Connect with us

News

Ford’s agreement to build battery cells in Turkey has been revoked

Credit: Ford

Published

on

A joint venture featuring Ford, LG Energy Solutions and Turkey conglomerate Koç Holdings was set to build battery cells in the country’s capital city, though new reports show that the agreement has been revoked.

Earlier this year, Ford signed a memo of understanding with the other parties build a battery cell factory in Ankara, Turkey. However, Koç Holdings said on Friday that it revoked the agreement with Ford and LG, citing the “pace of electric vehicle (EV) adoption,” Automotive News Europe reports.

“Considering the current pace of electric vehicle adoption, the timing is not appropriate for a battery cell investment,” Koç Holdings said during a statement to the Public Disclosure Platform.

“Ford and Koc Holding will remain committed to support electric vehicle production at Ford Otosan’s Kocaeli plant and will evaluate potential battery cell investments in the future in line with the dynamics of the electric vehicle market,” the company added.

Advertisement

Ford to postpone ~$12 billion in EV investment

Production at the Ankara plant was initially expected to begin in 2026, as Ford wrote in a press release earlier this year. Annual production capacity was planned to start at 25 GWh, and the company said it might eventually expand that to 45 GWh.

Ford currently receives Mustang Mach-E and E-Transit batteries from LG’s Poland plant. Last month, LG warned that it expects its revenue growth to slow down in 2024 amidst continued conditions of economic uncertainty and reduced EV sales forecasts from some automakers.

“LG Energy Solution and Ford are working together on a plan to support battery cell production for this EV from LG Energy Solution’s existing operations, extending the companies’ long-standing business relationship,” LG said in a statement.

Advertisement

LG also has battery supply partnerships with other automakers, including Tesla and Toyota, and the company recently announced a shift at its factory in Arizona.

The canceled cell production plans in Turkey follow costly United Auto Workers (UAW) strikes, and after former Ford CEO and current Hertz CEO Mark Fields stated in recent weeks that he thinks the industry is facing the “tough part of mass [EV] adoption.”

It also comes after Ford struggled with batteries earlier this year. In February, Ford announced plans to halt F-150 Lightning production due to a battery issue that caused one unit to catch fire during a quality check.

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send your tips to us at tips@teslarati.com.

Advertisement

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

SpaceX to become America’s Military data backbone for missiles, drones, and warfighters

The Space Force just handed SpaceX $2.29 billion to build the military’s space internet backbone.

Published

on

By

US Golden Dome space defense system (Concept render by Grok)

The U.S. Space Force awarded SpaceX a $2.29 billion contract on May 26, 2026 to build the backbone of its Space Data Network, a satellite-based communications system designed to keep American military forces connected anywhere on Earth in real time. The contract is firm-fixed-price and requires SpaceX to deliver a fully operational prototype by the end of 2027.

In plain terms, the SDN Backbone is the plumbing behind the military’s space-based internet. It functions as a low Earth orbit satellite constellation providing robust, high-capacity, and low-latency data transport for the Joint Force, connecting sensors and weapons systems continuously, globally, and securely. Think of it as a private, hardened version of Starlink built specifically for battlefield communications, one that soldiers, ships, and aircraft can rely on even in contested environments where ground-based networks have been disrupted.

SpaceX is quietly becoming the U.S. Military’s only reliable rocket

The Space Force was direct about why SpaceX was selected. “The SDN Backbone leverages the best of commercial innovation and delivers a strong foundation for the SDN mission set — a huge benefit and enabler for our warfighters,” said USSF Col. Ryan Frazier.

Advertisement

“We aren’t trading speed for scale; we are demanding both. By using rapid prototyping and Other Transaction Authorities, we are ensuring our advanced solutions are integrated and delivered to the warfighter as fast as possible,” added USSF Lt. Col. Fry, SDN Backbone system program manager.

The SDN Backbone will work alongside the Space Development Agency’s Transport Layer, with the two systems forming a unified open architecture to provide critical data transport for current and future Department of War missions.

As Teslarati has reported, this is not SpaceX’s first Space Force contract of 2026. In April, the Space Force awarded SpaceX $178.5 million to launch missile tracking satellites, and SpaceX is already embedded in the Golden Dome missile defense software group. The $2.29 billion SDN Backbone award puts SpaceX at the center of how the American military communicates in space, a position with direct implications for its reported $1.75 trillion IPO valuation as the company heads toward a public offering as early as June 2026.

Advertisement
Continue Reading

News

Tesla’s dedicated Optimus factory construction officially underway at Giga Texas

Published

on

(Credit: Tesla)

Tesla’s dedicated factory for building up to ten million Optimus units is officially under construction at Gigafactory Texas.

Drone footage released on May 27 by Giga Texas observer Joe Tegtmeyer captures the significant milestone of the first steel structure officially standing at Tesla’s new Optimus factory on the North Campus of the facility.

Phase two of land reclamation is advancing steadily, and the progress will let the new building extend nearly the full length of the main Giga Texas factory, potentially exceeding 4,000 feet, while measuring somewhere between 50 and 70 meters narrower. Extensive foundation work is proceeding as well.

This facility forms a central element of Tesla’s broader North Campus expansion at Giga Texas. The project will add more than 5.2 million square feet of new industrial space. It sits alongside other advanced developments, including a Terafab for next-gen AI chips. The scale reflects Tesla’s commitment to transforming humanoid robotics into a core pillar of the company’s future.

Musk has said that Optimus will be the biggest product in the world on several occasions. He believes it will be Tesla’s biggest valuation contributor.

Advertisement

Tesla prepares to expand Giga Texas with new Optimus production plant

Tesla plans to build about 10 million robots at the site annually once it is completed, which would be about 27,000 units each day.

The Optimus plant at Giga Texas is part of Tesla’s phased strategy for Optimus manufacturing. In an effort to start production of the robot well before the Giga Texas plant is complete, Tesla ended production of the Model S and Model X vehicles, which were built in Fremont, California, to make way for initial Optimus manufacturing efforts.

Production there will start in either July or August of this year, and early units will support internal factory tasks while the team gathers real-world data to refine processes. The Gigafactory Texas facility will house a second-gen production line. It targets high-volume output starting in Summer 2027.

Advertisement

Musk has repeatedly described Optimus as potentially more valuable than Tesla’s entire vehicle business. Current versions are already completing minor tasks around various facilities, while Tesla continues to refine its abilities and add new features.

Tesla’s total investment could reach several billion dollars. Significant challenges lie ahead, including the creation of an entirely new manufacturing ecosystem, the refinement of AI systems for dependable autonomy, and the development of reliable supply chains for actuators, sensors, and other components.

Nevertheless, the visible progress at Giga Texas highlights Tesla’s capacity to translate ambitious concepts into physical reality.

Tesla’s Optimus factory stands as much more than a simple expansion project, as it is quite literally the second phase of what could potentially be the biggest product ever. With construction beginning, 2027 is poised to become a transformative year for Tesla, as it evolves even further from an electric vehicle leader into a pioneer of intelligent, general-purpose machines.

Advertisement
Continue Reading

News

Tesla teases going Plaid Mode with the Model 3

Published

on

Credit: Tesla

Tesla Vice President of Vehicle Engineering, Lars Moravy, recently revealed the company has thought about introducing a Plaid powertrain on the Model 3, but there could be some challenges involved.

On the Ride the Lightning podcast, Moravy revealed that he thinks about a Plaid Model 3 “all the time,” and it certainly has a place in Tesla’s potential lineup of future vehicles.

Now that the Plaid powertrain is technically defunct due to the newfound absence of the Model S and Model X, Tesla could find a way to reintroduce the lightning-quick trim level to its mass-market vehicles.

But there are going to be some challenges with it. Moravy said that the Model 3 Plaid would likely adopt the carbon-sleeved motors that the Model S Plaid had. However, packaging would be a major challenge, as Moravy said on the podcast, it would be a “tight engineering squeeze.”

Advertisement

It’s important to note that there are no active production plans for the Model 3 Plaid at this point, but it’s also worth noting that with the Model S and Model X Plaid no longer available, Tesla would likely be willing to introduce something that is even more white-knuckle than the Model 3 Performance, which already boasts a 2.9-second 0-60 MPH acceleration rate and a top speed of 163 MPH.

Of course, there is the Roadster, but we don’t know when that will exactly make it to market, and we know that, for sure, it will not be accessible to many.

Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline

Tesla has prided itself in building some of the best cars out there, but they’re also interested in building cars that are simply fun to be in.

Advertisement

A Plaid Model 3 could truly push the limits and could end up being one of the best cars Tesla will ever build, especially if it can shave off at least half of a second from its 0-60 MPH time and increase its top speed slightly.

More than anything, the real changes will be in the ride and aerodynamics. Tesla improving things like the suspension, handling, and downforce will be the true trademarks of its Plaid powertrain; putting it in the Model 3 could be a great move for the company and for customers interested in high-end performance.

Continue Reading