Connect with us
redwood-materials-europe-expansion redwood-materials-europe-expansion

News

Redwood Materials scopes out EU locations for new battery recycling plant

(Credit: Redwood Materials)

Published

on

JB Straubel’s Redwood Materials has narrowed down the locations for its new battery recycling plant in Europe. Germany and Scandinavia are the top two countries on the company’s list. 

Pros of Redwood Materials Germany

Germany would be a good location for Redwood Materials’ battery recycling plant in Europe. The company has deals with Tesla and Volkswagen already, so a plant in Germany would be ideal. Tesla Giga Berlin might benefit from a Redwood Materials battery plant nearby. Volkswagen also has a car plant in Wolfsburg. 

In July, Redwood Materials signed a partnership agreement with Volkswagen Group of America to recycle batteries from VW and Audi electric vehicles. The battery recycling company might strike another partnership with Volkswagen for its cars in Europe. 

Cons of Redwood Materials Germany

Handelsblatt sources familiar with Redwood Materials’ processes shared that the company is willing to invest around $1 billion toward its new battery recycling plant in Europe. From the company’s perspective, a plant in Germany would be a symbol of power. 

However, Germany has high energy costs that could significantly increase the plant’s electricity costs. According to Trading Economics, Germany’s electricity prices reached an all-time high in August 2022 at €699.44 per MWh ($693.77 per MWh). The ongoing Ukraine-Russian war has contributed to rising electricity prices in Germany. 

“Energy costs are a big issue for many companies willing to invest,” said Stefan Di Bitonto, an automotive expert in Germany Trade and Invest (GTAI).

Recycling battery materials is energy-intensive, so the cost of electricity would be a big factor in Redwood Materials’ final decision. The battery recycling company wants to help reduce electric vehicle prices by localizing the global battery supply chain. To achieve its goal, Redwood Materials needs to build a cost-effective plant, or at least use sustainable solutions like solar and batteries to keep its energy costs optimized. 

Scandinavia vs. Germany

Another factor JB Straubel might consider is the EU plant’s CO2 footprint. From that perspective, countries in Scandinavia, like Norway and Sweden, might be the right choice. Scandinavian countries are leaning more towards renewable power sources, like hydropower or wind. Plus, Norway and Sweden’s electricity prices are less expensive compared to Germany.  

Advertisement
-
-

The Teslarati team would appreciate hearing from you. If you have any tips, contact me at maria@teslarati.com or via Twitter @Writer_01001101.

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

News

Tesla Roadster unveiling nears, and it will fly: The Information

Published

on

(Credit: Dami Kolz/Twitter)

Tesla is nearing its long-awaited unveiling of the all-electric Tesla Roadster, a new report from The Information claims, as the company has said several times this year that the event would take place “soon.”

Now, it appears there is movement on Tesla’s end regarding when it will happen.

The report says that Tesla will unveil the Roadster as soon as this month with a SpaceX version that will utilize cold-gas thrusters to help the vehicle float for a short period of time. This is something CEO Elon Musk has talked about with the Roadster for years.

Additionally, due to the delays, Tesla explored “a variety of designs” for the Roadster, potentially planning to abandon the design it showed off for the first time in 2017 and adopting an entirely new aesthetic.

According to The Information, Tesla considered utilizing a repurposed Model S Plaid and even wanted to upgrade the look to something like a Lamborghini Countach.

Elon Musk teases Tesla Roadster unveiling once again

We’ve heard all of these things before, including teases about the date and how “soon” the Roadster will finally be ready to be shown off to the world (for the second time). Musk said that the event would occur in April, then May, then Chief Designer Franz von Holzhausen continued to say it would be coming “soon.”

We do expect to see the Roadster by the end of the year, and now with this new report swirling, it appears it could be sooner rather than later.

The wait has been incredibly long, but there is likely a good reason for it. Tesla’s desire to make the Roadster the craziest vehicle on the road was non-negotiable, and it likely took a lot of time and resources to develop and perfect into something that was safe and suitable for a vehicle like this.

Continue Reading

Featured

Tesla finally got its Nevada Robotaxi Permit but with a few catches hard to miss

Nevada granted Tesla’s robotaxi permit, but capped the fleet at just ten vehicles for now.

Published

on

By

Concept art of a Tesla Cybercab in Las Vegas Strip as rendered via Grok

Tesla has received its robotaxi permit in Nevada, more than two months after regulators closed the public comment period on the company’s application. News of the approval surfaced Wednesday night when Tesla investor and longtime company watcher Sawyer Merritt posted a copy of the interim order, and the Nevada Transportation Authority’s own carrier registry now lists the permit, AVNC Permit 002 under Docket 26-05015, as active for Tesla Robotaxi, LLC.

Tesla asked Nevada in June for authority to run up to 5,000 vehicles in Clark County within a year, however the permit the NTA issued is initially capping Tesla at ten fully autonomous vehicles and confines them to a defined geofence along the Las Vegas Strip corridor. Any expansion of that operating area, or any increase to the fleet size, requires the NTA’s approval first.

The order also sets rules that look more restrictive than what Tesla runs in Austin. Rides are barred on roads with posted speed limits above 45 miles per hour, pickups are off limits within a quarter mile of Harry Reid International Airport without separate authorization, and every vehicle has to carry visible “Robotaxi” markings while notifying riders before each trip that no one is driving. The order also requires “appropriate human supervision”, language that suggests Nevada isn’t ready to let Tesla offer the rides without a safety monitor that it has run in parts of Austin since January. As with standard protocol with robotaxi services, Tesla must report any accident, system failure, or vehicle that becomes stranded on a Nevada road within five business days.

Tesla is entering a market Nevada already knows well. Zoox, the Amazon owned robotaxi company, has run its own autonomous vehicle permit in the state since last year, building up to roughly 100 vehicles and 350,000 rides along the Strip. That history likely explains why the NTA started Tesla at ten cars rather than the fleet size the company asked for. The agency has a template for scaling a permit up once a company proves out its safety record.

Tesla’s Nevada application first surfaced in June, when the company filed for the permit alongside plans for a maintenance hub in southwest Las Vegas. The company has said it won’t meaningfully scale its robotaxi fleet anywhere until FSD v15 ships, expected in late 2026 or early 2027, which makes the ten vehicle cap less of a constraint today than it might look on paper. For now, Tesla has the legal right to start Nevada rides. Whether it starts before FSD v15 arrives is a separate question the permit doesn’t answer.

Continue Reading

Energy

Tesla launches Powerwall Lease for affordable home backup

Published

on

Credit: Tesla

Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.

Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.

This credit lowers the effective cost to roughly $35 per month plus applicable tax.

Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.

The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.

Tesla announces 100k Powerwalls are participating in Virtual Power Plants

Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.

Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.

The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.

Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.

Continue Reading