News
Tesla Cybertruck reaches new peak charging speed with NxuOne
Tesla Cybertruck reached a new peak charging speed with a third-party charger from Nxu, a tech company that specializes in innovative EV charging and energy storage solutions.
Nxu’s NxuOne Charging Station helped the Cybertruck reach a new peak charging rate of 327kW, beating the previous record of 253kW.
The test was validated with several Cybertruck units and a NxuOne Charging Station earlier this week. The Cybertruck, with its revolutionary 800-volt architecture that enables faster charging speeds, peaked at 327.67 kW, 814 volts, and a peak current of 462 amps.

Charging speed is incredibly important due to the fact that it is still a major argument against owning an EV. Although it is widely blown out of proportion due to the fact that many EV owners charge at home, stops at Superchargers and other EV charging stations can be longer than trips to a gas station for ICE drivers, although trip planning has widely challenged that logic.
Nevertheless, EV companies are still gearing up for the capability to charge their vehicles faster, and one of the ways they are doing this is through the development of the 800-volt architecture.
Tesla is not the first company to utilize this strategy, but because it operates such a robust network of EV chargers across the globe and will adopt the high-speed capable architecture with the rollout of the V4 Superchargers.

“The Nxu team has worked incredibly hard to validate the charging power of our NxuOne Charging System in real-world scenarios,” Nxu Founder, Chairman, and CEO Mark Hanchett said. “We believe we’ve created one of the fastest charging units available today, and now we have the data to substantiate those claims. Our aim is to enhance the EV charging ecosystem by providing reliable and fast charging solutions for every make, model, or size of EV. The Cybertruck charging sessions are a huge step towards realizing that goal.”
Tesla confirmed in October 2023 that the Cybertruck would equip the 800-volt architecture, noting that the strategy would help bring “notable cost savings” as well as performance improvements. Vehicles with an 800-volt architecture are void of as much copper, which helps reduce weight.
Nxu was also the first third-party company to perform a successful NACS charging session on a Cybertruck without a Tesla Supercharger station in late February.
I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.
Elon Musk
Tesla and SpaceX merger talks hit a new stage, and one hurdle remains
Tesla and SpaceX merger talks are reportedly advancing, and a deal could arrive by December.
Tesla and SpaceX are moving closer to a combination, with a deal announcement possible as soon as December, Bloomberg reported on Thursday, citing people familiar with the matter. The companies have also discussed a scenario in which the announcement slips into early 2027.
Boards and advisers on both sides are now working through the terms of the deal and the governance structure of the combined company, according to the report. One open item is how many SpaceX shares Tesla investors would receive. Bloomberg had previously reported that the two companies were aiming to announce a deal in the first half of next year and close it before the end of President Donald Trump’s term, so a December announcement would pull that schedule forward by months.
Tesla shares rose as much as 1.9% to $398.35 after the report, while SpaceX gained 0.6% to $140.63. SpaceX carries a market value of about $1.9 trillion following its June IPO, and Tesla is valued at about $1.55 trillion, which would make a combination the largest corporate deal on record. Neither company responded to requests for comment.
The talks became official on October 20, when Elon Musk said on SpaceX’s third quarter earnings call that both companies had formed special committees of independent directors to study a merger, as Teslarati reported. Musk said he could not take part because he is “a conflicted party” and called the process “an odd kabuki dance.” He also noted that Tesla would need approval from 50 percent of all outstanding shares, a bar the company missed in 2025 when a board declassification proposal won support from only 39.4 percent.
China remains the biggest structural problem. Bloomberg’s sources said the companies still need to work out how to isolate Tesla’s large and profitable manufacturing business in China from SpaceX’s U.S. government and defense contracts. JPMorgan analyst Rajat Gupta described those two factors last month as “key dynamics that are at odds with each other” for regulatory and shareholder approval. Musk has repeatedly said Tesla has no plans to separate its China business, a position he restated in August after ARK Invest predicted a merger announcement before the end of the year.
Washington adds another layer. Democrats took control of Congress in this month’s midterms and have pledged to investigate Musk’s business and political activities, which could bring added scrutiny to a deal involving one of the Pentagon’s most important launch and satellite contractors.
The report also lands three weeks before Tesla’s December 3 annual meeting at Giga Texas. That ballot has only three items, led by the re-election of Musk, board chair Robyn Denholm and JB Straubel, and includes no merger proposal. Any deal announced in December would likely require a separate special meeting for Tesla shareholders to vote on it.
The two companies already share a growing list of projects, including the Terafab semiconductor plant in Texas. Tesla’s next generation Roadster, which uses cold gas thrusters built on SpaceX hardware, turned up on display at SpaceX headquarters last month and has become one of the clearest public examples of that overlap.
News
SpaceX hid behind another name in the Arizona desert, and now it’s going big
SpaceX puts a $50 billion price on its Arizona supercompute campus ahead of December’s hearing.
SpaceX has put a price tag on the supercomputer campus it wants to build in the southern Arizona desert. In a statement Thursday, the company said it is pursuing a roughly $50 billion supercompute campus in Cochise County, about 80 miles east of Tucson. Together with a separate facility planned at Starbase, Texas, the two projects add up to more than $74 billion in planned investment.
The Arizona figure had not been disclosed before. SpaceX’s involvement only became public on November 4, when company representatives hosted a packed town hall at Cochise Elementary School for an application filed under the name Tombstone Resources LLC. A SpaceX representative told residents the filing used another name because putting SpaceX on it “draws attention” from outside the county, local station KVOA reported.
The application describes a 747-acre site near the Willcox Playa with up to nine buildings of about 493,000 square feet each. SpaceX plans to bring the campus online in four phases of roughly 1.5 GW, reaching 6 GW at full build, backed by a 24 GWh battery system and about $3.6 billion in grid upgrades. At that size, it would draw about 2.5 times more power than every data center in Maricopa County combined, according to an Arizona Republic analysis.
SpaceX says the project will create about 5,500 construction jobs and 1,000 permanent jobs, and that it could cut electricity bills for members of the local cooperatives by up to 20 percent. The campus would use dry cooling with no industrial groundwater use. Its application estimates ongoing water needs of 7 to 10 acre-feet a year, roughly what 20 to 30 homes consume.
Power is the bigger question. The site sits next to the Apache Generating Station, a coal and natural gas plant with about 1 GW of capacity that had been slated to retire by 2028. SpaceX told residents its investment could expand the station to more than 6 GW.
Local opposition is organized. A petition asking the county to deny the permit has gathered about 2,400 signatures, and the nearby playa is a landing spot for federally protected sandhill cranes, which SpaceX says its design accounts for. The Cochise County Planning and Zoning Commission will hold a public hearing on December 9 in Bisbee, with written comments due November 27. If approved, construction could start in March 2027.
The Texas project faces a vote the same day. The Starbase City Commission will consider a property tax abatement for SpaceX’s $24 billion gas plant and supercompute facility at its own December 9 hearing, as Teslarati reported. SpaceX said Thursday the Starbase site has already generated more than 3,000 construction jobs, and it committed $220 million to Brownsville’s water and wastewater systems, $40 million of which has been paid.
Both campuses would expand a footprint still centered on the Memphis area, where SpaceX’s Colossus data centers run largely on gas turbines and the company won a permit for a power plant in Southaven, Mississippi earlier this year. SpaceX ended the third quarter with 1.7 GW of nameplate compute. The Arizona campus alone, at full build, would be more than three times that size.
Elon Musk
Nvidia’s board meets on Jensen Huang, and Elon Musk already has an answer
Elon Musk says it would be an honor to hire Jensen Huang amid Nvidia turmoil.
Elon Musk says he would welcome Jensen Huang at one of his companies if Nvidia’s board decides to push out its longtime chief executive.
On Wednesday evening, the financial account ZeroHedge posted “Elon please hire Jensen” on X. Musk replied roughly two hours later: “That would be an honor.” Neither Huang nor Nvidia had responded publicly as of Wednesday night.
Musk’s reply came as Nvidia’s board met to decide Huang’s future. The Wall Street Journal reported that directors were preparing to oust him following reports of two extramarital relationships. One involves Alice Huang, a Singapore-based businesswoman whom U.S. intelligence officials reportedly believe was working for China’s Ministry of State Security. The New York Times separately reported a relationship with Kimberly Powell, Nvidia’s vice president of health care. Huang acknowledged being unfaithful in a memo to employees on Sunday but gave no details.
@zerohedge That would be an honor
— Elon Musk (@elonmusk) November 12, 2026
Under Nvidia’s bylaws, a majority of its 11 directors can remove the CEO with or without cause. Bloomberg reported that the board has been working with an outside firm on possible replacements and may name an interim chief, with CFO Colette Kress seen as the likely pick. Nvidia shares fell more than 8 percent in extended trading, according to CNBC, and the company is scheduled to report quarterly earnings on November 17.
Musk has more riding on Nvidia’s leadership than most tech executives. In August, he told investors on SpaceX’s first earnings call as a public company that it would build its AI infrastructure exclusively on Nvidia hardware, calling Vera Rubin “the best architecture.” SpaceX is also working with Nvidia on the compute payload for Starmind, its planned orbital AI constellation. In October, SpaceX said it had a binding commitment for a roughly $40 billion lease of Vera Rubin GPUs and related equipment, with the leases expected to begin in the first half of 2027.
The scale of that dependence is already enormous. On its Q3 call, SpaceX said it was bringing roughly 200,000 to 220,000 Nvidia GB300 GPUs online each month and expects 2.5 to 3 GW of nameplate compute by the end of the year. That buildout is now reaching new sites like the proposed $24 billion power plant and supercomputer campus at Starbase.
The relationship between the two executives also goes back nearly a decade. Huang has often told the story of personally delivering Nvidia’s first DGX-1 AI supercomputer to Musk in 2016, when no other customer wanted one. “Nobody wanted to be part of it, except for Elon,” Huang said on the Joe Rogan Experience last December.
Musk did not say what role Huang might fill, and his reply stops short of a formal offer. Huang co-founded Nvidia in 1993 and still owns about 3.6 percent of its stock, so any move to a Musk company would depend on whether, and how, he leaves the chipmaker he has run for more than three decades.