Connect with us

News

Tesla Giga Berlin event details expansion plans ahead of community vote

Credit: Tobias Lindh | X

Published

on

Tesla held an informational event at its Gigafactory Berlin-Brandenburg on Sunday, detailing its expansion plans ahead of a community vote on the proposed project.

The event was put on by Tesla in the plant in the lobby of the plant, located in Grünheide, Germany, and the automaker included graphics and additional details on its expansion proposal for a rail yard and logistics project, as shared on X by Tobias Lindh on Sunday. The event was open to the local community, and it comes ahead of a month-long period beginning next week, in which citizens will be able to vote on the project.

The post included the images Tesla had on display for the event, featuring the automaker’s plans for an in-house freight station with a siding shift to the railway, as well as additional storage to keep a larger bank of materials on site, and other social and employee facilities including training rooms, a competence center for trainees, and a childcare area.

Lindh clarified that this event was held not for the site’s Phase 2 construction plans, but that this event was regarding expansion to the east of the factory, specifically. This part of the expansion, as Tesla explains in one sign, will not be adding any production facilities and, thus, will not increase water consumption—a primary concern for many in the region.

According to one sign at the event, Tesla is holding citizens’ consultation hours every Thursday from 3:30 p.m. to 5:30 p.m. in the Giga Berlin lobby, and voting will take place over a month-long period, beginning next week.

In response to another user in the thread asking what the general sentiment was like at the event, Lindh said he thought the information and the event itself were beneficial, despite some vocal opposition to Tesla.

Advertisement

“As far as I can tell, most people are positive about Tesla,” Lindh wrote on X. “There is just a small loud group against Tesla. But it’s important that they are all voting, and not just the loud small group. I think that the information event today also has a very positive impact.”

You can see several of Lindh’s photos from the many signs at the event below, as translated from German to English.

Credit: Tobias Lindh | X

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Credit: Tobias Lindh | X

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Credit: Tesla (via Tobias Lindh | X)

Tesla has been working toward expanding Giga Berlin for several months, waiting throughout much of last year to gain approval for the proposals. After being approved in July, the company’s plans were rejected by the Strausberg-Erkner Water Association (WSE) for its overall Phase 2 plans due to water scarcity, although Tesla has said it can perform the expansions without increasing water consumption.

In October, the Brandenburg State Office of the Environment called the objections to Tesla’s expansion plans a “farce,” while Minister of Agriculture Axel Vogel pointed out that Giga Berlin uses significantly less water than it’s even approved for—and far less than many other local companies.

Tesla highlights water recycling efforts at its Gigafactory Berlin

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.

Advertisement

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

News

Tesla produces 100,000th new Model Y in Giga Berlin

The milestone was announced on X.

Published

on

Credit: Tesla Manufacturing/X

Tesla has produced its 100,000th new Model Y at Gigafactory Berlin. The milestone was announced by the electric vehicle maker through its official Tesla Manufacturing account on social media platform X. 

New Tesla Model Y milestone

The milestone was announced by Tesla on X, when the company wrote “Today, we built the 100,000th New Model Y at Giga Berlin!” The announcement was accompanied by an image of a new Model Y coming off the line.

The milestone was received warmly by members of the Tesla community, many of whom expressed excitement at the further progress of the new Model Y program at Giga Berlin. The facility, after all, only produces Model Y units, which would make it the perfect site to produce new variants like the Model Y Performance and possibly even the Model Y L, which was recently launched in China. 

New Model Y ramp

As noted in a previous report from electrive, the initial production of the new Model Y started in Giga Berlin around mid-January 2025. Since the new Model Y involved a changeover from the legacy Y to the new variant, the ramp of the new Model Y’s production at the Germany-based facility was likely a gradual process over the past months. 

It would then be no surprise if the next 100,000 new Model Y units would be produced in Giga Berlin in a shorter period. Giga Berlin could become an even bigger factor in Tesla’s global sales, after all, especially if it becomes the site that produces the Model Y Performance and the Model Y L for Europe and other territories. Giga Berlin, if any, seems to be quite busy recently, with aerial videos of the facility showing a fleet of mysteriously covered Model Y units being stored within the complex.

Advertisement
Continue Reading

News

Tesla set to win big after IRS adjusts EV tax credit rules

“For purposes of sections 25E, 30D, and 45W, a vehicle is ‘acquired’ as of the date a written binding contract is entered into and a payment has been made. A payment includes a nominal down payment or a vehicle trade-in.”

Published

on

Credit: Tesla

Tesla is set to potentially come out as a big winner as the IRS has adjusted the rules of the $7,500 EV tax credit slightly.

The $7,500 tax credit for electric vehicles is set to expire on September 30, but the IRS has made a slight adjustment to the terms of the credit that will give consumers a bit more time to buy an EV and receive the discount.

The original terms of the EV tax credit were that delivery of an EV must be completed by September 30. Even if you had made a reservation or put a down payment on an EV, if it did not arrive and take delivery by September 30, the credit would not apply to you.

Tesla is ready with a perfect counter to the end of US EV tax credits

This put some people in quite a tough situation. As wait times for some EVs, especially Tesla Model Y and Model 3 vehicles, continue to be pushed back due to an increase in demand as consumers are trying to take advantage of the credit, some car buyers ordered a car that was not the trim level, paint color, or interior color that they wanted.

However, the IRS has adjusted the terms of the tax credit to enable people to have a bit more time to get the vehicle they want.

Late last week, the agency said that the meaning of “acquired” has been changed, and now, if a consumer has entered a legally binding contract to take delivery of the vehicle, which includes a nominal down payment on the car, they can take delivery after the previous September 30 deadline and still qualify for the credit.

The IRS wrote:

“For purposes of sections 25E, 30D, and 45W, a vehicle is ‘acquired’ as of the date a written binding contract is entered into and a payment has been made. A payment includes a nominal down payment or a vehicle trade-in.”

Tesla could come out as a big winner here because of this. The company is experiencing a lot of demand for its cars because of the tax credit’s expiration, and now that the rule has been adjusted to include orders received by the 30th as long as they’re accompanied by a nominal down payment, some of these high-demand deliveries could leak into Q4.

Q3 is likely going to be a very strong quarter for Tesla, and questions remain about how the company will perform in subsequent quarters since the tax credit is going away. However, this slight adjustment is a big plus for Tesla and other EV makers.

Continue Reading

News

Tesla Semi factory receives giant production equipment

The massive machine was transported to the Semi factory using two diesel trucks and a triple trailer.

Published

on

Credit: @HinrichsZane/X

Tesla seems determined to kick off the production of the Tesla Semi sometime this year at its Nevada factory.

This was hinted at by the arrival of massive production equipment to the Semi’s manufacturing site near Giga Nevada.

New equipment

What appeared to be a massive stamping machine has been transported to the Giga Texas complex. Spotted by longtime drone operator and Tesla Semi advocate @HinrichsZane, the massive contraption is so large and heavy that a single semi truck and trailer were not enough to move it. Instead, the massive machine was shipped to the Semi factory using two diesel trucks and a triple trailer.

The machine was fully covered in the videos from Nevada, but based on its shape and size, it appears that it is a stamping press for the Class 8 all-electric truck. Tesla is a pioneer in the use of Megacasts in the automotive industry, so it makes sense for the company to use a Giga Press for the Semi’s production as well.

Ambitious goals

The Tesla Semi factory is expected to produce a whopping 50,000 units of the Class 8 all-electric truck annually when it is fully ramped. At that output, the facility would be one of the country’s highest-volume plants for semi trailers, electric or otherwise. In a video posted earlier this year, Dan Priestley, who leads the Semi program at Tesla, stated that the company is looking to achieve volume production over the coming quarters.

Advertisement

This should allow the Tesla Semi factory to mass produce the vehicle by 2026. Tesla CEO Elon Musk reiterated this timeframe recently, when he responded to a post on social media platform X about Microsoft co-founder Bill Gates being bearish about battery electric semi trucks.  “Tesla Semi will be in volume production next year,” Musk said in his post, which also included a laughing emoji. 

Check out the drone operator’s recent footage of the Tesla Semi factory in the video below.

Continue Reading

Trending