Connect with us

News

Tesla China starts customer deliveries of upgraded Model 3 Highland

Credit: Tesla Asia/X

Published

on

The drought of domestic Tesla Model 3 deliveries in China is over. As per a recent announcement from the electric vehicle maker on Chinese social media, customer deliveries of the upgraded Tesla Model 3, better known in EV circles as Project Highland, have begun. 

Tesla China’s announcement on Weibo highlighted some of the new Model 3’s improvements, from its integrated taillights and new “light wing headlights” in the exterior to the RGB ambient lighting and ventilated seats in the interior. Tesla China also highlighted that the updated Model 3 features a new suspension system that should make the vehicle more comfortable. 

The upgraded Model 3 was unveiled in China on September 1. At the time, the vehicle was offered for pre-sales in the country, and it was only until October 19 that formal sales of the new Model 3 were started in China. Despite the vehicle being formally available for ordering, however, the revamped all-electric sedan’s local customer deliveries were still paused. That pause ended today with Tesla’s announcement on Weibo. 

Tesla China currently offers two variants of the upgraded Model 3 — the base Rear Wheel Drive (RWD) variant that starts at RMB 259,900 (about $35,500) and the Dual Motor All Wheel Drive (AWD) variant that starts at RMB 295,900 (about $40,400). Prior to the Highland update, the Model 3 in China started at RMB 231,900 (about $31,700) for the RWD version. A Performance variant was also offered at RMB 331,900 (about $45,300). 

A document released by the China Ministry of Industry and Information Technology revealed some details about the revamped all-electric sedan. These include the new Model 3’s battery pack sizes, which were listed at 60 kWh for the RWD variant and 78.4 kWh for the Dual Motor AWD. Tesla China’s order page for the upgraded Model 3 also lists an estimated delivery date of 6-9 weeks for new orders of the vehicle. 

For now, the upgraded Tesla Model 3 is exclusively produced at Gigafactory Shanghai, the company’s largest factory by output and primary vehicle export hub. In Tesla’s Q3 2023 Update Letter, Giga Shanghai was listed with an estimated annual capacity of over 950,000 vehicles. That’s quite a lot of Model 3 sedans that could be produced both for the domestic Chinese market and foreign territories. 

Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.

Advertisement
-
-

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement -
Comments

Cybertruck

Tesla Cybertruck production snaps back after ugly supplier fight

Cybertrucks are piling up again at Giga Texas after Tesla’s court win against a parts supplier.

Published

on

By

Tesla Cybertruck production resumes after supplier dispute: Credit: Joe Tegtmeyer | X
Tesla Cybertruck production resumes after supplier dispute: Credit: Joe Tegtmeyer | Youtube

Cybertruck production at Giga Texas is showing its first visible recovery since Tesla sued a supplier last month over withheld manufacturing tooling.

Aerial observer Joe Tegtmeyer flew over the Austin factory Wednesday morning and counted roughly 100 or more Cybertrucks filling the outbound lot, a sharp jump from the thin numbers seen in recent weeks. The flyover came a day after a judge granted Tesla a temporary restraining order against Angstrom Automotive Group, the parts supplier at the center of the dispute.

Tesla filed an emergency lawsuit in late July after Angstrom told the automaker it planned to close the Troy, Texas facility where Tesla’s die-cast tools, trim dies and other Cybertruck stamping equipment were housed. According to Tesla’s complaint, a shipment of 700 finished parts never left the building, and when Tesla sent representatives to retrieve its equipment, accompanied by law enforcement, they were turned away. Angstrom allegedly then asked for an extra $250,000 a week to keep operating, which Tesla’s filing described as holding its own property for ransom.

Tesla quietly made the Cybertruck even stronger

The restraining order gives Tesla immediate right of entry to Angstrom’s facility to recover the tooling. It is temporary, with a fuller hearing still to come, but the speed of Wednesday’s rebound suggests the Angstrom shortage was indeed the main bottleneck limiting Cybertruck output. Outbound lot counts are an imperfect measure of actual production, since finished trucks can sit for days before shipping, but a lot that full after a lean stretch is a meaningful signal.

Cybertruck output at Giga Texas has fluctuated all year as Tesla worked through supply issues and introduced new trims, including a cheaper Dual Motor AWD version that drew strong early demand.

Continue Reading

Elon Musk

Space finally faced the people living next to its next Terafab mega-project

SpaceX confirmed Terafab’s Grimes County site is locked in, with construction starting within months.

Published

on

By

SpaceX and Terafab representatives sat across from Grimes County residents for the first time on Wednesday, telling a packed Commissioners Court room that the $55 billion chip manufacturing project is now a done deal at the Gibbons Creek Reservoir site.

The meeting followed a $10 million check SpaceX sent the county earlier this week, satisfying a payment deadline built into the tax abatement agreement both sides signed in June. Elon Musk shared a post on X confirming the payment, and County Judge Joe Fauth told the San Antonio Express-News his office deposited the check after it beat its deadline.

Wednesday’s session, first reported by KBTX, moved the project from paperwork to construction. Terafab representative Riley Trennell told residents the JETI tax break agreements with Iola ISD and Anderson-Shiro CISD are signed and active, and that civil work and foundation prep are starting almost immediately. Renderings of the facility could be released within days, he said, with construction beginning within months.

Elon Musk launches TERAFAB: The $25B Tesla-SpaceXAI chip factory that will rewire the AI industry

Musk first announced Terafab in March as a joint venture between Tesla, SpaceX and xAI aimed at producing over a terawatt of AI compute annually, an amount that dwarfs the roughly 20 gigawatts the entire global chip industry produces today. Intel joined as a manufacturing partner in April. Musk has said the project needed its own day in the spotlight rather than being squeezed into an earnings call, and for months the Grimes County site remained unconfirmed even as reporting pointed there.

SpaceX attorney Buck Brannon used Wednesday’s meeting to note that the company’s abatement is roughly 78 percent, not the 100 percent some earlier reports suggested. In exchange, SpaceX will pay Grimes County a fixed $20 million a year for 35 years, a total of $710 million, which Brannon said exceeds the $14 million Tesla paid Travis County in 2025.

SpaceX also addressed environmental concerns that have followed the project since Musk’s Terafab partnership with Intel was announced. Representatives said Terafab will not raise electric bills for other ratepayers, will not deplete local water supplies and will not draw down the Navasota River. SpaceX confirmed it owns the Navasota River pumping station, which it plans to use to divert stormwater into the Gibbons Creek Reservoir, and said it will build its own natural gas plants to power the facility rather than pulling from the ERCOT grid.

Grimes County commissioners also approved an addendum letting county employees use ten approved AI chatbots for work, including Grok.

Continue Reading

Elon Musk

SpaceX has solved Starship’s biggest challenge, Elon Musk says

Published

on

Credit: SpaceX

Elon Musk has declared that SpaceX has effectively solved one of Starship’s most persistent engineering challenges: the reliability of its heat shield tiles.

During the company’s first-ever Earnings Call, the SpaceX CEO stated:

“I don’t want to jinx it or anything, but I think I would call the heat shield problem solved at this point. All indications from data and visual inspection is we have solved it. That doesn’t mean we won’t make improvements, but we do not see any technical obstacles to achieving rapid reusability at this point.”

Starship’s heat shield consists of roughly 18,000 hexagonal ceramic tiles covering the windward side of the upper stage. These tiles form the thermal protection system that shields the vehicle’s stainless-steel structure from the extreme heat of atmospheric reentry.

During descent, atmospheric friction generates temperatures exceeding several thousand degrees Celsius and creates plasma flows capable of melting unprotected metal. The tiles absorb, radiate, and insulate against this energy, allowing the vehicle to survive and potentially fly again. Without a durable heat shield, full and rapid reusability, the cornerstone of Starship’s design for frequent launches, satellite deployments, and deep-space missions, would remain impossible.

The tiles have long been a source of difficulty. On earlier test flights, a significant number of tiles detached during ascent due to vibration, aerodynamic loads, and imperfect attachment methods using pins and adhesives. Gaps between tiles allowed hot plasma to infiltrate, causing secondary damage and hot spots on the underlying structure.

These issues echoed challenges faced by NASA’s Space Shuttle, whose ceramic tiles required extensive, labor-intensive inspections and replacements between missions, preventing rapid turnaround. SpaceX has iteratively improved materials, standardized tile shapes, refined attachment techniques, added secondary ablative layers, and tested sealing methods such as “crunch wrap” felt to close gaps.

Progress was visible across Flights 10–12, with steadily better tile retention, yet questions remained about whether the system could support the minimal-refurbishment goal of rapid reuse.

Flight 13 on July 24 provided the decisive evidence. Ship 40 flew a deliberately more demanding profile with higher dynamic pressure to stress the heat shield beyond typical operational loads. It successfully deployed 20 operational Starlink V3 satellites, the first such payload on a Starship mission, performed an in-space Raptor engine relight, and executed a controlled reentry.

Elon Musk sheds two new bits of detail on Starship after 13th test launch

Cameras on six of the satellites and onboard sensors captured extensive imagery and data of the shield throughout the flight. The ship then achieved its softest splashdown to date in the Indian Ocean, remaining intact and floating rather than breaking apart or exploding as on prior missions. This allowed drone inspections and continuous telemetry of the heat shield in near-real time.

Post-flight analysis showed the majority of tiles remaining attached with only minor damage and limited plasma streaking at seams. Musk noted that the mission delivered “all the heat shield data we needed and then some.” Combined with visual inspections, these results underpinned his subsequent assessment that the core technical barriers to rapid reusability have been cleared. While refinements will continue, Flight 13 marked a pivotal step toward Starship’s operational future.

Continue Reading