Connect with us
2022_Ford_F-150_Lightning,_NYIAS_2022 2022_Ford_F-150_Lightning,_NYIAS_2022

News

Ford F-150 Lightning wins MotorTrend’s 2023 Pickup Truck of the Year award

Kevauto, CC BY-SA 4.0 , via Wikimedia Commons

Published

on

It seems that Ford truly did something special when it created the F-150 Lightning. Since its release, the all-electric pickup truck has garnered rave reviews from both consumers and professional reviewers alike. And now, the Lightning has earned a notable award — it has officially become MotorTrend‘s 2023 Truck of the Year. 

As noted by the veteran automaker in a post on Twitter, the Lightning’s win stands as another accolade for the F-150 series. “The Ford F-150 Lightning truck has won the 2023 MotorTrend Truck of the Year (MTTOTY) honor, making it the sixth #MTTOTY award for F-150. The future’s looking bright indeed,” Ford wrote. 

This is a significant achievement, as the F-150 Lightning is the first electric truck to win by unanimous vote among the judges and only the second electric vehicle to achieve a unanimous win in the history of MotorTrend‘s “Of The Year” competitions. 

Darren Palmer, vice president of Ford’s electric vehicle programs, shared his enthusiasm for the Lightning’s new accomplishment. “It’s really brilliant for the team that Lightning is the first EV truck to win by unanimous vote. This truck is full of firsts, and this one is really special to add to Lightning’s historic launch,” Palmer said. 

While the F-150 Lightning is still being ramped, it is among the first entries into the emerging all-electric pickup truck segment — and it shows. The Ford F-150 Lightning was America’s best-selling electric truck for November, with sales totaling 2,062. Since its introduction in May, the F-150 Lightning has also sold a total of 13,258 units. The success of the F-150 Lightning has contributed to Ford becoming the second-best-selling EV brand in the US year to date, behind industry leader Tesla.

Ed Loh, MotorTrend group head of editorial, praised the F-150 Lightning in a statement. 

Advertisement
-

“The F-150 Lightning and its nearly instant torque with ride and handling make it without a doubt the best truck Ford has ever made. If that feels like a bold statement, consider that amongst our judges, the F-150 Lightning won Truck of the Year by unanimous decision–the first EV truck to convince all judges across the board. The Ford F-150 Lightning is no less than a milestone achievement in the history of American mobility,” Loh said. 

As noted by Ford in a press release, the company plans to ramp up production to deliver 150,000 Lightning trucks per year by the end of 2022. Ford’s electric vehicle business is expanding rapidly as well, with a conquest rate of over 60%.

Watch MotorTrend‘s feature on its 2023 Truck of the Year in the video below.

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Elon Musk’s Boring Company lands a new Middle East deal, and Nashville is about to get faster

The Boring Company signs Abu Dhabi tunnel agreement while adding more Prufrock machines in Nashville.

Published

on

By

the-boring-company-tesla-robotaxi

The Boring Company has signed an agreement with Abu Dhabi to study underground transport and utility tunnels across the emirate, adding a second UAE city to its pipeline as it prepares to also scale up tunneling back home in Nashville.

The deal was signed Thursday at the Liveability and Investment Exhibition (LIVEX 2026) by Boring Company President Steve Davis and Maysarah Mahmoud Salim Eid, director general of the Abu Dhabi Projects and Infrastructure Centre (ADPIC), according to the Abu Dhabi Media Office. Mohamed Ali Al Shorafa, chairman of the emirate’s Department of Municipalities and Transport, attended the signing.

Under the agreement, the two sides will assess feasibility, delivery and operating models for tunnels that could carry passengers or utilities. They will also look at Abu Dhabi’s potential as a regional hub for tunneling work. The current phase is exploratory, and no construction commitment or project budget has been announced.

“Abu Dhabi provides an ideal environment to explore the next generation of underground infrastructure solutions, supported by its ambitious growth vision and strong commitment to advanced technologies,”

Davis said. He added that the company wants to assess how tunnels can “expand urban capacity more efficiently, and enable better use of available space.”

The timing lines up with the money, considering last month, The Boring Company closed a $3 billion Series D led by the UAE and affiliated investors, valuing the company at $23 billion, as Teslarati reported. That round came with a commitment to build more than 150 kilometers of tunnel across the UAE, separate from the Dubai Loop pilot already under contract with Dubai’s Roads and Transport Authority. That pilot covers 6.4 kilometers and four stations linking DIFC and Dubai Mall at a cost of about $154 million.

Back home, The Boring Company projects in Nashville are also scaling up, with the company telling local NewsChannel 5 that a third Prufrock machine could start digging the Music City Loop in late October. A fourth is also targeted before the end of the year. Two machines are already mining Nashville limestone at the same time, and work is underway on a new launch site for the third.

The company said it has made more than 300 design and performance upgrades to its original Nashville machine. It is also working with property owners on more than 40 planned stations, with approvals in place for a future Nashville International Airport connection, a downtown station near the Music City Center, and stops at residential towers and the JW Marriott.

Construction on the Music City Loop began the same evening Tennessee and federal regulators approved the project’s lease in February, and the company targeted its first operational segment for late 2026. Back in Las Vegas, The Boring Company has said it plans to double its Vegas Loop station count by year’s end.

Continue Reading

News

SpaceX brings four astronauts home after 8 months in space, and the return was flawless

SpaceX Crew Dragon Freedom returned four Crew-12 astronauts home after 237 days aboard the station.

Published

on

By

SpaceX's Crew Dragon Freedom sits aboard the recovery ship Shannon after splashing down off the coast of Los Angeles with the Crew-12 astronauts on October 8, 2026. (Credit: SpaceX)
SpaceX's Crew Dragon Freedom sits aboard the recovery ship Shannon after splashing down off the coast of Los Angeles with the Crew-12 astronauts on October 8, 2026. (Credit: SpaceX)

Four Crew-12 members are back on Earth after 237 days at the International Space Station. SpaceX’s Crew Dragon Freedom splashed down in the Pacific Ocean about 50 miles west of Los Angeles at 11:34 a.m. ET on Thursday.

NASA astronauts Jessica Meir and Jack Hathaway, ESA astronaut Sophie Adenot, and Roscosmos cosmonaut Andrey Fedyaev landed one day after undocking from the station’s Harmony module at 8:05 a.m. ET on Wednesday. NASA confirmed the splashdown minutes later. SpaceX had flagged the 27.5 hour trip home on X while Dragon was still firing its departure burns away from the station.

The descent ran on schedule when Freedom started a nine minute deorbit burn at 10:46 a.m. ET, then hit the thicker atmosphere about 36 minutes later at nearly five miles per second. Chutes deployed at around 18,000 feet, and four main parachutes brought the capsule down to roughly 15 mph at splashdown.

SpaceX fast boats secured Dragon before the recovery ship Shannon hoisted it onto the deck with the crew still inside. Flight surgeons on board ran initial medical checks. All four crew members will be flown ashore by helicopter and then head to NASA’s Johnson Space Center in Houston for rehabilitation.

Crew-12 launched on February 13 from Space Launch Complex 40 at Cape Canaveral, a flight that also marked the first Falcon 9 booster landing at SpaceX’s new LZ-40 pad. Over the mission, the crew completed 3,792 orbits, covered nearly 101 million miles, and carried out four spacewalks to maintain and upgrade the station.

Meir now has 440 cumulative days in space, which places her in NASA’s top 10. This was the first spaceflight for Hathaway and for Adenot, a French Air Force colonel and former helicopter pilot. Fedyaev, who spent 186 days in orbit on Crew-6 in 2023, has now flown two long duration Dragon missions.

The return closes out a busy stretch of Dragon traffic. Crew-13 arrived on October 1 aboard Crew Dragon Grace, which docked just 7 hours and 55 minutes after liftoff, the fastest launch to docking of any U.S. spacecraft in ISS history. Commander Jessica Watkins, pilot Luke Delaney, Canadian Space Agency astronaut Joshua Kutryk, and cosmonaut Sergey Teteryatnikov remain aboard alongside the three person Soyuz MS-29 crew.

With Crew-12 gone, the port is clear for CRS-35, a cargo Dragon carrying the final pair of ISS Roll-Out Solar Arrays. NASA is holding a post-splashdown teleconference at 1:15 p.m. ET covering both the crew’s return and the upcoming cargo launch.

Continue Reading

Elon Musk

Elon Musk shuts down talk of TSMC taking over Terafab

Musk says Tesla and SpaceX will build and run Terafab, with TSMC limited to renting.

Published

on

By

SpaceX Terafab rendering

Elon Musk has drawn a firm line around who will be in charge of Terafab, the giant chip factory Tesla and SpaceX are planning in Texas.

Musk replied to a post on X arguing that Taiwan Semiconductor Manufacturing Company (TSMC) would most likely end up owning and operating the plant. “No, we will build and run the fab. Let there be ZERO doubt about that,” Musk wrote. “Maybe TSMC subleases part of the Terafab if they want, but nothing more than that.”

In plain terms, a sublease means TSMC could rent a section of the complex to make chips, similar to a tenant renting one floor of an office tower. The building, the equipment decisions and the daily operation would stay with Tesla and SpaceX.

The comment shuts down speculation that started last week. On October 2, tech journalist Tim Culpan reported that TSMC was exploring ways to help run Terafab’s factories. Musk responded the next day that it was “just discussions, but something may come of it,” as Teslarati reported at the time. That left room for a scenario where the world’s largest contract chipmaker took the wheel. Musk’s latest post closes that door.

Elon Musk teases TSMC as potential Terafab partner

Some background helps explain why this matters. Tesla designs its own AI chips today but pays outside companies like TSMC and Samsung to manufacture them. Musk unveiled Terafab in March as a joint project between Tesla, SpaceX and xAI, arguing that existing suppliers cannot expand fast enough to meet his companies’ future demand. The goal is to produce enough chips each year to supply one terawatt of computing power, roughly 50 times what the entire global AI chip industry produces now.

Those chips are meant for Tesla’s Optimus humanoid robots, the Cybercab and Full Self-Driving computers, along with chips for SpaceX’s planned data centers in orbit. Owning the factory means Musk’s companies would not have to compete with every other chip customer for time on someone else’s production lines.

Intel is still part of the picture. The company signed on in April to help design, build and package chips for the project, and CEO Lip-Bu Tan told Bloomberg this week that Intel will keep working on Terafab despite the TSMC chatter.

The project moved from concept to construction planning over the summer. In August, SpaceX confirmed the Grimes County site about an hour from Houston, sent the county a $10 million payment under its tax abatement deal and said civil work would begin shortly. The first phase carries a $16.8 billion price tag, and total spending across all phases could reach as much as $119 billion.

TSMC chairman C.C. Wei has said a new fab typically takes two to three years to build and another one to two years to reach full output. Tesla and SpaceX have never run one, which is why TSMC’s expertise drew so much attention. Musk’s answer suggests he would rather learn that process in house than hand control of a project this central to Tesla’s robotics and autonomy plans to an outside company.

Continue Reading