Connect with us
tesla fremont tesla fremont

News

Tesla (TSLA) bulls post optimistic outlook for Q3 2021’s deliveries

Credit: @TacosandTeslas/Twitter

Published

on

With the third quarter of 2021 ending, Tesla (NASDAQ:TSLA) bulls are now sharing their estimates for the company’s Q3 2021 vehicle deliveries. From Wall Street analysts to veteran retail investors that have been closely following the company for years, TSLA bulls seem to be expecting some impressive results for the third quarter. 

Wall Street consensus for the third quarter currently stands at 222,000 vehicle deliveries. Bullish analysts such as RBC Capital Markets analyst Joseph Spak, however, expect Tesla to post deliveries of 233,500 vehicles instead. If Spak’s estimate proves accurate, it will translate to a 67% year-over-year increase. 

The same is true for Piper Sandler analyst Alexander Potter, who raised his third-quarter delivery estimate for Tesla to 233,000 vehicles. The analyst remarked that his estimates are driven by the company’s strong production, adding that he believes “Q3 will be TSLA’s strongest quarter ever.” 

Retail investors that are veterans of TSLA stock have also posted their estimates, and they are just as optimistic as those shared by the RBC and Piper Sandler analysts. Avid TSLA watcher @TroyTeslike, for example, noted that his final estimate for Q3 2021 is 235,000 vehicle deliveries. The TSLA bull also estimated that the company could deliver a total of 858,000 vehicles for 2021. 

Rob Maurer of the Tesla Daily Podcast was more optimistic, noting on Twitter that he is estimating that the company would deliver 247,000 vehicles for Q3 2021. The Future Fund Managing Partner Gary Black, on the other hand, proved more conservative, estimating total deliveries of 230,000 vehicles, which is still over Wall Street’s consensus. 

Tesla has a high bar for Q3 2021. The company noted in the past that it intends to grow its deliveries by 50% this year. This was a lofty goal considering that 2020 saw Tesla deliver half a million vehicles over the year. For the company to reach its goal, it would have to ensure that it delivers about 750,000 vehicles in 2021. Tesla has already delivered about 386,000 cars in the first half of the year, however, which leaves the company shooting for 364,000 deliveries between Q3 and Q4 2021. 

Disclaimer: I am long TSLA.

Advertisement
-

The Teslarati team would appreciate hearing from you. If you have any tips, reach out to me at maria@teslarati.com or via Twitter @Writer_01001101.

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

Elon Musk

The Boring Company’s latest Tesla tunnel truck mod “fits like a glove”

The Boring Company has modified a Tesla powered tunnel truck to carry freight containers underground.

Published

on

By

the-boring-company-tesla-robotaxi

The Boring Company has found a second job for the Tesla hardware it already runs underground. In a post on X, Elon Musk’s tunneling company showed its latest Prufrock Liner Truck modified to carry a standard 20 foot shipping container. “Using TBC tunnels to transport freight,” the company wrote. “The latest Prufrock Liner Truck (using Tesla Model 3 batteries and drive units) has been modified to carry a standard 20′ shipping container. Fits like a glove!”

The photo shows a red container sitting on a long, low white chassis parked outside, with drive hardware visible at one end. The Boring Company did not say where or when freight hauling would start, which customers it has in mind, or how many trucks it is converting.

Until now, the liner trucks have hauled concrete. Teslarati reported in August on Liner Truck 3, which uses Model 3 battery packs and drive units to move more than 22,000 pounds of precast tunnel segments to the boring machine. It has 28 miles of range, tops out at 12 mph, and is piloted remotely from the company’s operations center in Texas. The freight version appears to be the same platform with a different bed, and The Boring Company has not said whether it will also be remotely piloted.

Freight has been on the company’s menu for years. When TBC updated its product lineup in 2021, its freight tunnel was described as sized to fit a standard shipping container, “barely.” The company later used the idea at Tesla’s own factory, where Prufrock 3 dug a tunnel to Giga Texas that now moves finished Cybertrucks away from the production line.

The Boring Company closed a $3 billion Series D in September at a $23 billion valuation, and Teslarati has covered how that money is tied to a UAE tunneling push and a faster Nashville build. In Nashville, Prufrock MB1 and MB2 are mining at the same time, and a third machine is expected to launch in late October. Each machine needs a steady supply of liner trucks, so any design that works for segments and containers alike gives the company more use out of the same Tesla parts.

The Vegas Loop remains the only Boring Company system open to the public, and it moves passengers in Tesla vehicles. A freight service would be a separate product, and the post gave no indication that one is close to launch. For now, it is a truck, a container and a short caption saying they fit together.

Continue Reading

Elon Musk

Elon Musk will give ‘every kid in America’ a SpaceX share in 2027

Published

on

Credit: Grok Imagine

Elon Musk said he is planning to give “every one of his SpaceX shares to every kid in America” in 2027, stating that “this will be the first of many.”

SpaceX went public earlier this year, and its stock price has been relatively stable since leveling off shortly after its IPO. Based on its current price, it’s a gift of just over $10 billion to children across the United States.

It appears to be closely related to President Donald Trump’s bank accounts for children, which were set up earlier this year as Trump Accounts.

Just hours earlier, Anthropic had announced the establishment of its Anthropic Public Benefit Fund, “a new wholly-owned entity dedicated entirely to public benefit.” Musk responded by stating he recommended “giving the shares directly to the public,” and that he would be doing it that way.

Just a little bit later, Musk said children across the U.S. would be getting a share from him:

There are roughly 70 million children, meaning someone under the age of 18, in the United States, according to the Federal Interagency Forum on Child and Family Statistics. Musk’s ownership of SpaceX stock shows he has around 849 million Class A shares of SpaceX stock, according to filings with the SEC.

Continue Reading

Elon Musk

Elon Musk reveals why Boring Co’s biggest East Coast project never happened

Published

on

(Credit: The Boring Company)

Elon Musk revealed in a post on X that “Permits were impossible to get,” explaining the fate of The Boring Company’s most ambitious East Coast proposal.

The comment responded to a query about what became of his July 20, 2017 announcement that he had “just received verbal govt approval” for an underground Hyperloop connecting New York City, Philadelphia, Baltimore, and Washington, D.C., capable of carrying passengers from the Big Apple to the Nation’s Capital in just 29 minutes.

The Boring Company receives verbal ‘approval’ to build NY to DC Hyperloop tunnel

The 2017 post, which envisioned city-center stations and multiple elevators in each city, sparked immediate scrutiny. Local and state officials in New York, Philadelphia, Baltimore, and D.C. said they had no knowledge of any approval. A White House spokesperson confirmed only “promising conversations” about the transformative infrastructure.

Musk clarified shortly after that there was “still a lot of work” to do for formal approvals.

Limited progress followed, as Maryland Governor Larry Hogan’s administration issued a conditional utility permit and supported work near Fort Meade. In 2018, Washington, D.C., granted a preliminary permit for site preparation and excavation on a vacant lot at 53 New York Ave. NE in the NoMa neighborhood, which The Boring Company said could become a station.

A draft environmental assessment for a D.C.-Baltimore segment was released in 2019. Yet, by April 2021, the company had removed the project from its website, and the Federal Highway Administration reported receiving no indication of further interest. Communication with Maryland officials had ceased.

The full corridor would have required coordination among the District of Columbia, Maryland, Pennsylvania, New York, the Federal Highway Administration, the Army Corps of Engineers, the National Park Service, and other agencies.

Environmental reviews under the National Environmental Policy Act, utility clearances, and approvals for novel infrastructure added to the overall complexity of the project and its approval.

Speculation on the permitting barriers centers around a few factors, but a multi-state, multi-level route involving unproven high-speed vacuum-tube technology inherently triggers exhaustive safety, environmental, and engineering reviews that can stretch for years, even for conventional projects.

There are also other elements, of course, like officials who may face political exposure if a privately funded, untested system encountered anything such as cost overruns, delays, or safety issues. On the outset of this project, there were limited things such as engineering plans or demonstrated technology maturity, which also added to the potential skepticism.

The East Coast vision for Boring Co., once framed as a privately funded revolution that could reshape Northeast travel, quietly ended without construction of the promised network. Musk’s recent statement frames the outcome as a regulatory impasse, unfortunate but not unexpected.

Continue Reading