Connect with us

News

Toyota dubbed as world’s third-most obstructive company against climate policies

(Credit: Toyota)

Published

on

Independent think tank InfluenceMap has released its Corporate Climate Policy Footprint Report, which ranks the 50 most influential companies and industry associations that are currently blocking climate policy action worldwide. While it was no surprise to see oil companies such as ExxonMobil and Chevron at the top of the report’s list, its third-ranked company was quite a surprise. Toyota was dubbed the world’s third-most obstructive organization for lobbying governments that set climate policies.

This effectively made Toyota the worst carmaker on the think tank’s list. But it wasn’t alone. Fellow veteran automakers that were also called out in the report included BMW, Daimler, and Hyundai. The report cited Toyota’s past initiatives to retain the internal combustion engine as one of the reasons behind the company’s ranking.  

Credit: InfluenceMap

“Toyota Motor has campaigned against proposed regulations globally to phase out internal combustion engines in favor of electric vehicles in 2020-21 and ranks 3rd on InfluenceMap’s list of global companies most negatively influencing Paris-aligned climate policy. It is joined by BMW (18th), Daimler (24th), and Hyundai (25th) from the automotive sector, which as a group is highly negative on stringent climate regulation on the automotive sector,” the report read

In a statement to The Guardian, Ed Collins, a director at InfluenceMap, noted that the strategies adopted by companies that obstruct climate policies have evolved over time. “The corporate playbook for holding back climate policy has come a long way from science denialism, but it is every bit as damaging. What we are seeing is not limited to efforts to undermine regulations directly. It also involves prolific and highly sophisticated narrative capture techniques, leading governments down incredibly dangerous paths,” Collins said

While Toyota’s rankings in the think tank’s report seems unfortunate, the carmaker has been called out for its lobbying tactics in the past. As per a New York Times report, the company lobbied congressional leaders to push back against the Biden administration’s efforts to accelerate the adoption of electric cars. Toyota’s lineup of vehicles has also been quite stagnant in their EPA figures, resulting in some of the company’s offerings being in the bottom tier of the country’s economy ratings. 

Advertisement

Toyota’s executives have also demonstrated a reluctance to accept electric cars as the best course solution to make the transportation sector sustainable. Earlier this year, Toyota Chairman Akio Toyoda claimed that Japan would run out of power in the summer if all cars were electric. Toyota has also shown a tendency to heavily lean into hybrids instead as well, with the company even adopting a questionable marketing initiative for its “self-charging hybrid” cars that actually just run on fossil fuels

Read InfluenceMap’s Corporate Climate Policy Footprint Report below. 

IM ClimatePolicyFootprint 2021 by Simon Alvarez on Scribd

Don’t hesitate to contact us with news tips. Just send a message to tips@teslarati.com to give us a heads up.

Advertisement

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Elon Musk shares updated Starship V3 maiden launch target date

The comment was posted on Musk’s official account on social media platform X.

Published

on

Credit: SpaceX/X

SpaceX CEO Elon Musk shared a brief Starship V3 update in a post on social media platform X, stating the next launch attempt of the spacecraft could take place in about four weeks.

The comment was posted on Musk’s official account on social media platform X.

Musk’s update suggests that Starship Flight 12 could target a launch around early April, though the schedule will depend on several remaining milestones at SpaceX’s Starbase launch facility in Texas.

Among the key steps is testing and certification of the site’s new launch tower, launch mount, and tank farm systems. These upgrades will support the next generation of Starship vehicles.

Advertisement

Booster 19 is expected to roll to the launch site and be placed on the launch mount before returning to the production facility to receive its 33 Raptor engines. The booster would then return for a static fire test, which could mark the first time a Super Heavy booster equipped with Raptor V3 engines is fired on the pad.

Ship 39 is expected to undergo a similar preparation process. The vehicle will likely return to the production site to receive its six engines before heading to Massey’s test site for static fire testing.

Once both stages are prepared, the booster and ship will roll out to the launch site for the first full stack of a V3 Super Heavy and V3 Starship. A full wet dress rehearsal is expected to follow before any launch attempt.

Elon Musk has previously shared how SpaceX plans to eventually recover Starship’s upper stage using the launch tower’s robotic arms. Musk noted that the company will only attempt to catch the Starship spacecraft after two successful soft landings in the ocean. The approach is intended to reduce risk before attempting a recovery over land.

Advertisement

“Should note that SpaceX will only try to catch the ship with the tower after two perfect soft landings in the ocean. The risk of the ship breaking up over land needs to be very low,” Musk wrote in a post on X.

Such a milestone would represent a major step toward the full reuse of the Starship system, which remains a central goal for SpaceX’s long-term launch strategy.

Continue Reading

News

Tesla opens first public Tesla Semi Megacharger site in Los Angeles

The development was highlighted in a post on social media platform X by the official Tesla Semi account.

Published

on

Credit: Tesla

Tesla has opened its first public Tesla Semi Megacharger site in Los Angeles. The station reportedly offers up to 750 kW charging speeds and is open to Tesla Semi customers.

The development was highlighted in a post on social media platform X by the official Tesla Semi account.

Tesla Semi Megachargers

The Los Angeles site seems to be the first public Tesla Semi Megacharger that is not located at a Tesla factory. It is also the third Megacharger site currently visible on Tesla’s map.

The Megacharger system is designed specifically for the Tesla Semi and is capable of delivering extremely high charging speeds to support long-haul trucking operations. Infrastructure such as this will likely play a key role in making the Semi competitive with diesel-powered transport trucks.

Advertisement

Tesla’s progress with the Semi has also drawn attention in recent days after Elon Musk biographer Ashlee Vance shared photos from inside the Tesla Semi factory near Giga Nevada. The images suggested that preparations for higher production volumes may be underway, hinting that a broader ramp of the Tesla Semi’s production indeed be approaching.

New deployment strategies

Tesla has continued expanding its broader charging network through several new strategies aimed at accelerating infrastructure deployment. One of these initiatives is the Supercharger for Business program, which allows third parties to purchase Tesla Supercharger equipment and deploy charging stations while still integrating with Tesla’s network.

The program recently marked a milestone in Alpharetta, Georgia, where the city deployed four 325 kW city-branded Superchargers near the Alpharetta Department of Public Safety on Old Milton Parkway. The chargers support the city’s Tesla Model Y police vehicles while also remaining accessible to the public.

As per a report from EVwire, the project was designed not only to support fleet charging but also to generate economic returns that could offset the city’s investment. Tesla’s Supercharger for Business program has already attracted several participants, including businesses and charging providers such as Suncoast Charging, Pie Safe bakery in Idaho, Francis Energy in Oklahoma, and Wawa convenience stores.

Advertisement
Continue Reading

Elon Musk

The Boring Company’s Vegas Loop moves 82k riders during CONEXPO

The Loop’s feat was highlighted by The Boring Company in a post on its official account on social media platform X.

Published

on

Credit: The Boring Company/X

The Boring Company said its Vegas Loop system transported roughly 82,000 passengers during the recent CONEXPO-CON/AGG construction trade show in Las Vegas. The event was held at the Las Vegas Convention Center (LVCC) from March 3-7, 2026. 

The Loop’s feat was highlighted by The Boring Company in a post on its official account on social media platform X.

CONEXPO-CON/AGG 2026

CONEXPO-CON/AGG is one of the largest construction trade shows in North America. This year’s event was quite impressive, attracting more than 140,000 construction professionals from 128 countries across the world.

Considering the number of this year’s attendees, the LVCC Loop seemed to have proven itself to be a very useful transportation solution. A video posted by The Boring Company on its official X account featured attendees expressing their enthusiasm for the underground transport system, with some stating that they would like to see similar tunnels across Las Vegas. 

Advertisement

The LVCC Loop is only part of the greater Vegas Loop network, which is actively under construction.

New Vegas Loop extensions

One of the newest additions is a station at the Fontainebleau Las Vegas resort on the Strip. The station is located on level V-1 of the resort’s south valet area, according to a report from the Las Vegas Review-Journal. From the Fontainebleau, passengers can travel free of charge to stations serving the Las Vegas Convention Center, as well as to Loop stations at Encore and Westgate.

The system is also expanding beyond the Strip corridor. In December, The Boring Company began offering Vegas Loop rides to and from Harry Reid International Airport. These trips include a limited above-ground segment after receiving approval from the Nevada Transportation Authority to allow surface street travel tied to Loop operations.

The Boring Company President Steve Davis previously told the Review-Journal that the University Center Loop segment, which is currently under construction, is expected to open in the first quarter of 2026. The extension would allow Loop vehicles to travel beneath Paradise Road between the convention center and the airport, with a planned station just north of Tropicana Avenue.

Advertisement
Continue Reading