Connect with us

News

Tesla to open NV battery plant for Megapacks using CATL equipment: report

Credit: Tesla

Published

on

Tesla is reportedly poised to expand its battery production activities in Nevada. To accomplish this, the electric vehicle maker will reportedly launch a new battery manufacturing plant that uses idle equipment from one of its battery suppliers, Contemporary Amperex Technology Co. Ltd. (CATL). 

Citing individuals reportedly familiar with the matter, Bloomberg News noted that Tesla is looking to establish the facility in Sparks, Nevada. Tesla’s Giga Nevada facility, which is jointly operated with Japanese battery maker Panasonic, and which produces 2170 cells, is also located in the area. 

As per the publication’s sources, Tesla will have complete control and ownership of the upcoming battery facility. The EV maker will reportedly also handle the full cost of the plant, with CATL only being involved the facility’s equipment setup. Interestingly enough, the upcoming battery facility will reportedly not produce cells for Tesla’s electric vehicles. 

Instead, Bloomberg‘s sources claimed that the upcoming plant would produce battery cells for the Tesla Megapack, the electric vehicle maker’s grid-scale energy storage system. The facility is reportedly part of the company’s efforts to bring LFP (lithium-iron-phosphate) battery production into the United States

The Tesla Megapack already uses CATL cells, and Tesla is reportedly planning to produce the same types of batteries in its upcoming Nevada plant. Considering that the new facility will not be producing new types of cells, there seems to be a fairly good chance that the upcoming plant will be able to ramp its production in a relatively quick manner. 

As highlighted by CEO Elon Musk during the Q4 and FY 2023 earnings call, Tesla is not competing with its suppliers when it comes to battery production. Instead, the EV maker is “very appreciative of our suppliers,” one of which is CATL.

Tesla’s upcoming Nevada battery facility will reportedly have an output of about 10 GWh, though this could increase if the initiative proves successful and if the company is successful in establishing a supply chain. Estimates reportedly indicate that the facility won’t be able to start its operations until next year, 2025. 

Advertisement
-
-

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Musk’s massive Terafab project will get final location soon

Published

on

Credit: SpaceX

Elon Musk’s massive Terafab project, which will be the first true conglomeration between each of his major entities, is set to get its final location soon, the CEO said on Tesla’s recent earnings call.

“The Terafab, we expect to announce a location soon, and provide more details about our plans in that regard. We’ll leave that to the product, the launch announcement rather than try to squeeze it into an earnings call,” Musk said last Wednesday.

Tesla Terafab set for launch: Inside the $20B AI chip factory that will reshape the auto industry

Terafab was announced by Musk back in March and was essentially a massive, vertically integrated semiconductor manufacturing project that would provide all the chips the three companies needed for their AI initiatives without needing third-party companies.

The plant will produce over 1 terawatt of AI compute each year, and will help back up projects like Optimus, Full Self-Driving, and other AI-based projects that Musk’s companies are working on.

In April, less than a month after the project was launched, Intel announced it would join the project, contributing manufacturing expertise and consulting to Terafab as a whole. Intel is one of three chip manufacturers that produce sub-5 nanometer chips at scale. TSMC and Samsung are the other two.

However, there was no true indication of where Terafab would end up, but most believe it will likely be somewhere in Texas. Business Insider has reported that SpaceX plans to build out Terafab in Grimes County, Texas, but this is unconfirmed.

Musk confirmed recently that it would not be on Giga Texas property, as it is simply too large.

Terafab holds much of Musk’s grand ambitions for the future within its construct. It holds so much responsibility for the future and the biggest projects that Musk’s companies can imagine.

“I think this is a very big announcement and it deserves to have its own day in the spotlight and not be squeezed into an earnings call,” he said. “I do think Terafab is going to be an amazing initiative and a necessary one, and one without which we will be constrained in our ability to scale Optimus production, because we simply won’t have enough AI chips.”

He continued by stating that Terafab is necessary for scaling Optimus, which Musk said could be the biggest product of any kind of all time. “It’s crucial to solve that, and we’ll have to solve memory, logic, and packaging in order to scale Optimus.”

Continue Reading

News

Elon Musk reveals SpaceX performed secret Starship test on Flight 13

Published

on

Credit: SpaceX

SpaceX performed a secret test on a specific portion of Starship with its recent 13th test flight last week, CEO Elon Musk revealed.

Starship’s 13th test flight took place last Friday, and in many aspects, it was one of the most overwhelmingly successful launches in the project’s history.

All of the mission objectives were met without incident, both the Super Heavy Booster and Ship managed to perform safe splashdowns in the Gulf of America and the Indian Ocean, respectively, and the deployment of Starlink satellites came and went without any complications.

However, there was more on the agenda for SpaceX with Flight 13. Musk revealed an internal test of the ship’s heat shield tiles, as the space exploration company wanted to push them to the limits after previous issues.

Many noticed that Starship’s initial launch seemed to be more accelerated than normal, and that was not a mistake. Musk revealed that SpaceX decided to give Flight 13 an intentionally aggressive acceleration rate in an effort to test how well the tiles would remain attached to the ship:

SpaceX had issues with some of the heat shield tiles remaining attached early on in the Starship program. The first six test flights presented some kind of anomaly with them, so the company’s big focus with them was to figure out a way to keep them intact through the duration of the flight.

Things truly improved as Flight 10 showed that ceramic tiles generally stayed attached to the ship far better due to refined attachment, as SpaceX utilized pins instead of adhesives. Flights 10 through 13 truly showed some clear progress with the heat shield tiles, and this latest test seems to be where some real progress was noticed, especially by Musk.

The 13th Starship launch last Friday was the second with Starship V3, SpaceX’s latest and greatest iteration of the spacecraft. Goals and ambitions are getting even grander as the project continues to progress. Musk has already hinted that SpaceX will likely try to catch Starship with Flight 14.

Continue Reading

Elon Musk

Tesla FSD takes owner on a 20,000+ mile joy ride

Tesla owner David Moss just pushed his intervention free FSD streak past 20,000 miles total.

Published

on

By

Tesla FSD 14.3 [Credit: TESLARATI)

Tesla Model 3 owner David Moss has spent the better part of eight months turning his vehicle into a rolling stress test for Full Self-Driving, and this week he pushed his single, continuous FSD streak past 20,000 miles without a human intervening.

Moss, a Tacoma, Washington resident who sells LiDAR scanning equipment for a living, first drew wide attention in December 2025 when he logged 10,000 consecutive miles on FSD v14.2. Days later he drove from the Tesla Diner in Los Angeles to Myrtle Beach, South Carolina, covering 2,732 miles in two days and 20 hours with zero disengagements, the first verified coast to coast autonomous drive in Tesla’s history. Tesla even featured the trip as an official customer story in March. That original streak eventually reached 12,961 miles across 30 states before ending in rural Wisconsin in January, when snow and single digit temperatures forced Moss to take over.

Tesla FSD successfully completes full coast-to-coast drive with zero interventions

He started over, and this run has gone further. In late May, Moss drove 3,760 miles across Canada with two companions, from Horseshoe Bay in Vancouver to a Tesla showroom in Halifax, again without a single intervention, a trip Tesla AI software VP Ashok Elluswamy publicly congratulated him for on X. In June, he pushed the same unbroken streak south, aiming to link the Canadian border to the Mexican border, and crossed 10,000 miles on Tesla’s newly added in car streak counter along the way, the first driver to do so since Tesla began showing confetti animations for the feature.


It’s worth noting that every mile is logged through the FSD Database, a community run tracker built by Tesla influencer Omar Qazi, well known as @WholeMars on X, that pulls telemetry straight from the car and records disengagements down to a tenth of a mile. That verification is what separates Moss’s numbers from casual claims on social media.

The streak itself is a fairly recent addition to Tesla’s software. FSD v14.2 introduced a Self Driving Stats panel tracking the ratio of autonomous to manual miles, and v14.3.4 added the live streak counter in June, which resets the moment a driver brakes, wrenches the wheel or cancels navigation. Reaching 20,000 miles on that counter means a single Tesla drove itself through countless highways, city grids, construction zones and Supercharger stalls without a single reset.

Moss has said the goal was never to set a record for its own sake, but to show, mile by verified mile, what the software can already do.

Continue Reading