Connect with us

News

Hyundai’s Georgia EV plant clears environmental review of its water usage

The Army Corps says Hyundai’s plant poses “insignificant” water risks despite using 6.6M gallons/day. Ogeechee Riverkeeper remains cautious.

Published

on

Hyundai-georgia-ev-plant-water-enviromental-review
(Credit: Hyundai)

Hyundai’s $7.6Belectric vehicle (EV) plant in Georgia cleared an environmental review concerning its water usage.

In August, the U.S. regulator, The Army Corps of Engineers, agreed to revisit Hyundai Motor Group Megaplant America’s (HMGMA) permit standards regarding water usage after a conservation group threatened to sue. Last August, the Ogeechee Riverkeeper group pushed back against Hyundai’s permit, citing risks to the region’s drinking water from the plant’s 6.6 million daily gallons usage.

After reviewing Hyundai’s water usage for months, the U.S. regulator concluded that HMGMA’s permit required no changes.

The Corps’ memo stated: “The impacts on the environment as a result of this permit have been evaluated and found to be insignificant.” It noted a “long-term minor effect” on water supply, a shift from 2022’s “negligible” label.

Ogeechee’s legal director, Ben Kirsch, responded to the agency’s findings. “We do not yet know what, if any, ramifications will come from that,” adding, “Until we review that decision document, we cannot offer substantive comments, but we continue to monitor actions around this permit closely,” Kirsch said.

Advertisement
-

Hyundai’s Georgia plant has also hit wastewater issues since it started operations. The City of Savannah issued a permit to accept HMGMA’s wastewater on August 30, 2024. However, the city’s water treatment facility stopped taking the EV plant’s wastewater by September 2024.

The city noted the wastewater was “affecting biological processes” and did not stop taking the Hyundai factory’s wastewater due to Hurricane Helene. Hyundai received a Notice of Violation in October, with the City of Savannah working with Georgia’s EPD and Bryan County to resolve the issue.

The clearance keeps Hyundai’s Georgia plant on track. Despite HMGMA’s water usage issues and wastewater hiccups, the Army Corps ruling signals confidence in the project’s environmental footprint, though local oversight persists amid water supply concerns.

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

Elon Musk

SpaceX turned a heralding moment for Starship into its greatest moment

Starship reached orbit despite losing an engine, deployed 26 Starlink V3 satellites on Flight 14.

Published

on

By

SpaceX’s Starship reached orbit for the first time on Monday, and for a few nail-biting minutes it looked like it wouldn’t. During ascent on Flight 14, one of Ship 41’s six Raptor engines shut down early, and SpaceX’s livestream host Dan Huot told viewers the team had decided not to commit to orbit. Minutes later, after what Huot described as a lot of conversation in the control room, the final poll came back in favor, and a roughly 19 second burn of a single Raptor pushed the ship into orbit about 170 miles up.

The reversal matters because SpaceX had written the exit ramp into the mission plan. The company said it would only fire the orbital insertion burn if flight controllers confirmed enough backup hardware remained for the deorbit burn, a condition Teslarati laid out ahead of the flight. Losing an engine was exactly the scenario that rule was built for.

Pressing forward fits Elon Musk’s history. Falcon 1 failed three straight times before its fourth launch reached orbit in 2008, with SpaceX nearly out of money, and Starship was developed by flying prototypes until they broke. What changed this year SpaceX going public, and with $SPCX sliding below its IPO price in July when Flight 13 slipped, the short interest climbed significantly, as Teslarati reported at the time. A Starship potentially lost today with revenue generating next-gen Starlink satellites aboard would have landed directly on shareholders.

That pressure showed up after orbit. SpaceX cut a flight planned to last nearly 10 hours to about three, moving splashdown from west of Chile to the North Pacific near Hawaii. SpaceX gave no reason, though Musk said this month the company was being extremely cautious about debris risk. The single Raptor for deorbit worked, and Ship 41 completed its flip and landing burn before breaking apart in the water, an outcome SpaceX expected. Musk has structured SpaceX’s governance to shield long term bets from market pressure.

The payload is the bigger business story. Musk posted that all 26 Starlink V3 satellites deployed and are “operating nominally.” Each V3 is rated for about 1 Tbps of downlink and 160 Gbps of uplink, so this single launch adds roughly 26 Tbps, about 10 times what a Falcon 9 load of V2 Mini satellites adds. The V3 is too large for Falcon 9, making Starship the only vehicle that can build out the planned 100,000 satellite constellation, at up to 60 per flight once it reaches routine service. Unlike the 20 V3 units on Flight 13, which reentered on a suborbital path, these will raise their orbits and could begin serving customers within weeks and bring in hundreds of millions of additional dollars in projected Starlink revenue.

SpaceX has already begun winding down Falcon 9 Starlink launches from Florida in favor of Starship. Reported targets put Flight 15 as early as October 19, leaving about three weeks to diagnose Monday’s engine shutdown before the next orbital attempt.

Continue Reading

News

Tesla Cybercab fleet doubles to well over 100 units

Published

on

(Credit: Teslarati)

Tesla quietly doubled the size of its Cybercab fleet within the Robotaxi program in Austin, Texas, over the weekend to well over 100 units.

The move not only establishes more of the steering-wheel-less and pedal-less vehicles within the ride-sharing fleet Tesla has been operating for a year, but it also solidifies a more robust Robotaxi fleet as a whole.

Riders started receiving notifications from the Robotaxi app that stated: “Cybercab fleet has doubled: more rides available.”

Tesla first launched rides in the Cybercab in early September, although the Robotaxi fleet has been active for over a year, as rides began last Summer. Cybercab is truly Tesla’s most crucial vehicle release yet, as it is the first car any company has built that is geared toward full-fledged and end-to-end autonomy, never needing human intervention for anything.

Only available in Austin at the current time, Cybercab has two seats and has been spotted testing around various U.S. states and regions; Tesla plans to deploy the Cybercab in various U.S. cities in the coming months as a best-case scenario.

Tesla Cybercab gets initial tie-in to localized, in-house cathode plant

The availability of the Cybercab has doubled from just 58 units last Monday to 125 the following Friday. Marking a substantial increase in Cybercab availability, the additional ride-sharing units are more than welcome, as wait times for Cybercabs, especially, were quite high.

The dramatic increase is a sign that demand for Robotaxi is growing and Tesla is feeling more confident that its driverless ride-hailing suite, especially its Full Self-Driving software, is able to handle any traffic situation without explicit direction or supervision from a human being.

Continue Reading

News

Tesla has a ‘no human contact’ approach for Semi production

Published

on

Tesla is advancing a fully automated pipeline for the 4680 battery cells used in its all-electric Semi, spanning production from Giga Texas through shipment and direct consumption on the line at the new dedicated Semi Factory in Sparks, Nevada.

The approach was outlined by Tesla at its September 24 Semi Handover event, which launched high-volume production at its new 1.8-million-square-foot plant in Nevada, which sits adjacent to Gigafactory Nevada and is designed for an annual production rate of 50,000 trucks per year.

After years of pilot builds and what was a four-year-long redesign of the truck, Tesla moved the Semi from 2170 batteries to its in-house 4680 cells, which are made in Austin. The change cuts battery mass and total energy while holding range, a key step in making volume production a realistic possibility.

Cells will leave Giga Texas in trailers, and at the Nevada Semi plant, Tesla intends for a dedicated line to unload those trailers automatically, station the cells, and feed them straight into pack and vehicle assembly.

Both Lars Moravy, Tesla’s VP of Vehicle Engineering, and Dan Priestley, the Head of Tesla’s Semi program, described the goal as a “zero human touch point” from the moment the trailer arrives in Texas until a finished Semi drives off the production line in Nevada.

The unloading system that Moravy and Priestley described is just one piece of a much broader automation push. The plant uses what Tesla calls the highest-capacity electric monorail conveyance in vehicle manufacturing, carrying frames-in-white simultaneously. Powder-coating replaces conventional paint, and many processes that would normally require operators have been designed out.

Tesla has repeatedly said that “the best part is no part,” and the cell-handling plan extends that philosophy from the cell factory floor in Texas all the way to final assembly in Nevada.

If executed as described, the closed-loop flow would reduce labor, handling damage, and inventory buffers while tightening quality control on a component that represents a large share of the truck’s cost and weight. It also shortens the physical and organizational distance between two factories separated by more than 1,200 miles. The Semi itself now shares a bar-wound stator and other components with the Cybertruck, further linking Tesla’s passenger and commercial production systems.

High-volume output is expected to ramp gradually after the first trucks left the new line in April 2026. Early customers include PepsiCo, DHL, and U.S. Foods. Whether the automated trailer-to-line process reaches the promised zero-touch standard will be visible in the coming months as production scales. For Tesla, the Semi factory is another test of how far it can push “the machine that builds the machine” across sites.

Continue Reading