Connect with us

News

Tesla installs some charging posts, lays concrete at Hollywood diner

Credit: 247Tesla | YouTube

Published

on

Tesla’s upcoming drive-in, diner, and Supercharger site in Hollywood is coming together quite nicely, with the latest footage showing that crews have poured concrete across much of the customer parking lot, started installing the actual posts for initial Superchargers, and more.

In drone footage shared by 247Tesla on Tuesday, we can see that the crews have poured concrete across around half of the overall customer parking lot area, and some of the V4 Supercharger hardware we saw going in last week now feature the actual charging posts. The video’s host also points out that the wall on the west side of the lot, which previously included a bunch of graffiti, has now been covered up with solid gray paint.

The site also shows several cars in the attached parking lot, though not many workers can be seen working on the exterior, suggesting that there may be a lot going into the interior space at this time. Workers have also closed off one lane on Santa Monica Boulevard, as crews work to update the road’s sightline by replacing the wooden telephone poles.

You can check out the full Tuesday update from 247Tesla below.

https://www.youtube.com/watch?v=tSGgFj3-DJ8

Advertisement

RELATED: Tesla Diner and Drive-in closes in on construction, receives wave of permit updates

The upcoming Tesla diner, located at 7001 Santa Monica Blvd., has been under construction for the past year. It’s set to be home to a unique 1950s-style diner, as well as a drive-in movie theater that will play highlight reels of some of the best movie moments in history, according to initial musings about the project from Elon Musk.

Interestingly, while the diner and Supercharger site likely won’t be completed for another couple of months, some have spotted Tesla seemingly testing Full Self-Driving (FSD) around the diner and other California locations ahead of the company’s Thursday robotaxi unveiling event. One apparent prototype was also seen testing outside of the Warner Brothers studio in Burbank at which the event will be hosted.

Advertisement

In any case, Tesla has also begun hiring for its Supercharger, diner and drive-in, and it posted a job listing for a “Tesla Diner Experience Specialist” in August that remains up on its careers page today. It’s unclear at this time when Tesla plans to open the unique diner location, though if construction progress and hiring are any indication (they are), we’ll likely get some news on this in the coming months.

Tesla’s LA diner building gets steel Cybertruck-inspired siding

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

SpaceX Starship just nailed something it’s never done before

SpaceX’s Starship flew successfully Friday, landing both stages and deploying its first Starlink V3 satellites.

Published

on

By

Starship’s thirteenth test flight delivered exactly what SpaceX needed with a clean liftoff, two successful stage recoveries, and the first real payload the vehicle has ever carried to space. Booster 20 and Ship 40 lifted off at 5:51 p.m. CT from Starbase, and by the time the mission wrapped roughly an hour later, both halves of the rocket had done exactly what they were supposed to do.

Booster 20 separated from Ship 40 a few minutes into the flight and stuck a controlled splashdown in the Gulf of Mexico about six minutes after liftoff. That is a meaningful turnaround from Flight 12 in May, when the booster lost several engines during its boostback burn before a hard water landing attempt.


Starship 40’s performance was arguably the bigger win. The vehicle deployed the first 20 operational Starlink V3 satellites Starship has ever carried, then flew a suborbital arc to a landing in the Indian Ocean that SpaceX commentator Dan Huot called the company’s softest splashdown yet. “This is a dream scenario for this team that’s trying to get this heat shield data,” Huot said on the live broadcast, according to Space.com’s live coverage. “I’m a little over the moon right now. Wow. Lucky number 13.”

Unlike the mass simulators SpaceX flew on Flight 12, these were production Starlink V3 satellites, meant to extend solar arrays and antennas and attempt to link with the broader constellation before reentering minutes later. Getting real hardware through a full deploy sequence on only the second flight of the V3 generation keeps Starship on schedule for the payload work NASA is counting on for future Artemis lunar landings.

Advertisement

— TESLARATI (@Teslarati) July 25, 2026

The flight also arrives at a moment when SpaceX needed a win. SPCX has traded below its $135 IPO price since mid-July, as Teslarati reported when the mission slipped to Friday, and short interest has climbed to roughly a third of the tradable float. A clean flight will not fix a balance sheet, but it does answer the one question SpaceX absolutely needed answered this week: whether the fixes made after the July 16 abort would hold up under real flight conditions. They did, on both stages, on the first try after the redesign.

SpaceX has not set a target date for Flight 14, though the company has said it wants to push toward an orbital attempt on the next mission. After Friday, that goal looks a lot more within reach.

Advertisement
Continue Reading

News

Tesla’s Supercharger Diner probably just secured more locations

Published

on

tesla diner
Credit: Tesla

Tesla’s Supercharger Diner in Los Angeles dominated the company’s global usage rankings after just one year, proving the concept is more than just a one-off novelty location that will fade away.

The performance could incite the company to build more locations, something that CEO Elon Musk has hinted at for some time.

Tesla’s Supercharger Diner delivered 21.2 GWh of energy in its first year of operation, the company’s head of Charging, Max de Zegher, revealed on X. Of the top 10 most utilized Supercharger locations in Tesla’s global infrastructure, the Diner in Los Angeles was the most used by drivers, and it wasn’t particularly close:

On its launch day one year ago, nobody was too sure what the Tesla Diner would be about. It seemed like an interesting concept, and considering it had been in the works for years, it was a highly anticipated launch that many were looking forward to.

Based on its success, we could see additional Diners with Superchargers built throughout the United States, and potentially beyond. Musk has said on several occasions that the company would be willing to bring the Diner idea to more markets.

Tesla makes major change at Supercharger Diner amid epic demand

Advertisement

Of the markets that Musk has mentioned, both Palo Alto and Austin have come to be perceived as ideal selections. However, there are no concrete plans as of now to build new Supercharger Diners anywhere; the location on Santa Monica Boulevard will remain the exclusive spot to pick up Tesla-inspired eats, at least for the time being.

Continue Reading

Investor's Corner

Tesla short sellers win big after shares fall after earnings

Published

on

A red Tesla Roadster driving around a turn
(Credit: Tesla)

Tesla short sellers won big following the company’s massive fall on Wall Street after it reported subpar Earnings on Wednesday.

Tesla short sellers collected about $4.12 billion in single-day profits on Thursday, according to BloombergShares fell as much as 15 percent during Thursday’s session. It closed as one of the worst days for Tesla on Wall Street in the past three years.

Investors sold off the stock after Tesla said it would aggressively direct its spending toward AI and its Optimus robot project. The company had record revenues, which were driven by one of the strongest quarters in terms of vehicle deliveries in company history.

Advertisement

However, it missed EPS estimates by reporting just $0.33, a far cry from the $0.53 analysts expected.

S3 Partners reported that about 3 percent of Tesla’s outstanding stock is sold short. Managing Director at S3, Ihor Dusaniwsky, provided the short seller’s potential profit, as well as another figure: shorts have likely had paper gains of $8.92 billion this year, as Tesla shares are down 30 percent in 2026.

Tesla (TSLA) Q2 2026 earnings results: miss on EPS, beat on revenue

Tesla has burned short sellers many times in the past, but the company’s latest Earnings Call was a chance for those skeptics to taste some payback. Although the company gave some very transparent information regarding future projects, the rollout of Robotaxi, Optimus, and Semi, many investors took their profits on Thursday.

Notable short sellers like Michael Burry have been transparent about their skepticism around Tesla shares. Burry just revealed three weeks ago that he had opened up a new short on the stock, stating he shorted Tesla shares at $416.22. “Happy it jumped back to this level,” he said in a blog post.

Advertisement

At the time of publication, Tesla shares were down about 3 percent and the stock was trading at $309.92.

Continue Reading