Connect with us

News

Mercedes-Benz draws ire from EV fire victims in South Korea

Published

on

Mercedes-Benz has drawn the ire of the electric vehicle (EV) fire victims in South Korea for providing an “absurdly insufficient” donation to the residents of the complex affected by the blaze. 

Recently, an electric Mercedes-Benz caught on fire in an underground parking lot of an apartment complex in Incheon. The blaze dealt severe damage to over 100 vehicles in the parking garage. A local media report also noted that a few residents sustained minor injuries from the fire. 

The fire caused by the Mercedez-Benz EV took several hours to put out, causing extensive damage and concerns. The South Korean Environment Ministry called an emergency meeting to discuss EV fire safety. The South Korean government is thinking of requiring automakers to disclose their EV battery brands. So far, Hyundai and Kia have released a list of EV battery brands they use to the public. 

Mercedes-Benz Korea offered to donate 4.5 billion won ($3.3 million) to the victims of the apartment complex to support them during recovery. However, many residents argue that the legacy automaker’s donation is insufficient. 

The CEO and President of Mercedes-Benz Korea, Mathias Vaitl, attended a meeting with the apartment complex’s residents affected by the fire. Vaitl arrived at the meeting late, drawing the residents’ ire. Many residents expressed their anger and frustration about the incident during the meeting.

Advertisement

“We have 1,581 household units in our apartment complex. If you do the calculation, each household on average is subject to about 3 million won each from the relief support by Mercedes-Benz,” said one resident.

According to Yonhap News Agency, the residents of the apartment building presented their arguments to Vaitl. One of the residents pointed out that a single Mercedes-Benz EV damaged the livelihoods of 1,581 households. Another person living in the complex stated that the residents have different insurance plans, and a few would only be able to receive a partial reimbursement for their damaged vehicles. 

A few more residents addressed the health concerns they have been facing. Some brought up concerns over secondary effects from the dust caused by the fire. Others mentioned residents suffering from headaches and children experiencing sore throats.

If you have any tips, contact me at maria@teslarati.com or via X @Writer_01001101.

Advertisement

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

News

Tesla seeks approval to test FSD Supervised in new Swedish city

Tesla has applied to conduct local Full Self-Driving (Supervised) testing in the city of Jönköping, Sweden.

Published

on

Credit: Grok Imagine

Tesla has applied to conduct local Full Self-Driving (Supervised) testing in the city of Jönköping, Sweden.

As per local outlet Jönköpings-Posten, Tesla has contacted the municipality with a request to begin FSD (Supervised) tests in the city. The company has already received approval to test its Full Self-Driving (Supervised) software in several Swedish municipalities, as well as on the national road network.

Sofia Bennerstål, Tesla’s Head of Public Policy for Northern Europe, confirmed that an application has been submitted for FSD’s potential tests in Jönköping.

“I can confirm that we have submitted an application, but I cannot say much more about it,” Bennerstål told the news outlet. She also stated that Tesla is “satisfied with the tests” in the region so far.

Advertisement

The planned tests in Jönköping would involve a limited number of Tesla-owned vehicles. Trained Tesla safety drivers would remain behind the wheel and be prepared to intervene if necessary.

Tesla previously began testing in Nacka municipality after receiving local approval. At the time, the company stated that cooperation between authorities, municipalities, and industry enables technological progress and helps integrate future transport systems into real-world traffic conditions, as noted in an Allt Om Elbil report.

If approved, Jönköping would become the latest Swedish municipality to allow local Full Self-Driving (Supervised) testing.

Tesla’s Swedish testing program is part of the company’s efforts to validate its supervised autonomous driving software in everyday traffic environments. Municipal approvals allow Tesla to gather data in urban settings that include roundabouts, complex intersections, and mixed traffic conditions.

Advertisement

Sweden has become an increasingly active testing ground for Tesla’s driver-assistance software in Europe, with regulatory coordination between local authorities and national agencies enabling structured pilot programs.

Continue Reading

Elon Musk

Microsoft partners with Starlink to expand rural internet access worldwide

The update was shared ahead of Mobile World Congress.

Published

on

Credit: Starlink/X

Microsoft has announced a new collaboration with Starlink as part of its expanding digital access strategy, following the company’s claim that it has extended internet connectivity coverage to more than 299 million people worldwide.

The update was shared ahead of Mobile World Congress, where Microsoft detailed how it surpassed its original goal of bringing internet access to 250 million people by the end of 2025.

In a blog post, Microsoft confirmed that it is now working with Starlink to expand connectivity in rural and hard-to-reach regions.

“Through our collaboration with Starlink, Microsoft is combining low-Earth orbit satellite connectivity with community-based deployment models and local ecosystem partnerships,” the company wrote.

Advertisement

The partnership is designed to complement Microsoft’s existing work with local internet providers and infrastructure companies across Africa, Latin America, and India, among other areas. Microsoft noted that traditional infrastructure alone cannot meet demand in some regions, making low-Earth orbit satellite connectivity an important addition.

Kenya was cited as an early example. Working with Starlink and local provider Mawingu Networks, Microsoft is supporting connectivity for 450 community hubs in rural and underserved areas. These hubs include farmer cooperatives, aggregation centers, and digital access facilities intended to support agricultural productivity and AI-enabled services.

Microsoft stated that 2.2 billion people globally remain offline, and that connectivity gaps risk widening as AI adoption accelerates.

Starlink’s expanding constellation, now numbering more than 9,700 satellites in orbit, provides near-global coverage, making it one of the few systems capable of delivering broadband to remote regions without relying on terrestrial infrastructure. 

Advertisement

Starlink is expected to grow even more in the coming years as well, especially as SpaceX transitions its fleet to Starship, which is capable of carrying significantly larger payloads compared to its current workhorse, the Falcon 9.

Continue Reading

Elon Musk

Tesla expands US LFP battery supply with LG Energy Solution deal: report

The report was initially published by TheElec, citing industry sources.

Published

on

Credit: Tesla

LG Energy Solution (LGES) will manufacture lithium iron phosphate (LFP) energy storage system (ESS) batteries for Tesla at its Lansing, Michigan facility. 

The report was initially published by TheElec, citing industry sources.

LG Energy Solution’s Lansing plant, formerly known as Ultium Cells 3, was previously operated as a joint venture with General Motors. LGES acquired GM’s stake in May 2025 and now fully owns the site. With a production capacity of 50 GWh per year, it is one of the company’s largest facilities in North America.

LG Energy Solution is converting part of the Lansing factory to produce LFP batteries for energy storage systems. Equipment orders for the new lines have already been placed, and mass production is reportedly expected to begin in the second half of next year.

Advertisement

Last July, LG Energy Solution disclosed a 5.94 trillion won battery supply agreement running from August 2027 to July 2030. While the company did not name the customer, industry sources pointed to Tesla as the buyer.

Tesla has primarily used CATL’s prismatic batteries for its Megapack systems. The move to source prismatic LFP cells from LG Energy Solution’s U.S. plant could then be seen as part of Tesla’s efforts to bolster its North American supply base for its energy storage business.

For the Lansing conversion, LG Energy Solution reportedly plans to use electrode equipment originally ordered under its Ultium Cells venture with General Motors. Suppliers reportedly include CIS and Hirano Tecseed for electrode systems, TSI for mixing equipment, CK Solution for heat exhaust systems, A-Pro for formation equipment, and Shinjin Mtech for assembly kits.

Tesla currently manufactures energy storage products at facilities in California and Shanghai, though another Megafactory that produces the Megapack is also expected to be built in Texas. As per recent reports, the Texas Megafactory recently advanced with a major property sale.

Advertisement
Continue Reading