Connect with us
tesla fremont tesla fremont

News

Tesla stock surges amid Fremont factory’s impending restart of production

(Credit: Tesla)

Published

on

As Tesla (NASDAQ:TSLA) prepares to get back to work, investors are taking on a bullish stance on the company’s stock. Reports indicate that Tesla is planning to bring back workers to its main vehicle production facility in Fremont, California, this week. The company is reportedly aiming to restart its paint and stamping department first, as per Barron’s. Further operations in Fremont, Giga New York, and Giga Nevada are expected to be restarted May 4.

The company’s attempts to bring paint workers back could begin the process of updating the Fremont factory’s South Paint Shop. Tesla applied for permits to upgrade the facility’s HVAC and fire protection in late April. Bringing these workers back could help start the process of updating a portion of the Fremont plant that has given the automaker challenges in the past.

Overall, it appears that Tesla’s initiative to gradually begin bringing back workers to Fremont is encouraging analysts to maintain a positive outlook on TSLA stock. This perspective is becoming increasingly apparent after the entire automotive industry has taken a big hit due to the COVID-19 pandemic. Despite this, Tesla has so far proven to be an outlier, exhibiting impressive delivery and production results in the first quarter.

Dan Ives, an analyst at Wedbush, expressed his thoughts on the matter. “Bringing back workers ahead of a potential Fremont factory restart on May 4 is a clear feather in the cap for the bulls. It appears the underlying delivery demand is still there despite this economic abyss and speaks to Tesla looking to fulfill domestic orders,” Ives noted.

Even though Tesla has not had a production line actively building vehicles in the United States for a month now, the company is still delivering cars to consumers including the Model Y crossover. After the company released its above-expected delivery figures for Q1, analysts are interested to see what the company can manage to pull off for Q2. Apart from this, the company’s Gigafactory Shanghai facility is in full operation, producing the Model 3 for the Chinese market.

Tesla’s presence in China has certainly helped the stock, but the company’s push to get back to work in Fremont seems to show that demand for its vehicles continues to remain consistent. Tesla’s initial deliveries of the Model Y largely flew under the radar because of the pandemic. Still, the electric automaker seems to focus its efforts on ramping up its production lines once again to get back on track for its quarterly and annual goals.

Advertisement
-

Tesla’s Q1 2020 earnings call is scheduled for Wednesday, April 29, 2020, at 3 PM PST.

As of writing, Tesla stock is trading +8.38% at $785.93 per share. 

Disclosure: I have no ownership in shares of TSLA and have no plans to initiate any positions within 72 hours.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

The Boring Company’s latest Tesla tunnel truck mod “fits like a glove”

The Boring Company has modified a Tesla powered tunnel truck to carry freight containers underground.

Published

on

By

the-boring-company-tesla-robotaxi

The Boring Company has found a second job for the Tesla hardware it already runs underground. In a post on X, Elon Musk’s tunneling company showed its latest Prufrock Liner Truck modified to carry a standard 20 foot shipping container. “Using TBC tunnels to transport freight,” the company wrote. “The latest Prufrock Liner Truck (using Tesla Model 3 batteries and drive units) has been modified to carry a standard 20′ shipping container. Fits like a glove!”

The photo shows a red container sitting on a long, low white chassis parked outside, with drive hardware visible at one end. The Boring Company did not say where or when freight hauling would start, which customers it has in mind, or how many trucks it is converting.

Advertisement
-

Until now, the liner trucks have hauled concrete. Teslarati reported in August on Liner Truck 3, which uses Model 3 battery packs and drive units to move more than 22,000 pounds of precast tunnel segments to the boring machine. It has 28 miles of range, tops out at 12 mph, and is piloted remotely from the company’s operations center in Texas. The freight version appears to be the same platform with a different bed, and The Boring Company has not said whether it will also be remotely piloted.

Freight has been on the company’s menu for years. When TBC updated its product lineup in 2021, its freight tunnel was described as sized to fit a standard shipping container, “barely.” The company later used the idea at Tesla’s own factory, where Prufrock 3 dug a tunnel to Giga Texas that now moves finished Cybertrucks away from the production line.

The Boring Company closed a $3 billion Series D in September at a $23 billion valuation, and Teslarati has covered how that money is tied to a UAE tunneling push and a faster Nashville build. In Nashville, Prufrock MB1 and MB2 are mining at the same time, and a third machine is expected to launch in late October. Each machine needs a steady supply of liner trucks, so any design that works for segments and containers alike gives the company more use out of the same Tesla parts.

The Vegas Loop remains the only Boring Company system open to the public, and it moves passengers in Tesla vehicles. A freight service would be a separate product, and the post gave no indication that one is close to launch. For now, it is a truck, a container and a short caption saying they fit together.

Continue Reading

Elon Musk

Elon Musk will give ‘every kid in America’ a SpaceX share in 2027

Published

on

Credit: Grok Imagine

Elon Musk said he is planning to give “every one of his SpaceX shares to every kid in America” in 2027, stating that “this will be the first of many.”

SpaceX went public earlier this year, and its stock price has been relatively stable since leveling off shortly after its IPO. Based on its current price, it’s a gift of just over $10 billion to children across the United States.

It appears to be closely related to President Donald Trump’s bank accounts for children, which were set up earlier this year as Trump Accounts.

Just hours earlier, Anthropic had announced the establishment of its Anthropic Public Benefit Fund, “a new wholly-owned entity dedicated entirely to public benefit.” Musk responded by stating he recommended “giving the shares directly to the public,” and that he would be doing it that way.

Just a little bit later, Musk said children across the U.S. would be getting a share from him:

Advertisement
-

There are roughly 70 million children, meaning someone under the age of 18, in the United States, according to the Federal Interagency Forum on Child and Family Statistics. Musk’s ownership of SpaceX stock shows he has around 849 million Class A shares of SpaceX stock, according to filings with the SEC.

Continue Reading

Elon Musk

Elon Musk reveals why Boring Co’s biggest East Coast project never happened

Published

on

(Credit: The Boring Company)

Elon Musk revealed in a post on X that “Permits were impossible to get,” explaining the fate of The Boring Company’s most ambitious East Coast proposal.

The comment responded to a query about what became of his July 20, 2017 announcement that he had “just received verbal govt approval” for an underground Hyperloop connecting New York City, Philadelphia, Baltimore, and Washington, D.C., capable of carrying passengers from the Big Apple to the Nation’s Capital in just 29 minutes.

The Boring Company receives verbal ‘approval’ to build NY to DC Hyperloop tunnel

The 2017 post, which envisioned city-center stations and multiple elevators in each city, sparked immediate scrutiny. Local and state officials in New York, Philadelphia, Baltimore, and D.C. said they had no knowledge of any approval. A White House spokesperson confirmed only “promising conversations” about the transformative infrastructure.

Musk clarified shortly after that there was “still a lot of work” to do for formal approvals.

Limited progress followed, as Maryland Governor Larry Hogan’s administration issued a conditional utility permit and supported work near Fort Meade. In 2018, Washington, D.C., granted a preliminary permit for site preparation and excavation on a vacant lot at 53 New York Ave. NE in the NoMa neighborhood, which The Boring Company said could become a station.

A draft environmental assessment for a D.C.-Baltimore segment was released in 2019. Yet, by April 2021, the company had removed the project from its website, and the Federal Highway Administration reported receiving no indication of further interest. Communication with Maryland officials had ceased.

The full corridor would have required coordination among the District of Columbia, Maryland, Pennsylvania, New York, the Federal Highway Administration, the Army Corps of Engineers, the National Park Service, and other agencies.

Environmental reviews under the National Environmental Policy Act, utility clearances, and approvals for novel infrastructure added to the overall complexity of the project and its approval.

Speculation on the permitting barriers centers around a few factors, but a multi-state, multi-level route involving unproven high-speed vacuum-tube technology inherently triggers exhaustive safety, environmental, and engineering reviews that can stretch for years, even for conventional projects.

Advertisement
-

There are also other elements, of course, like officials who may face political exposure if a privately funded, untested system encountered anything such as cost overruns, delays, or safety issues. On the outset of this project, there were limited things such as engineering plans or demonstrated technology maturity, which also added to the potential skepticism.

The East Coast vision for Boring Co., once framed as a privately funded revolution that could reshape Northeast travel, quietly ended without construction of the promised network. Musk’s recent statement frames the outcome as a regulatory impasse, unfortunate but not unexpected.

Continue Reading