Connect with us

News

Lucid Motors, fresh off $LCID listing, opens first southwest U.S. retail store

Credit: Lucid Motors

Published

on

Fresh off of its merger with Churchill Capital IV, which created the $LCID stock listing on NASDAQ, Lucid Motors has announced the opening of its first Southwestern United States showroom in Scottsdale, Arizona.

The Scottsdale location officially opened its doors on Saturday, August 7th, offering a retail store in the same state as its assembly facility in Casa Grande, which is just 50 miles away. The store is positioned in Scottsdale Fashion Square and is the company’s ninth location, adding to the growing network of Lucid Studios. Lucid has opened retail locations in Manhattan, New York, and West Palm Beach, Florida, so far this year.

The location of this Studio, in particular, holds a special significance to Lucid, which plans to deliver its first cars sometime later this year. “Opening our first Studio in Arizona, just one hour from where the Lucid Air will begin rolling off the assembly line in Casa Grande this year, is a special milestone,” said Senior Director of Retail Operation Zak Edson. “This opening reinforces the company’s commitment to the region, and is in direct response to the warm welcome and the high level of interest shown for both our manufacturing operations and the products we are bringing to market.”

Arizona is a hot spot for many EV-related entities. Along with Lucid, KORE Power has pledged to build a massive 1 million-square-foot lithium-ion battery production facility just 40 miles away from Phoenix. Lucid’s Casa Grande plant will produce the company’s first units, along with an expansion that will be completed down the line that will increase annual production capacity to among half a million units when completed. Nikola Motor also has a plant in Coolidge, Arizona, as well as EV startup ElectraMeccanica.

The Lucid showroom won’t be the only thing available to customers. The company also said that it plans to open a Service Center in the area for repairs and maintenance.

Lucid breaks down its new facility into two parts: Studio Experience and Virtual Experience.

Advertisement
-

Lucid Studio Experience

“Every Lucid Studio offers a digitally oriented luxury experience tailored to each customer’s preferences, whether they visit in-person, make inquiries entirely online, or combine the two. Lucid’s Scottsdale Studio allows customers to experience the brand and obtain information about its products in a location that underscores the company’s unique design aesthetic. Exploring a Lucid Studio, visitors will get a vision of how the company draws inspiration from the beauty, innovation, and diversity of its home state of California. Lucid Studios augment the physical experience of seeing and touching a Lucid Air with an elevated digital experience. Using a 4K VR configurator, Lucid’s Virtual Reality Experience combines the physical and virtual worlds to showcase seamless personalization of everything from interior finishes and materials to exterior color.”

Virtual Experience

“Mirroring the luxury one-to-one Studio experience online for those who prefer shopping from home, customers can take advantage of “Lucid Studio Live,” a cloud-based configuration solution powered by ZeroLight’s Concierge product. From the comfort of their own homes, customers can virtually interact with a car while a Lucid representative guides them through key features and configuration options.”

What do you think? Let us know in the comments below, or be sure to email me at joey@teslarati.com or on Twitter @KlenderJoey.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

News

SpaceX hid behind another name in the Arizona desert, and now it’s going big

SpaceX puts a $50 billion price on its Arizona supercompute campus ahead of December’s hearing.

Published

on

By

SpaceX has put a price tag on the supercomputer campus it wants to build in the southern Arizona desert. In a statement Thursday, the company said it is pursuing a roughly $50 billion supercompute campus in Cochise County, about 80 miles east of Tucson. Together with a separate facility planned at Starbase, Texas, the two projects add up to more than $74 billion in planned investment.

The Arizona figure had not been disclosed before. SpaceX’s involvement only became public on November 4, when company representatives hosted a packed town hall at Cochise Elementary School for an application filed under the name Tombstone Resources LLC. A SpaceX representative told residents the filing used another name because putting SpaceX on it “draws attention” from outside the county, local station KVOA reported.

The application describes a 747-acre site near the Willcox Playa with up to nine buildings of about 493,000 square feet each. SpaceX plans to bring the campus online in four phases of roughly 1.5 GW, reaching 6 GW at full build, backed by a 24 GWh battery system and about $3.6 billion in grid upgrades. At that size, it would draw about 2.5 times more power than every data center in Maricopa County combined, according to an Arizona Republic analysis.

SpaceX says the project will create about 5,500 construction jobs and 1,000 permanent jobs, and that it could cut electricity bills for members of the local cooperatives by up to 20 percent. The campus would use dry cooling with no industrial groundwater use. Its application estimates ongoing water needs of 7 to 10 acre-feet a year, roughly what 20 to 30 homes consume.

Power is the bigger question. The site sits next to the Apache Generating Station, a coal and natural gas plant with about 1 GW of capacity that had been slated to retire by 2028. SpaceX told residents its investment could expand the station to more than 6 GW.

Advertisement
-

Local opposition is organized. A petition asking the county to deny the permit has gathered about 2,400 signatures, and the nearby playa is a landing spot for federally protected sandhill cranes, which SpaceX says its design accounts for. The Cochise County Planning and Zoning Commission will hold a public hearing on December 9 in Bisbee, with written comments due November 27. If approved, construction could start in March 2027.

The Texas project faces a vote the same day. The Starbase City Commission will consider a property tax abatement for SpaceX’s $24 billion gas plant and supercompute facility at its own December 9 hearing, as Teslarati reported. SpaceX said Thursday the Starbase site has already generated more than 3,000 construction jobs, and it committed $220 million to Brownsville’s water and wastewater systems, $40 million of which has been paid.

Both campuses would expand a footprint still centered on the Memphis area, where SpaceX’s Colossus data centers run largely on gas turbines and the company won a permit for a power plant in Southaven, Mississippi earlier this year. SpaceX ended the third quarter with 1.7 GW of nameplate compute. The Arizona campus alone, at full build, would be more than three times that size.

Continue Reading

Elon Musk

Nvidia’s board meets on Jensen Huang, and Elon Musk already has an answer

Elon Musk says it would be an honor to hire Jensen Huang amid Nvidia turmoil.

Published

on

By

Elon Musk says he would welcome Jensen Huang at one of his companies if Nvidia’s board decides to push out its longtime chief executive.

On Wednesday evening, the financial account ZeroHedge posted “Elon please hire Jensen” on X. Musk replied roughly two hours later: “That would be an honor.” Neither Huang nor Nvidia had responded publicly as of Wednesday night.

Musk’s reply came as Nvidia’s board met to decide Huang’s future. The Wall Street Journal reported that directors were preparing to oust him following reports of two extramarital relationships. One involves Alice Huang, a Singapore-based businesswoman whom U.S. intelligence officials reportedly believe was working for China’s Ministry of State Security. The New York Times separately reported a relationship with Kimberly Powell, Nvidia’s vice president of health care. Huang acknowledged being unfaithful in a memo to employees on Sunday but gave no details.


Under Nvidia’s bylaws, a majority of its 11 directors can remove the CEO with or without cause. Bloomberg reported that the board has been working with an outside firm on possible replacements and may name an interim chief, with CFO Colette Kress seen as the likely pick. Nvidia shares fell more than 8 percent in extended trading, according to CNBC, and the company is scheduled to report quarterly earnings on November 17.

Musk has more riding on Nvidia’s leadership than most tech executives. In August, he told investors on SpaceX’s first earnings call as a public company that it would build its AI infrastructure exclusively on Nvidia hardware, calling Vera Rubin “the best architecture.” SpaceX is also working with Nvidia on the compute payload for Starmind, its planned orbital AI constellation. In October, SpaceX said it had a binding commitment for a roughly $40 billion lease of Vera Rubin GPUs and related equipment, with the leases expected to begin in the first half of 2027.

The scale of that dependence is already enormous. On its Q3 call, SpaceX said it was bringing roughly 200,000 to 220,000 Nvidia GB300 GPUs online each month and expects 2.5 to 3 GW of nameplate compute by the end of the year. That buildout is now reaching new sites like the proposed $24 billion power plant and supercomputer campus at Starbase.

The relationship between the two executives also goes back nearly a decade. Huang has often told the story of personally delivering Nvidia’s first DGX-1 AI supercomputer to Musk in 2016, when no other customer wanted one. “Nobody wanted to be part of it, except for Elon,” Huang said on the Joe Rogan Experience last December.

Musk did not say what role Huang might fill, and his reply stops short of a formal offer. Huang co-founded Nvidia in 1993 and still owns about 3.6 percent of its stock, so any move to a Musk company would depend on whether, and how, he leaves the chipmaker he has run for more than three decades.

Continue Reading

News

Starlink Mini 2 arrives with one feature for true off-grid connectivity

Published

on

Credit: SpaceX

SpaceX officially launched the Starlink Mini 2 on November 10, delivering the first portable Starlink terminal designed around independent power.

Invitation-only preorders for select U.S. customers are priced at $999 plus tax, a figure that includes a full year of Roam Unlimited service valued at roughly $2,100. A refundable $100 deposit reserves the kit, with the balance due at shipment, expected to begin in mid-December. Broader availability is listed as coming soon.

The headline feature is the quick-swap 71 Wh battery. Clipped to the rear of the dish without tools, it delivers up to 4.5 hours of connectivity on a single charge.

The 490-gram pack includes its own USB-C port and LED indicators, so users can charge a spare separately and swap it in seconds while staying online. Starlink notes that the terminal can continue operating while the battery charges or run directly from a 60 W USB-C source. The retail box includes one battery, a 60 W USB-C charger, and a 3-meter cable.

Beyond power, the Mini 2 is thinner at 23.1 mm (versus 38.5 mm on the original Mini) while measuring 263 × 314 mm. With the battery and kickstand attached it weighs 1.6 kg.

Built-in Wi-Fi 6 expands coverage to up to 1,800 square feet, an IP67 rating protects against dust and water, and a standard 1/4-20 tripod thread plus physical power button round out the design. Field of view remains 110 degrees, and the unit retains support for mobile use.

For travelers, campers, and remote workers, the swappable battery removes the longstanding requirement for an external power bank or vehicle outlet that defined the first Mini. Spare packs sold separately further extend runtime, turning the compact terminal into a more self-contained solution.

While the bundled $999 invitation price sits well above the original Mini’s current $149 starting point, the included year of service and genuine untethered operation mark a clear step forward in portable satellite internet.

Continue Reading