IF Metall’s strike against Tesla Sweden is dissuading a few large Swedish companies from purchasing Tesla cars. Swedish outlets speculate that the big companies cutting back on Tesla purchases might hit the car company harder than IF Metall’s moves against the US manufacturer.
Skanska and ABB are two of the most prominent companies that have decided to halt Tesla purchases. ABB is a leading tech company focused on various categories, including electrification, robotics & discrete automation, process automation, and motion infrastructure.
Meanwhile, Skanska is the largest construction and property development group in Sweden. It has projects in Europe, the United States, and Latin America. Skanska has 400 Tesla “benefit” cars and has decided not to buy more.
One of the main reasons companies like Skanska and ABB have decided to stop purchasing Tesla is IF Metall’s blockade on the car company’s workshops in Sweden. IF Metall’s strike against Tesla has made car repairs difficult in Sweden. Big companies are also waiting to see how Tesla and IF Metall’s face-off will affect the residual value of the company’s cars.
IF Metall’s strike started in October 2023, and there doesn’t seem to be an end in sight. Tesla isn’t making any moves toward signing a collective agreement, negotiating with IF Metall, or coming up with a compromise with the union. The Swedish union doesn’t seem prepared to give up on its strike either, despite very few Tesla employees joining its efforts.
The issue between IF Metall and Tesla has started to affect workers in companies with active collective agreements. IF Metall’s measures to force Tesla into signing a collective agreement are now affecting more than the Elon Musk-led company.
If you have any tips, contact me at maria@teslarati.com or via X @Writer_01001101.
Elon Musk
NASA just gave SpaceX more crew missions because Boeing can’t certify
NASA has filed a procurement notice announcing its intent to add six post-certification missions to SpaceX’s existing Commercial Crew Transportation Capability contract. The agency said it would order up to three of those missions immediately upon adding them to the contract, with the remaining three available as needed through the end of the International Space Station’s planned operations in 2030.
The reason for the expansion is straightforward. NASA cited recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, and the ongoing technical challenges of maintaining a reliable crew transportation capability as the driving factors behind the decision. Boeing’s CST-100 Starliner has still not been certified for crewed flights, and a cargo-only Starliner mission was not included on NASA’s most recent mission manifest. With Boeing effectively sidelined for the foreseeable future, SpaceX is the only American company capable of rotating crews to the station.
The history behind this contract tells the fuller story of how SpaceX got here. NASA originally awarded SpaceX its Commercial Crew contract in 2014 for $2.6 billion. In 2022 NASA modified the contract to add five missions covering Crew-10 through Crew-14, worth $1.436 billion, bringing the total contract value at that point to $4.9 billion. The recent May 18 filing by NASA extends that runway further, with Crew-12 currently docked at the station and Crew-13 assigned and targeting a mid-September 2026 launch.
According to a report by SpaceNews, NASA stated in its filing: “It is necessary to award additional PCMs to SpaceX given the recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, NASA’s projections for when an alternative crew transportation system may become available, and the ongoing technical challenges of maintaining a reliable capability for crewed flights to ISS.”
No dollar value for the new six missions has been publicly confirmed yet, but based on the 2022 precedent of roughly $287 million per mission, the new block could represent close to $1.7 billion in additional contract value. With SpaceX simultaneously preparing Starship as NASA’s Artemis lunar lander, filing its S-1 for a June IPO, and now absorbing more ISS crew rotation work, the company’s role as the primary contractor for American human spaceflight is no longer a matter of circumstance. It is NASA policy.
Energy
Zuckerberg’s Meta taps Musk’s Tesla for massive clean energy project
In a notable intersection of Big Tech powerhouses, Meta, led by Mark Zuckerberg, has partnered with Canadian energy infrastructure giant Enbridge on a significant renewable energy initiative that will rely on battery technology from Elon Musk’s Tesla.
The project, which was announced this week, marks another step in Meta’s aggressive push to power its expanding data center operations with clean energy, dispelling many of the complaints people have about them.
This new development is located near Cheyenne, Wyoming, and will feature a 365-megawatt (MW) solar farm paired with a 200 MW/1,600 megawatt-hour (MWh) battery energy storage system, also known as BESS. Tesla is providing the batteries for the project, valued at roughly $200 million.
The story was originally reported by Utility Dive.
This Wyoming project represents the first phase of Enbridge and Meta’s joint “Cowboy Project.” Once operational, it will deliver power to Meta’s regional data centers through Cheyenne Light, Fuel, and Power under Wyoming’s Large Power Contract Service tariff.
This tariff, originally developed in collaboration with Microsoft and Black Hills Energy, is designed specifically for large loads like data centers. It ensures that the renewable supply serves hyperscale customers without impacting retail electricity rates for other users.
The battery system will operate under a long-term tolling agreement, providing dispatchable capacity that enhances grid reliability. During periods of high demand, the utility can access the backup generation, addressing one of the key challenges of integrating large-scale renewables with the explosive growth of data center electricity demand driven by artificial intelligence.
This latest collaboration builds on prior joint efforts between Enbridge and Meta in Texas, including the 600 MW Clear Fork Solar, 152 MW Easter Wind, and 300 MW Cone Wind projects. Together with the Wyoming initiative, the companies have now partnered on roughly 1.6 gigawatts (GW) of combined solar, wind, and storage capacity.
The deal highlights the intensifying demand for reliable, low-carbon power from technology giants. Meta has committed to supporting its data center growth with renewable energy, joining peers like Microsoft and Google in seeking large-scale solutions. Enbridge’s Allen Capps described the project as “one of the larger utility-scale battery installations supporting U.S. data center operations and growth.”
The involvement of Tesla’s battery technology adds an intriguing layer, linking two of the world’s most prominent tech leaders—Zuckerberg and Musk—in the clean energy transition.
As data centers continue to drive unprecedented electricity load growth across the United States, projects like this one illustrate how hyperscalers are turning to strategic partnerships with traditional energy players and innovative storage solutions to meet both sustainability goals and reliability needs.
Elon Musk
SpaceX reveals reason for Starship v3 stand down, announces next launch date
SpaceX has decided to stand down from what was supposed to be the first test launch of Starship’s v3 rocket tonight after a minor issue with a hydraulic pin delayed the flight once more.
The company scrubbed its first test flight of the upgraded Starship v3 on May 21 in the final minutes of the countdown. SpaceX CEO Elon Musk quickly took to social media platform X, explaining that a hydraulic pin on the launch tower’s “chopsticks” arm failed to retract properly.
Musk added that the company would fix the issue this evening. SpaceX will attempt another launch tomorrow night at 5:30 p.m. CT, 6:30 p.m. ET, and 3:30 p.m. PT.
The hydraulic pin holding the tower arm in place did not retract.
If that can be fixed tonight, there will be another launch attempt tomorrow at 5:30 CT. https://t.co/DJAdvDYQpH
— Elon Musk (@elonmusk) May 21, 2026
The countdown for Starship Flight 12 — featuring the taller and more capable V3 stack with Booster 19 and Ship 39 — had been progressing smoothly until the late-stage issue surfaced. The Mechazilla tower arm, designed to secure the vehicle on the pad and eventually catch returning boosters, could not complete its retraction sequence.
SpaceX teams immediately began troubleshooting the hydraulic system for an overnight repair.
Starship V3 introduces several significant upgrades over earlier versions. These include greater propellant capacity, more powerful Raptor 3 engines, larger grid fins, enhanced heat shielding, and an improved fuel transfer system.
We covered the changes that were announced just days ago by SpaceX:
SpaceX unveils sweeping Starship V3 upgrades ahead of May 19 launch
The changes are intended to increase payload performance, support higher flight rates, and advance the vehicle toward operational missions, including Starlink deployments, NASA Artemis lunar landings, and future crewed Mars flights. The debut flight from Starbase’s new Launch Pad 2 marked an important milestone in scaling up the fully reusable Starship system.
This stand-down highlights the intricate challenges of preparing the world’s most powerful rocket for flight. Despite extensive pre-launch checks, a single component in the ground support equipment can force a scrub.
The incident aligns with Starship’s proven iterative development approach. Previous test flights have encountered both successes and setbacks, each providing critical data that refines hardware and procedures. Some outlets may call some of these flights “failures,” when in reality, they are all opportunities for SpaceX to learn for the next attempt.
With V3, SpaceX aims to reduce ground-system dependencies and increase launch cadence to meet ambitious long-term goals.