Connect with us

News

Tesla’s slowest performance car dominates Porsche Taycan in drag, rolling race

Credit: Edmunds/YouTube

Published

on

Elon Musk was not kidding when he stated that Tesla does not make slow cars. From the Model 3 Performance to the absolutely bonkers Model S Plaid, Tesla’s cars are famed for their sheer fun factor, brought about in no small part by their handling, speed, and instant power. This is most represented in the company’s Performance and Plaid models, all of which represent the best that the EV maker could offer for each vehicle in its lineup. 

But even among Tesla’s Performance EVs, there is a ranking of sorts, with the Model S Plaid+ sitting at the top with its less than 1.99-second 0-60 mph time and 200 mph top speed. Sitting at the opposite end of the scale is the Model Y Performance, which features two electric motors that give it a 0-60 mph time of 3.5 seconds and a top speed of 155 mph. 

Credit: Edmunds/YouTube

Motoring media outlet Edmunds recently took it upon itself to test just how well Tesla’s slowest Performance car would stack up against the recently-launched base Porsche Taycan, which starts at around $80,000 before options. In true Porsche fashion, Edmunds’ base Taycan actually cost the firm closer to $100,000 thanks to its options, but the auto agency noted that it would be pretty cool to see just how well the electric sports sedan matches up with the chunky Tesla crossover. 

The base Taycan, as mentioned by MotorTrend, still provides a good degree of the fun factor present in its more premium counterparts like the Taycan 4S, Taycan Turbo, and Taycan Turbo S. While it only features an RWD setup, and while its launch is a far cry from the brutality of the Taycan Turbo S’ 0-60 mph sprint, it is still a pretty fun car to drive with 321 to 402 hp on tap. As Edmunds started the base Taycan’s match against the Model Y, however, some surprising results soon emerged. 

As it turned out, the Model Y Performance was too much for the base Porsche Taycan. The motoring agency raced the two vehicles thrice, and the Model Y walked all over its competitor each time. Granted, this was likely due to the Model Y’s weight and dual motor setup for the most part, but the results are impressive for a spacious crossover nonetheless. There’s something strangely satisfying about seeing an unassuming family vehicle dominating a sports car off the line. 

Watch the Tesla Model Y Performance’s drag race against the base Porsche Taycan in the video below. 

Don’t hesitate to contact us for news tips. Just send a message to tips@teslarati.com to give us a heads up.

Advertisement
-

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Tesla reveals Optimus Academy, where robots teach themselves

Tesla has begun building production quality Optimus robots in Fremont and revealed its training plan.

Published

on

By

Concept rendering of Tesla Optimus in mass production

Tesla has started building Optimus on the high volume line it set up inside its Fremont factory, and the company says the robots coming off it are the first that meet the bar for a real product. “The bots coming off this line are the first production-quality bots that we have manufactured,” Tesla wrote in its third quarter shareholder letter, adding that it has “proven that the current manufacturing process for Optimus is suitable for a commercial product.”

The line sits in space that built the Model S and Model X until this spring. Tesla cleared the old vehicle line in 46 days, as Teslarati reported in July, to make room for robot production sized for one million units a year. On Wednesday’s earnings call, Elon Musk said most of the equipment for that capacity is already in Fremont, with output set to climb toward roughly 20,000 robots a week as the line ramps.

Musk described the ramp as a classic S curve. “The growth of Optimus is an S curve, but the initial curve is a shallow slope,” he said. The team is now refining the robot’s AI, electromechanical design, reliability and service life, and Musk expects that work to be finished by the end of next year, when Tesla plans to start delivering Optimus to outside companies for dangerous, repetitive and around the clock jobs.

The most interesting part of the call was how Tesla plans to teach the robots. Its cars send real driving data back to the AI team from millions of vehicles, but Optimus has no fleet like that yet. “A big difference with Optimus versus the cars is we don’t have this vast fleet of cars from which we can gather training data,” Musk said. Tesla’s answer is an Optimus Academy, where 10,000 to 20,000 robots will practice a wide range of tasks and feed what they learn into the next version of the model. Every unit off the Fremont line becomes a source of that training data.

Smarter hardware is on the way too. Tesla plans to put its AI5 chip into Optimus next year, and Musk said a new Optimus video should arrive within one or two months showing the robot completing tasks driven by AI rather than preprogrammed motions. He took aim at rival humanoid demos that only run scripted routines, saying those would not hold up in the real world.

Advertisement
-

The supply chain is lining up behind the program. In September, Tesla certified Tuopu, Joyson and Sanhua as mass production partners for Optimus components. A far larger Optimus factory is also rising at Giga Texas, where drone footage from Joe Tegtmeyer showed the steel frame nearing completion, and Musk has pegged that plant’s long term target at 10 million robots a year.

Tesla executives also said Optimus production costs are trending toward the expected manufacturing cost of Cybercab, a sign the robot is being engineered for volume from the start. The hands remain the toughest piece of the design, a point Musk also made at the X Takeover event earlier this month, as Teslarati covered at the time, and that is where much of the current engineering effort is focused.

Continue Reading

Elon Musk

The Starship moon landing number NASA and Elon Musk can’t agree on

Musk disputes NASA estimate of 22 Starship launches for Moon landing, predicting 6 to 8.

Published

on

By

Concept rendering of SpaceX Starship landing on the moon via Grok

Elon Musk is disputing a new NASA safety panel estimate of how many Starship launches it will take to put astronauts on the Moon, saying the real number will be less than half the panel’s figure.

On Thursday, NASA’s Aerospace Safety Advisory Panel held its quarterly public meeting. Panel member Charlie Precourt, a former NASA astronaut, flagged the fueling process for SpaceX’s lunar lander as a major risk for Artemis IV, the mission planned to land a crew on the Moon in 2028. “We need to keep our eyes on numerous required fuelings for the lander,” Precourt said, according to Ars Technica. “I think the last estimate is around 22 flights.”

Ars Technica’s Eric Berger posted the comment on X, and Musk replied. “That’s way too high,” Musk wrote. “Actual number will be more like 6 to 8.”

The disagreement comes down to a basic problem with sending a ship as large as Starship to the Moon. Starship burns nearly all of its propellant just reaching Earth orbit, so it cannot continue on to the Moon without stopping for a refill. SpaceX’s answer is a gas station in space. First, a Starship that works as a storage tank, called a depot, is launched into orbit. Then a series of tanker Starships launch one at a time, dock with the depot and pump their leftover propellant into it. Once the depot is full, the lunar lander version of Starship launches, docks, fills up and heads for the Moon.

Every tanker trip is its own full rocket launch, which is why the count matters. More launches mean more time, more cost and more chances for something to go wrong before astronauts ever leave Earth. Berger estimated that even if SpaceX reaches twice weekly Starship launches by the end of 2027, filling a depot at the panel’s number would still take roughly three months.

Advertisement
-

How many tankers are needed depends mostly on how much propellant each one can carry to orbit and how much is lost along the way. Starship’s fuel and oxygen are stored at extremely cold temperatures, and some of it slowly boils off while waiting in orbit. More is lost in each transfer. NASA appears to be working from what Starship can lift today, while Musk’s range assumes a more capable rocket.

Musk has pushed back on higher counts before. In 2021, after a government document suggested 16 launches, he called that “extremely unlikely” and said eight tankers would be the most required.

Much of the answer depends on hardware SpaceX has not finished flying. As Teslarati noted earlier this year, the company plans to carry out the refueling process with its upgraded V3 Starship, and Precourt described Artemis IV as carrying “a large number of firsts.” He also praised NASA Administrator Jared Isaacman’s team for working to clear obstacles for both SpaceX and Blue Origin, whose Blue Moon lander does not rely on orbital refueling for its first mission.

Continue Reading

Elon Musk

Tesla’s secretive “Project Crystal Sun” gets a big green light in Texas

Fort Bend County approved four incentive agreements Thursday for Tesla’s proposed $10.1 billion solar factory.

Published

on

By

Elon Musk stands in profile against a clear blue sky, with a bright overhead sun shining above a vast landscape of Tesla solar panels stretching to the horizon, and a smaller Texas flag flying on a pole to his right.

Fort Bend County commissioners on Thursday approved a package of tax incentives for Tesla’s proposed $10.1 billion solar cell factory near Needville, Texas, giving the company one of the last local approvals it needs before it decides where to build. All four Tesla agreements passed 4 to 0.

The votes covered a property tax abatement inside Reinvestment Zone No. 34, a Chapter 381 economic development agreement, a foreign trade zone non-objection paired with payments in lieu of certain taxes, and a separate payment in lieu of taxes “true up” agreement, according to agenda notes from the Fort Bend Commissioners Court meeting.

The project, known internally as “Project Crystal Sun,” would make solar cells and finished modules on roughly 3,000 acres near FM 762 and FM 1994, south of the Brazos River. As Teslarati reported when the filing first surfaced in August, Tesla’s application under the state’s JETI Act splits the investment into $1.5 billion in real property and $8.6 billion in equipment, with 9,712 permanent jobs projected by 2033 and commercial operations targeted for the first quarter of 2029. The plant would handle the full chain from ingot and wafer production through cell testing.

Inside Tesla’s secretive $10 Billion “Project Crystal Sun” filing

Thursday’s approval does not lock in the site. Tesla has told the Texas Comptroller it is still weighing other locations, and site selection adviser David Dennison told Lamar Consolidated ISD trustees in September that the race had narrowed to Fort Bend and one out of state rival with a “very compelling package,” according to the Houston Chronicle. Tesla hopes to decide before the end of 2026, and the incentives still need sign off from the Comptroller and the Governor’s office.

Local officials have now done nearly everything within their control. Commissioners created the reinvestment zone in an August 24 special meeting, with Interim County Judge Daniel Wong formally withdrawing himself over his engineering firm’s past work with Tesla. Lamar CISD trustees voted 7 to 0 on September 15 to advance a JETI agreement that would tax Tesla’s qualifying property at 50 percent of its value for maintenance and operations from 2029 through 2038.

The plant lines up with a target Elon Musk set on Tesla’s Q4 2025 earnings call in January, when he said the company would “work toward getting 100 GW a year of solar cell production, integrating across the entire supply chain from raw materials all the way to finished solar panels.” In March, Tesla was reported to be negotiating a $2.9 billion purchase of Chinese solar manufacturing equipment bound for Texas. The Houston area already hosts Tesla’s Megafactory in Brookshire, where Megapack 3 production has started. Tesla said on its Q3 call that Megapack supply for 2027 is nearly sold out, and Musk wrote on X Thursday that the company is “increasing production of Megapacks as much as possible,” as demand from data centers climbs.

Continue Reading