Lifestyle
Elon Musk talks Neuralink, coronavirus, and the future in Joe Rogan podcast Round 2
Tesla and SpaceX CEO Elon Musk recently made his second appearance on the widely popular Joe Rogan Experience podcast, which was released today. Unlike many of Rogan’s podcasts that are streamed live for viewers to watch in real-time, Musk’s second episode was pre-recorded and released on May 7.
Musk and Rogan, who is a commentator for the Ultimate Fighting Championship and a comedian, discussed several topics that have been in the news recently. The two shared their thoughts on Musk’s plans to sell his estate and possessions, as well as his plans for Neuralink and Mars. Rogan and Musk also discussed the coronavirus, which has been a talking point of the CEO for some time.
Plans for houses, real estate, and Mars
Last week, Musk announced on Twitter that he would be selling his houses and almost all of his physical possessions. “Devoting myself to Mars and Earth. Possession just weigh you down,” he said when a follower asked about his reasons.
Don’t need the cash. Devoting myself to Mars and Earth. Possession just weigh you down.
— Elon Musk (@elonmusk) May 1, 2020
Musk provided an interesting explanation about his decision to sell his possessions to Rogan. “People say, ‘Hey, billionaire, you’ve got all this stuff’ Well, now I don’t have stuff. Now, what are you going to do?” Musk also stated that possessions were a roadblock in personal development. Thus, instead of focusing too much on houses on Earth, the CEO stated that he’d rather dedicate his efforts to Mars.
Musk further noted that he did not see the merit in owning so many properties. After Rogan and Musk talked about Gene Wilder’s house, which is located across the street from his live-in estate, he stated that owning many homes is not practical. Also, he did not want to get caught up in the small details that come with owning a property, like interior design and features. “Does it really make sense for me to spend time designing and building a house, and I’d be getting OCD on the little details…or should I be allocating that time to getting us to Mars. I should probably do the latter,” Musk said.
Neuralink
Neuralink could come as soon as next year, Musk detailed during the podcast. The CEO outlined the process for how a brain chip will be installed, and how it would be implanted in the skull of a patient. According to Musk, a portion of the skull would be removed and replaced by a Neuralink device.
Musk believes that Neuralink could help people with brain-related health issues. It could restore limb functions, eyesight, hearing, help with neurological diseases like Parkinson’s, and improve human movement. Musk also believes that there are potential cognitive benefits to Neuralink, as it could pave the way for hindering brain issues like epilepsy, Alzheimers, and strokes. He thinks the Neuralink device could recognize these issues before the body has time to react and send a “counter pulse” that could stop the problem from occurring in the first place.
The developments of Neuralink could revolutionize human life as we know it. Development is still ongoing, and Musk believes hat a year from now, Neuralink will be available for use.
Thoughts on Coronavirus
Musk has been vocal for his discontent on COVID-19 and how it is currently being handled. Last week during Tesla’s Q1 2020 Earnings Call and then on Twitter two days later, Musk vocalized his request to lift Stay-at-Home orders, stating they were inhibiting the freedom of Americans.
“I think the mortality rate is much less than what the World Health Organization said it was,” Musk said.
He maintained this point of view during the Joe Rogan Experience Podcast, stating that more freedom should be given to citizens. Those who do not want to stay home should not be required to, and those who want to stay home should have the right to do so. Musk did maintain that he is supportive of the use of face masks when people are out in public because it could stop the transmission of any germs, illness, or virus. “I think that would be a great adoption throughout the world,” he said.
Musk’s second meeting with Joe Rogan also included a brief update to Tesla’s plans with the Cybertruck and Roadster, where he indicated the all-electric pickup should come before the supercar.
The constructive conversation between the two influential figures helped clear the air with some of the more controversial topics surrounding Musk today. A year and a half removed from their first meeting, Musk and Rogan’s relationship seems to be relaxed and constructive as the two men maintained plenty of interesting conversational pieces for viewers to feast on.
Watch Episode 1470 of the Joe Rogan Experience, featuring Elon Musk below.
Elon Musk
Elon Musk drops a surprise update on Boring Company’s next big dig
Musk says Boring Company could shrink the Austin to San Antonio drive to just minutes.
Elon Musk says The Boring Company is working on what he called “a simple, precursor Hyperloop” tunnel connecting Austin and San Antonio, targeting speeds above 200 mph and cutting a drive that can take up to two and a half hours down to a consistent under 30 minutes. Musk posted the idea on X Sunday, in a reply to a repost of an AI generated video imagining a science fiction future with human colonies on other worlds, which he shared with the line “This is the future we shall bring into being.”
This is the future we shall bring into being pic.twitter.com/8aD0w8MDVc
— Elon Musk (@elonmusk) September 20, 2026
The Boring Company’s own account picked up the idea in the same thread, adding a detail about how the trip would actually work: “Because Loop/Hyperloop is express (i.e. no intermediate stops), one could travel from an Austin parking lot to a favorite San Antonio restaurant in about 30 minutes. As long as they both have Loop stations.” That framing ties the proposed intercity link to the same station model the company already runs in Las Vegas, where riders enter the tunnel network through small, garage style stops rather than one central terminal.
This is not the company’s first run at the Austin to San Antonio corridor. Boring Company floated tunnels between the two cities as far back as 2021, and later competed for a separate San Antonio Loop project tied to the airport before that specific bid stalled. Pitches for tunnels in Chicago, Los Angeles, and a New York to Washington corridor have followed a similar pattern of big announcement without a shovel in the ground.
What is different this time is the balance sheet, especially since The Boring Company closed a 3 billion dollar funding round led by investors in the United Arab Emirates earlier this month at a valuation near 23 billion dollars, giving the tunneling company more capital to chase speculative projects than it had during its earlier Texas pitches. The company is also mid-build on two other intercity systems it has actually broken ground on, inc;luding a Nashville tunnel linking downtown to the airport, where a second boring machine finished commissioning in June, and its Las Vegas network, where the station count keeps climbing on paper faster than tunnels get dug.
That gap between announcement and execution is the reason to treat Sunday’s post as an opening bid rather than a project. A tunnel spanning roughly 80 miles between two metro areas, running at speeds Boring Company has not demonstrated over any real distance, would dwarf anything the company has built. For now, the Austin to San Antonio Hyperloop exists as a caption under an AI generated space video.
Elon Musk
Tesla eyes supply partners for Optimus mass production
Tesla certified three Chinese suppliers for Optimus mass production, signaling its robot timeline is accelerating.
Tesla’s robotics team traveled to Ningbo, in China’s Zhejiang province, on September 16 and spent the following day auditing component suppliers for Optimus, according to a Bloomberg report cited by RobotAIGeek. The visit moved three manufacturers from provisional status to certified mass production partners: Tuopu Group, which handles actuators and chassis components, Ningbo Joyson Electronic, a sensor supplier, and Zhejiang Sanhua Intelligent Controls, which builds thermal management systems. All three already supply parts to Tesla’s electric vehicles, and the audit reportedly came with fresh orders that supply chain reports put at an initial batch of roughly 5,000 units.
Tuopu, Joyson, and Sanhua built their manufacturing base serving the automotive industry, where tolerances and volume requirements are already close to what a mass produced humanoid robot demands. Sanhua in particular has history here. Teslarati reported last October that the company had received a roughly $685 million order for linear actuators tied to Optimus, a volume industry watchers estimated could cover around 180,000 robots once production ramped.
Supply chain reports tied to this week’s audit put Tesla’s near term production goal at about 1,000 Optimus units a week by late September, rising to 2,000 to 2,500 units a week by the end of the year. That pace would put real weight behind the timeline Tesla has been building toward since May, when it wound down Model S and Model X production at Fremont to convert that floor space into a dedicated Optimus line targeting one million units annually. JPMorgan analysts who toured the factory in August confirmed the conversion took roughly four months, a pace Musk has called unprecedented for a facility that size.
New drone video shows Tesla’s Optimus Factory reaching a turning point
Fremont is only the first phase. A second, larger Optimus plant is rising at Gigafactory Texas, where drone footage shared by Joe Tegtmeyer last week showed the structural steel nearing completion on the north end of the building. Tesla has said that facility is meant to eventually support production of up to 10 million units a year, though volume output there is not expected before 2027.
Commercial sales of Optimus are still targeted for the second half of 2027, but production is expected to start well before then. JPMorgan analyst Rajat Gupta has said Tesla’s “Optimus Academy” program, which uses early units to collect real world training data inside Tesla’s own facilities, is expected to be running later this year. Bloomberg Intelligence analyst Ian Ma described the Ningbo audits as “a positive commercialization signal for China’s humanoid supply chain,” noting that sentiment could improve further if the visit leads to confirmed supplier nominations and larger orders. The Solactive China Humanoid Robotics Index rose about 1.4% on the news, though it remains down roughly 30% for the year.
Elon Musk
Tesla primes Cybercabs for 4K streaming and high bandwidth gaming with Starlink integration
Tesla is now shipping Cybercabs from Giga Texas with Starlink hardware built in as standard.
Tesla’s Cybercabs are now leaving Gigafactory Texas with Starlink hardware on the rear hatch in significant numbers, according to drone footage captured Tuesday by longtime Austin drone observer Joe Tegtmeyer. Production at the factory ramped back up after the Labor Day weekend, and his flyover of the outbound lot showed rows of gold Cybercabs alongside Model Y Long Wheelbase units, many carrying the satellite module for the first time as standard equipment rather than a one off retrofit.
Giga Texas today is busy with production coming back up following the long weekend. Of interest today in the outbound lot is the appearance of hundreds of Mode; YL’s and many more Cybercabs and for the 1st time equipped with the Starlink module one the hatch in big numbers.
At… pic.twitter.com/G9yl6s51m4
— Joe Tegtmeyer 🚀 🤠🛸😎 (@JoeTegtmeyer) September 8, 2026
Tesla first showed Starlink built into an actual Cybercab on August 10, when the Robotaxi account posted images of a single gold unit with the antenna integrated into the roofline above the taillights and called it the first Cybercab with Starlink integration. That followed a July reveal where Tesla and Starlink jointly posted a cutaway diagram of the antenna placement without a working vehicle to back it up. Ashok Elluswamy, Tesla’s VP of AI software, said at the time that the connection isn’t required for the car to drive itself. It exists mainly for navigation, customer service and keeping tabs on the fleet.
Musk has made a different case in public. During Tesla’s Q2 earnings call, he said the company can’t afford robotaxis stranded in what he called “Bermuda Triangles of lack of cellular connectivity,” and he separately claimed on X that Starlink will eventually reach every Tesla built, calling it the only way to deliver high bandwidth to billions of vehicles. He has also pitched the antenna as an entertainment upgrade, telling riders they would be able to stream 4K video or play games during a trip.
The rollout has moved fast since. Robotaxi service opened to the public in Austin on September 3, and Cybercabs had already been spotted with Starlink hardware in Houston and near Miami International Airport in the weeks before Tuesday’s factory footage showed the module shipping at volume rather than on scattered test units. Whether the satellite link earns its keep is still an open question. Tesla’s unsupervised service currently runs in dense metro geofences in Texas and Florida, markets where cellular coverage is already strong, which is not where the rural dead zones Musk describes tend to show up.