News
Elon Musk to unveil Neuralink progress with real-time neuron demonstration this week
Elon Musk’s brain-machine interface company, Neuralink, has an event scheduled for later this week to update the public on its progress since last year’s presentation. While the agenda is speculative for the most part, one expectation is a live demonstration of neuron activity.
“Will show neurons firing in real-time on August 28th. The matrix in the matrix,” Musk tweeted at the end of July.
He also revealed a few other clues about the early fall announcement at the beginning of the year. “Wait until you see the next version vs what was presented last year. It’s *awesome*,” he wrote in February. “The profound impact of high bandwidth, high precision neural interfaces is underappreciated. Neuralink may have this in a human as soon as this year. Just needs to be unequivocally better than Utah Array, which is already in some humans & has severe drawbacks.”
As its name implies, the roles of neuron activities are very important to Neuralink’s technology. The venture’s long-term goal of obtaining human symbiosis with artificial intelligence (AI) begins by connecting electrodes throughout the brain and reading its neuron signals en masse. Gathering huge amounts of data from the signals gradually teaches Neuralink’s software how they are used by the brain to communicate with the rest of the body, ultimately leading to a certain amount of replication and direction. The possibilities of such a capability seem endless.

Musk has hinted at some of the health-focused capabilities Neuralink’s technology could develop, specifically in individuals who are neurologically compromised. Installation of a chip replacing a small portion of the human skull, for instance, could restore limb function, improve human movement, resolve issues with eyesight and hearing, and help with diseases like Parkinson’s. There is also the possibility that the implementation of a Neuralink device into a brain could pave the way for hindering brain issues like epilepsy, Alzheimer’s disease, and strokes.
One of Neuralink’s inventions already revealed is a surgical robot for inserting electrodes into the brain. The devices are connected by flexible “threads” measuring between 4 and 6 μm or, about 1/3 the diameter of human hair, capable of transferring high volumes of data from the brain. The design has been tested on at least 19 different animals with robots with around an 87% success rate, according to the venture’s presentation last year. Human trials are possibly on the schedule for 2020, and this aspect may be part of Friday’s update.
Neuralink released a white paper in 2019 and currently has four published patent applications, all which expand on the particulars of the technology already revealed.
While the medical possibilities of Neuralink’s work are incredible on their own, Musk’s involvement was initiated by a desire to help humans keep up with AI. “I don’t love the idea of being [a computer’s] house cat, but what’s the solution? I think one of the solutions that seems maybe the best is to add an AI layer,” he half-joked at Code Conference 2016. Hopefully, the next presentation will provide some insight about Neuralink’s progress in that direction as well, even if it’s still purely hypothetical.
The Neuralink update event will be held August 28th and is expected to have a live stream.
News
Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline
Tesla unveiled a juicy new detail on the Roadster, its long-delayed supercar project, and additionally hinted at a new unveiling timeline, as it appears yet another month will pass without seeing the capabilities of the vehicle.
Vice President of Vehicle Engineering at Tesla, Lars Moravy, revealed on the Ride the Lightning podcast that the Roadster will be built at Gigafactory Texas, adding that “you’ll start to see a lot of things unfold in the next months.”
While we get a good detail on the plant of manufacture, we also get another letdown, as it appears the unveiling event will not take place in May, as CEO Elon Musk hinted during the Earnings Call.
Franz von Holzhausen revealed in the Ride the Lightning podcast that the Tesla Roadster will be built at Gigafactory Texas https://t.co/t9Bu9k824Q pic.twitter.com/TT01IWJaFD
— TESLARATI (@Teslarati) May 24, 2026
The Roadster was first unveiled back in 2017, alongside the Semi, which entered production earlier this year. It was Tesla’s attempt at a true supercar; it would be rare, expensive, and lightning quick, among other incredible capabilities, like potentially hovering for a short period thanks to a collaboration project with SpaceX.
However, the vehicle was set to be delivered in 2020. Parts and supply chain issues due to the COVID-19 pandemic started these delays, and since then, Tesla, and specifically Musk, have wanted to push the capabilities of the Roadster to somewhere the human mind may not be able to currently comprehend.
Both Chief Designer Franz von Holzhausen and Moravy have said many things about the Roadster over the past few years, hinting that the car truly could be worth the wait. However, the continuous delays we’ve seen have undoubtedly been discouraging.
With that being said, it’s not like Tesla has been doing nothing. Instead, the company has been focusing on revamping current models, phasing out others, and working on developing the cars of the future, specifically, the Cybercab, which entered production at Giga Texas in April.
Despite the Roadster’s delays, there is still a ton of anticipation for the vehicle to be released. It will have a steering wheel, as Musk said it will be “the best of the last of the human-driven cars.”
Elon Musk
NASA just gave SpaceX more crew missions because Boeing can’t certify
NASA has filed a procurement notice announcing its intent to add six post-certification missions to SpaceX’s existing Commercial Crew Transportation Capability contract. The agency said it would order up to three of those missions immediately upon adding them to the contract, with the remaining three available as needed through the end of the International Space Station’s planned operations in 2030.
The reason for the expansion is straightforward. NASA cited recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, and the ongoing technical challenges of maintaining a reliable crew transportation capability as the driving factors behind the decision. Boeing’s CST-100 Starliner has still not been certified for crewed flights, and a cargo-only Starliner mission was not included on NASA’s most recent mission manifest. With Boeing effectively sidelined for the foreseeable future, SpaceX is the only American company capable of rotating crews to the station.
The history behind this contract tells the fuller story of how SpaceX got here. NASA originally awarded SpaceX its Commercial Crew contract in 2014 for $2.6 billion. In 2022 NASA modified the contract to add five missions covering Crew-10 through Crew-14, worth $1.436 billion, bringing the total contract value at that point to $4.9 billion. The recent May 18 filing by NASA extends that runway further, with Crew-12 currently docked at the station and Crew-13 assigned and targeting a mid-September 2026 launch.
According to a report by SpaceNews, NASA stated in its filing: “It is necessary to award additional PCMs to SpaceX given the recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, NASA’s projections for when an alternative crew transportation system may become available, and the ongoing technical challenges of maintaining a reliable capability for crewed flights to ISS.”
No dollar value for the new six missions has been publicly confirmed yet, but based on the 2022 precedent of roughly $287 million per mission, the new block could represent close to $1.7 billion in additional contract value. With SpaceX simultaneously preparing Starship as NASA’s Artemis lunar lander, filing its S-1 for a June IPO, and now absorbing more ISS crew rotation work, the company’s role as the primary contractor for American human spaceflight is no longer a matter of circumstance. It is NASA policy.
Energy
Zuckerberg’s Meta taps Musk’s Tesla for massive clean energy project
In a notable intersection of Big Tech powerhouses, Meta, led by Mark Zuckerberg, has partnered with Canadian energy infrastructure giant Enbridge on a significant renewable energy initiative that will rely on battery technology from Elon Musk’s Tesla.
The project, which was announced this week, marks another step in Meta’s aggressive push to power its expanding data center operations with clean energy, dispelling many of the complaints people have about them.
This new development is located near Cheyenne, Wyoming, and will feature a 365-megawatt (MW) solar farm paired with a 200 MW/1,600 megawatt-hour (MWh) battery energy storage system, also known as BESS. Tesla is providing the batteries for the project, valued at roughly $200 million.
The story was originally reported by Utility Dive.
This Wyoming project represents the first phase of Enbridge and Meta’s joint “Cowboy Project.” Once operational, it will deliver power to Meta’s regional data centers through Cheyenne Light, Fuel, and Power under Wyoming’s Large Power Contract Service tariff.
This tariff, originally developed in collaboration with Microsoft and Black Hills Energy, is designed specifically for large loads like data centers. It ensures that the renewable supply serves hyperscale customers without impacting retail electricity rates for other users.
The battery system will operate under a long-term tolling agreement, providing dispatchable capacity that enhances grid reliability. During periods of high demand, the utility can access the backup generation, addressing one of the key challenges of integrating large-scale renewables with the explosive growth of data center electricity demand driven by artificial intelligence.
This latest collaboration builds on prior joint efforts between Enbridge and Meta in Texas, including the 600 MW Clear Fork Solar, 152 MW Easter Wind, and 300 MW Cone Wind projects. Together with the Wyoming initiative, the companies have now partnered on roughly 1.6 gigawatts (GW) of combined solar, wind, and storage capacity.
The deal highlights the intensifying demand for reliable, low-carbon power from technology giants. Meta has committed to supporting its data center growth with renewable energy, joining peers like Microsoft and Google in seeking large-scale solutions. Enbridge’s Allen Capps described the project as “one of the larger utility-scale battery installations supporting U.S. data center operations and growth.”
The involvement of Tesla’s battery technology adds an intriguing layer, linking two of the world’s most prominent tech leaders—Zuckerberg and Musk—in the clean energy transition.
As data centers continue to drive unprecedented electricity load growth across the United States, projects like this one illustrate how hyperscalers are turning to strategic partnerships with traditional energy players and innovative storage solutions to meet both sustainability goals and reliability needs.