Connect with us

News

Apparent Tesla Model Y “Juniper” update photos leaked

Credit: u/Abomb1997/Reddit

Published

on

A set of images reportedly featuring Tesla’s upcoming Model Y “Juniper” update has been shared online. While the images remain unconfirmed, they do hint at some potentially interesting design updates that may be coming to the best-selling all-electric crossover. 

Amidst the news of Tesla’s Model 3 “Highland” refresh on March 2023, Reuters published a report claiming that the electric vehicle maker was also working on an update for the Model Y, reportedly codenamed “Juniper.” 

Considering the huge similarities between the first-generation Model 3 and Model Y, numerous EV community members speculated then that the rumored “Juniper” update might simply involve the implementation of the reengineered Model 3’s upgrades on the Model Y. 

As could be seen in the leaked photos, which were shared in the r/TeslaMotors subreddit, there may be some interesting differences between the reengineered Model 3 and the potential Model Y update. This was hinted at in an image showing what appeared to be a red light bar with the words “Tesla” on the supposed Model Y “Juniper” prototype’s rear hatch. 

Such a light bar is not present in the reengineered Model 3 sedan. That being said, a leaked image supposedly showing the Model Y “Juniper” prototype’s interior suggested that the vehicle will still have a very similar cabin to the reengineered Model 3. 

While the leaked images of the supposed Tesla Model Y “Juniper” unit are quite exciting, it should be noted that CEO Elon Musk has been adamant that there is no “refresh” coming for the all-electric crossover this year. Amidst sightings of wrapped Model Y units in the wild, Musk highlighted in a post on X that “Tesla continuously improves its cars, so even a car that is 6 months newer will be a little better.” 

Advertisement
-

The Model Y is a very successful vehicle, and it became the world’s best selling car by volume last year. If an update to the vehicle does get rolled out, and if it is well-received by consumers, the Model Y may very well continue its reign as one of the world’s best-selling vehicles, electric or otherwise. 

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

News

Starlink Mini 2 arrives with one feature for true off-grid connectivity

Published

on

Credit: SpaceX

SpaceX officially launched the Starlink Mini 2 on November 10, delivering the first portable Starlink terminal designed around independent power.

Invitation-only preorders for select U.S. customers are priced at $999 plus tax, a figure that includes a full year of Roam Unlimited service valued at roughly $2,100. A refundable $100 deposit reserves the kit, with the balance due at shipment, expected to begin in mid-December. Broader availability is listed as coming soon.

The headline feature is the quick-swap 71 Wh battery. Clipped to the rear of the dish without tools, it delivers up to 4.5 hours of connectivity on a single charge.

The 490-gram pack includes its own USB-C port and LED indicators, so users can charge a spare separately and swap it in seconds while staying online. Starlink notes that the terminal can continue operating while the battery charges or run directly from a 60 W USB-C source. The retail box includes one battery, a 60 W USB-C charger, and a 3-meter cable.

Beyond power, the Mini 2 is thinner at 23.1 mm (versus 38.5 mm on the original Mini) while measuring 263 × 314 mm. With the battery and kickstand attached it weighs 1.6 kg.

Built-in Wi-Fi 6 expands coverage to up to 1,800 square feet, an IP67 rating protects against dust and water, and a standard 1/4-20 tripod thread plus physical power button round out the design. Field of view remains 110 degrees, and the unit retains support for mobile use.

For travelers, campers, and remote workers, the swappable battery removes the longstanding requirement for an external power bank or vehicle outlet that defined the first Mini. Spare packs sold separately further extend runtime, turning the compact terminal into a more self-contained solution.

While the bundled $999 invitation price sits well above the original Mini’s current $149 starting point, the included year of service and genuine untethered operation mark a clear step forward in portable satellite internet.

Continue Reading

Elon Musk

SpaceX’s $24B Starbase supercomputer plan slipped past a key roadblock

SpaceX wants a Starbase tax break for a $24 billion gas plant and supercomputer campus.

Published

on

By

Concept rendering of SpaceX President Gwynne Shotwell overlooks the company’s Hawthorne, California headquarters as an American flag flies over the campus at sunset.

SpaceX is asking its own company town for a tax break on a $24 billion natural gas power plant and supercomputing facility at Starbase, Texas, and the land it picked sits just outside the reach of a data center moratorium that took effect in neighboring Brownsville last week.

A City of Starbase public hearing notice says SpaceX “proposes to construct, own, and operate a gas-fired power plant and super-compute facility” on roughly 444 acres between Boca Chica Boulevard and the Port of Brownsville. The $24 billion figure covers only the initial phases, and the notice leaves room for future expansions. The Starbase City Commission will consider a property tax abatement and a related economic development agreement at a 7 p.m. hearing on December 9. The notice does not disclose the size or length of the abatement, or how much computing capacity the site would hold.

The location has a history. Over the summer, SpaceX asked Brownsville to remove the tract from its city limits and offered $220 million for water and wastewater projects in return. Brownsville approved the move in August, and Starbase later annexed the land. Brownsville’s own 90-day pause on data center applications took effect last week, and had the tract stayed inside the city, the project likely would have needed a different home.

The power side is already in front of state regulators. SpaceX has applied to the Texas Commission on Environmental Quality for air permits covering 35 mobile gas turbines producing roughly 750 megawatts, according to Politico, which also noted that two of the three Starbase commissioners voting on the incentives are SpaceX executives.

Building its own plant lets SpaceX skip the Texas grid. Gov. Greg Abbott paused new data center grid connections in August pending an audit, but a facility that generates its own electricity does not need one. The air permit still has to clear the TCEQ, where Abbott also ordered a halt on data center permits.

Advertisement
-

The bigger test arrives in January. Governor-elect Gina Hinojosa, who unseated Abbott last week, has said she will block data center approvals until the legislature passes new protections, and she has already asked state officials to hold off on any sale of Boca Chica State Park to SpaceX until she is sworn in. Tesla and SpaceX shares both fell the day after the election, and Musk’s first reaction on X was “Data centers in space looking pretty appealing right now.”

That line points to Starmind, SpaceX’s orbital compute constellation. Musk has said terrestrial compute will be “peanuts compared to orbital compute” and expects monthly orbital deployments to pass ground deployments around the end of 2028, as Teslarati reported. Until then, SpaceX still needs gigawatts on the ground. It ended the third quarter with 1.7 GW of nameplate compute, is targeting 2.5 to 3 GW by the end of this year and wants at least 10 GW more in 2027. Its existing Colossus sites around Memphis already run on gas turbines and face a lawsuit from residents over emissions.

Local reaction is split. The South Texas Environmental Justice Network has announced a protest, citing air quality, water use and energy bills, while some Brownsville residents told the Tribune they welcome the jobs. SpaceX did not respond to the Tribune’s questions about the project.

Continue Reading

Elon Musk

Tesla extends Cybertruck production as Musk concedes ‘sentimentality’

Published

on

Credit: diagnosticdennis/Instagram and @smile__no via Tesla Owners of Santa Clarita Valley/X

Tesla CEO Elon Musk announced that the company will extend Cybertruck production slightly to handle its extensive order backlog.

On Wednesday, Musk announced that “In order to work through more of the Cybertruck order backlog, production will be extended through the end of summer 2027.”

Tesla has already attempted to simplify its last months of production for the Cybertruck by eliminating several trim levels and only offering the Cyberbeast, the most expensive trim that starts at $109,990. The other two trim levels, the Cybertruck All-Wheel-Drive and Premium All-Wheel-Drive have both been discontinued.

There has been plenty of backlash against Tesla’s decision to ax the Cybertruck, but the company’s forecast prioritizes Cybercab and autonomy. Factory space at Gigafactory Texas that is not necessary is now being set aside for the Cybercab as the company truly embraces its “transportation-as-a-service” model.

There is still a slim chance the Cybertruck survives. Last evening, Tesla upfitter Unplugged Performance offered to take the Cybertruck line off of Tesla’s hands and continue building it, along with a CyberSUV.

Nevertheless, Tesla seems to be ending the Cybertruck on its terms after what will be a three-and-a-half-year run. It still does not really feel quite real; I think many of us thought the Cybertruck would be around for years to come.

Musk added more detail, stating that while it was not the smartest move, “there must be some room in this world for sentimentality or what’s the point?”

Other EV pickups on the market have experienced a similar fate.

The Ford F-150 Lightning was axed by the Detroit company due to the continued losses the company took from sales. That truck was never profitable, and Ford is still taking a quarterly loss in its EV side. However, things are moving along as it has plans for a mass market EV pickup, which will likely gather some substantial demand if Ford can get it just right.

Perhaps another extension or even a total change of heart might come. Only Musk knows.

Continue Reading