News
Tesla responds to $137M jury order over alleged racism in Fremont Factory
Tesla has issued a statement responding to a San Francisco jury’s recent decision, which ordered the company to pay $137 million to a former contract employee who worked at the Fremont factory. The former worker, Owen Diaz, had accused the company of ignoring the racial abuse that he suffered through while working at the California-based plant around 2015 through 2016.
The jury’s decision was related by Lawrence Organ, the plaintiff’s lawyer from the California Civil Rights Law Group. “It’s a great thing when one of the richest corporations in America has to have a reckoning of the abhorrent conditions at its factory for Black people,” Organ stated. Tesla’s lawyers have not issued a comment about the ruling as of writing.
The initial lawsuit alleged that Diaz, who worked as an elevator operator at the Fremont Factory for about a year in 2015 and 2016, was called a racial slur by a supervisor and other colleagues on a regular basis. The former employee also stated that other Fremont Factory workers had left derogatory cartoons depicting Black children around the facility.
The jury deliberated for about four hours before agreeing that Tesla had created a hostile work environment by failing to address the racism being faced by Diaz. The jury agreed that a total amount of $137 million — comprised of $130 million worth of punitive damages and $6.9 million for emotional distress — was sufficient for the case. Tesla is expected to appeal the order.
In response to the jury’s order, Tesla’s VP People Valerie Capers Workman posted a blog post on the company’s official website to explain some points about the case and the jury’s $137 million order. Workman noted that Diaz, as well as three other witnesses, testified at the trial that they regularly heard racial slurs on the Fremont factory floor. Such comments, however, were usually used by African-American workers amongst themselves.
The VP also admitted that racist graffiti was indeed found in the Fremont Factory’s bathrooms, which were, in turn, removed by janitorial staff. Workman added that Diaz had filed written complaints to his non-Tesla supervisors, which resulted in Tesla stepping in to address the reported issues. Two contractors were terminated and one was suspended as a result of the former contract worker’s complaints. Diaz had reportedly noted that he was “very satisfied” with the results of the investigations.
Ultimately, Workman stated that Tesla today is not the same as the Tesla that Diaz worked with back in 2015 and 2016. She also remarked that the company has rolled out a number of inclusivity programs designed to ensure that incidents such as those experienced by the former contract worker would not happen anymore. These include a set of new behavior and language policies that the company posted back in July, which explains how derogatory words — including those used among friends of the same race or gender — would no longer be allowed in Tesla.
“While we strongly believe that these facts don’t justify the verdict reached by the jury in San Francisco, we do recognize that in 2015 and 2016 we were not perfect. We’re still not perfect. But we have come a long way from 5 years ago. We continue to grow and improve in how we address employee concerns. Occasionally, we’ll get it wrong, and when that happens we should be held accountable.
“The Tesla of 2015 and 2016 (when Mr. Diaz worked in the Fremont factory) is not the same as the Tesla of today. Since then, Tesla has added an Employee Relations team, dedicated to investigating employee complaints. Tesla has added a Diversity, Equity & Inclusion team dedicated to ensuring that employees have the equal opportunity to excel at Tesla. And Tesla now has a comprehensive Employee Handbook (replacing the Anti-Handbook Handbook) where all of our HR policies, employee protections, and ways to report issues are published in one easy-to-find online document,” Workman wrote.
Tesla’s full statement on the $137 million jury order could be accessed here.
Don’t hesitate to contact us with news tips. Just send a message to tips@teslarati.com to give us a heads up.
Investor's Corner
Tesla unfolded its first European “folding Supercharger”
Tesla’s folding Supercharger just arrived in Europe and it changes how fast charging expands.
Tesla’s Folding Unit Supercharger has officially landed in Europe, with the company teasing a new installation in its effort for a broader rollout targeting major motorway rest stops across the European continent in Q3 2026. The arrival marks a notable shift in how Tesla is thinking about network expansion, moving from hardware performance alone to engineering the logistics chain itself.
While Tesla did not reveal the exact location for the new folding Supercharger in Europe, the photo shared on X heavily suggests that this maybe somewhere in Norway. Historically, whenever Tesla rolls out an entirely new infrastructure architecture in Europe, whether it was the original Supercharger stalls years ago or these brand-new modular V4 “Folding Units”, Norway is almost always the designated launch pad because of its unmatched EV adoption rate and supportive infrastructure
The Folding Unit, introduced in March 2026, is a factory pre-assembled V4 charging station built on an industrial hinge system mounted to a heavy-duty concrete base. The entire assembly arrives on site ready to unfold and connect. Tesla confirmed the units feature telescopic light poles specifically designed for easy transportation and fast on-site deployment, a detail that signals how carefully the logistics chain has been engineered alongside the hardware itself. The design allows 33% more stalls per delivery truck, cuts installation time roughly in half, and reduces overall deployment costs by more than 20% compared to traditional installations.
Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet
Tesla also noted telescopic light poles which provide benefits over traditional Supercharger installations that require fixed-height poles that are awkward to ship, slow to position on site, and often require separate crews and equipment to erect before charging hardware can even be staged. By engineering poles that compress for transit and extend on arrival, Tesla has removed one of the quieter bottlenecks in the physical deployment process. Every hour saved on a light pole installation is an hour redirected toward getting stalls energized. At scale, across dozens of new sites per quarter, those hours add up to a meaningful acceleration in how quickly a location goes from approved permit to serving its first customer.
Each Folding Unit pairs a single V4 power cabinet with eight charging posts. The V4 cabinet delivers up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, supporting twice the stalls per cabinet at three times the power density of its predecessor. Longer cables make every new station immediately usable by non-Tesla vehicles, a priority as Tesla continues opening its network to Ford, GM, Rivian, Hyundai, Stellantis, and others.
As Teslarati reported when the Folding Unit was first unveiled, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet in March 2026 after more than seven years and 15,000 units, completing a full pivot to V4 production. The European arrival of the folding design is the next chapter in that transition.
Faster and cheaper deployment means Tesla can justify building in markets and corridors that were previously too expensive to serve, filling the coverage gaps that have slowed EV adoption outside major urban centers.
First Folding Unit Superchargers in Europe 🇪🇺 https://t.co/KNfYWJukkL pic.twitter.com/YR1udIpH1i
— Tesla Charging (@TeslaCharging) June 10, 2026
News
Tesla stuns with another FSD approval in Europe, its second in two days
Tesla has stunned by gaining yet another approval for its Full Self-Driving suite in Europe, its second in two days and its fifth overall.
Belgium will be the latest country to allow Tesla owners to utilize FSD on public roads in Europe, joining a quickly growing list that started with the Netherlands, Lithuania, and Estonia.
On Tuesday, Denmark announced its approval of the FSD suite, which has now been followed by Belgium just one day later.
The country’s Minister of Mobility, Annick De Ridder, announced the approval on her X account, stating that she had just signed the approval of Tesla FSD. It now goes to the country’s homologation department for the last step of the approval process.
De @Tesla community houdt hier al geruime tijd de vinger aan de pols over de toelating voor de FSD-technologie op onze Vlaamse en Belgische wegen.
Uit waardering voor jullie niet-aflatende interesse (en aanmoediging 😉), krijgen jullie hierbij de primeur: ik heb net de toelating… pic.twitter.com/Yrps4OHTj8— Annick De Ridder (@AnnickDeRidder) June 10, 2026
The Belgian approval is one of mighty importance because it truly shows how quickly countries in Europe could greenlight the FSD suite consecutively. Approvals are already coming in relatively quickly, which is a great sign.
Perhaps the next big development that could come from FSD approvals in Europe is an approval from a country like England, Italy, France, Spain, or Germany. It would be something to see how FSD would perform in a major European metro, such as London, Barcelona, Madrid, Paris, Rome, or Berlin.
Getting Full Self-Driving in Spain and England will be such huge milestones for Tesla. I am so excited to see how FSD performs in Madrid, Barcelona, and London, specifically.
The ultimate test will always be Mumbai or New Delhi. Excited for India’s eventual approval! https://t.co/paw9Ch1qmL pic.twitter.com/9RdDERVSSJ
— TESLARATI (@Teslarati) June 9, 2026
Full Self-Driving does an excellent job of roaming around major U.S. cities like New York and Los Angeles, but other high-profile international cities of significance would truly mark a line in the sand for Tesla, which can simply enable any vehicle in its customer-owned fleet to run FSD with the correct approvals.
Elon Musk
SpaceX’s Elon Musk relieves worries about orbital data centers
SpaceX CEO Elon Musk recently confronted worries about orbital data centers and launching satellites in mass quantities in space, as some voiced concerns about crowding.
Musk’s SpaceX plans to combat the issue of needing data centers by launching them into space instead of taking up valuable real estate on Earth. It has been a major point of SpaceX’s future, including its looming IPO, which could be the largest ever.
In a recent interview filmed at SpaceX’s Starlink terminal factory in Bastrop, Texas, Elon Musk directly addressed concerns that deploying large numbers of AI satellites for orbital data centers could crowd Earth’s orbit. His message was straightforward and reassuring: space is vast beyond human intuition.
“Space is really big,” Musk said. “It’s not like space is gonna get crowded. Space is enormous. If you actually look at it relative to the Earth, the satellites are so tiny you can’t even see them.” He emphasized that even zooming in makes a satellite appear large, but from a planetary perspective, they are minuscule specks.
Elon on concerns that AI satellites will crowd space:
“Space is really big. It’s not like space is gonna get crowded. Space is enormous. If you actually look at it relative to the earth, the satellites are so tiny you can’t even see them.” https://t.co/Mvr7NpL25Q pic.twitter.com/5Fi629Rii7
— Sawyer Merritt (@SawyerMerritt) June 8, 2026
Musk pointed to SpaceX’s real-world experience operating roughly 10,000 Starlink satellites as evidence that large constellations can be managed safely. “We’ve got a pretty good idea of how to operate just really large constellations and do it safely,” he noted. SpaceX remains the only operator with meaningful experience at this scale, giving the company unique insight into tight orbital packing without compromising safety
The discussion highlighted SpaceX’s plans for “AI1” satellites—essentially orbiting racks of AI compute powered by massive solar arrays and cooled via radiative panels in space’s vacuum.
These satellites leverage proven Starlink V3 technology, making them simpler to design than communications satellites. A first-generation unit targets around 150 kW peak power, with a 70-meter wingspan for solar panels and radiators. Laser links will connect them to each other and the Starlink network, delivering low-latency access (on the order of a few milliseconds from low-Earth orbit).
FCC accepts SpaceX filing for 1 million orbital data center plan
Musk framed orbital data centers as a practical solution to Earth’s constraints on AI growth. Ground-based facilities face power shortages, water demands for cooling, and grid limitations. In space, constant sunlight (no day-night cycle), vacuum radiative cooling, and abundant solar energy offer clear advantages.
Production will ramp up at an expanded “Gigasat” factory in Bastrop, with solar manufacturing already underway and full AI satellite output expected at reasonable volume by the end of 2027. Starship’s rapid, high-volume launch capability, aiming for multiple flights per hour, will make massive deployment feasible.
Critics sometimes raise risks like space debris or Kessler syndrome, but Musk’s response underscores scale: even a million satellites would represent an imperceptible fraction of available orbital volume when viewed against Earth’s size. SpaceX’s automated collision avoidance and deorbiting designs for Starlink further mitigate concerns.
This vision ties into broader ambitions. Musk sees orbital AI compute as a step toward harnessing more of the Sun’s energy, advancing humanity on the Kardashev scale from a Type 0 civilization toward Type 1 and eventually Type 2. By moving power-hungry data centers off-planet, SpaceX aims to unlock orders-of-magnitude more compute while preserving Earth’s resources.
Musk’s comments should ease public anxiety. With proven operational expertise, incremental engineering, and the immensity of space itself, orbital data centers represent not overcrowding, but smart expansion into the final frontier.