations.” That framing ties the proposed intercity link to the same station model the company already runs in Las Vegas, where riders enter the tunnel network through small, garage style stops rather than one central terminal.

This is not the company’s first run at the Austin to San Antonio corridor. Boring Company floated tunnels between the two cities as far back as 2021, and later competed for a separate San Antonio Loop project tied to the airport before that specific bid stalled. Pitches for tunnels in Chicago, Los Angeles, and a New York to Washington corridor have followed a similar pattern of big announcement without a shovel in the ground.

What is different this time is the balance sheet, especially since The Boring Company closed a 3 billion dollar funding round led by investors in the United Arab Emirates earlier this month at a valuation near 23 billion dollars, giving the tunneling company more capital to chase speculative projects than it had during its earlier Texas pitches. The company is also mid-build on two other intercity systems it has actually broken ground on, inc;luding a Nashville tunnel linking downtown to the airport, where a second boring machine finished commissioning in June, and its Las Vegas network, where the station count keeps climbing on paper faster than tunnels get dug.

That gap between announcement and execution is the reason to treat Sunday’s post as an opening bid rather than a project. A tunnel spanning roughly 80 miles between two metro areas, running at speeds Boring Company has not demonstrated over any real distance, would dwarf anything the company has built. For now, the Austin to San Antonio Hyperloop exists as a caption under an AI generated space video.

Advertisement
-
Continue Reading

Elon Musk

Tesla eyes supply partners for Optimus mass production

Tesla certified three Chinese suppliers for Optimus mass production, signaling its robot timeline is accelerating.

Published

on

By

Concept rendering of Tesla Optimus in mass production

Tesla’s robotics team traveled to Ningbo, in China’s Zhejiang province, on September 16 and spent the following day auditing component suppliers for Optimus, according to a Bloomberg report cited by RobotAIGeek. The visit moved three manufacturers from provisional status to certified mass production partners: Tuopu Group, which handles actuators and chassis components, Ningbo Joyson Electronic, a sensor supplier, and Zhejiang Sanhua Intelligent Controls, which builds thermal management systems. All three already supply parts to Tesla’s electric vehicles, and the audit reportedly came with fresh orders that supply chain reports put at an initial batch of roughly 5,000 units.

Tuopu, Joyson, and Sanhua built their manufacturing base serving the automotive industry, where tolerances and volume requirements are already close to what a mass produced humanoid robot demands. Sanhua in particular has history here. Teslarati reported last October that the company had received a roughly $685 million order for linear actuators tied to Optimus, a volume industry watchers estimated could cover around 180,000 robots once production ramped.

Supply chain reports tied to this week’s audit put Tesla’s near term production goal at about 1,000 Optimus units a week by late September, rising to 2,000 to 2,500 units a week by the end of the year. That pace would put real weight behind the timeline Tesla has been building toward since May, when it wound down Model S and Model X production at Fremont to convert that floor space into a dedicated Optimus line targeting one million units annually. JPMorgan analysts who toured the factory in August confirmed the conversion took roughly four months, a pace Musk has called unprecedented for a facility that size.

New drone video shows Tesla’s Optimus Factory reaching a turning point

Fremont is only the first phase. A second, larger Optimus plant is rising at Gigafactory Texas, where drone footage shared by Joe Tegtmeyer last week showed the structural steel nearing completion on the north end of the building. Tesla has said that facility is meant to eventually support production of up to 10 million units a year, though volume output there is not expected before 2027.

Commercial sales of Optimus are still targeted for the second half of 2027, but production is expected to start well before then. JPMorgan analyst Rajat Gupta has said Tesla’s “Optimus Academy” program, which uses early units to collect real world training data inside Tesla’s own facilities, is expected to be running later this year. Bloomberg Intelligence analyst Ian Ma described the Ningbo audits as “a positive commercialization signal for China’s humanoid supply chain,” noting that sentiment could improve further if the visit leads to confirmed supplier nominations and larger orders. The Solactive China Humanoid Robotics Index rose about 1.4% on the news, though it remains down roughly 30% for the year.

Advertisement
-
Continue Reading

Elon Musk

Tesla primes Cybercabs for 4K streaming and high bandwidth gaming with Starlink integration

Tesla is now shipping Cybercabs from Giga Texas with Starlink hardware built in as standard.

Published

on

By

tesla cybercab with no manual controls showing a movie with two employees inside

Tesla’s Cybercabs are now leaving Gigafactory Texas with Starlink hardware on the rear hatch in significant numbers, according to drone footage captured Tuesday by longtime Austin drone observer Joe Tegtmeyer. Production at the factory ramped back up after the Labor Day weekend, and his flyover of the outbound lot showed rows of gold Cybercabs alongside Model Y Long Wheelbase units, many carrying the satellite module for the first time as standard equipment rather than a one off retrofit.

Tesla first showed Starlink built into an actual Cybercab on August 10, when the Robotaxi account posted images of a single gold unit with the antenna integrated into the roofline above the taillights and called it the first Cybercab with Starlink integration. That followed a July reveal where Tesla and Starlink jointly posted a cutaway diagram of the antenna placement without a working vehicle to back it up. Ashok Elluswamy, Tesla’s VP of AI software, said at the time that the connection isn’t required for the car to drive itself. It exists mainly for navigation, customer service and keeping tabs on the fleet.

Musk has made a different case in public. During Tesla’s Q2 earnings call, he said the company can’t afford robotaxis stranded in what he called “Bermuda Triangles of lack of cellular connectivity,” and he separately claimed on X that Starlink will eventually reach every Tesla built, calling it the only way to deliver high bandwidth to billions of vehicles. He has also pitched the antenna as an entertainment upgrade, telling riders they would be able to stream 4K video or play games during a trip.

Advertisement
-

The rollout has moved fast since. Robotaxi service opened to the public in Austin on September 3, and Cybercabs had already been spotted with Starlink hardware in Houston and near Miami International Airport in the weeks before Tuesday’s factory footage showed the module shipping at volume rather than on scattered test units. Whether the satellite link earns its keep is still an open question. Tesla’s unsupervised service currently runs in dense metro geofences in Texas and Florida, markets where cellular coverage is already strong, which is not where the rural dead zones Musk describes tend to show up.

Continue Reading