Connect with us
Tesla-nacs-north-american-standard Tesla-nacs-north-american-standard

News

Tesla garners support from charging companies for NACS connector

(Credit: Tesla)

Published

on

Tesla is garnering support from charging companies on Monday for its North American Charging Standard (NACS) connector after several high-profile companies have agreed to partnerships with the automaker also to adopt it.

Earlier today, we already covered some of the companies that have adopted NACS.

Tesla NACS gains support from other EV charging companies

Tesla has already signed well-publicized deals with both Ford and General Motors (GM) that will see the two legacy companies make the NACS connector standard on their vehicles starting in 2025.

Advertisement

The companies will also gain access to Tesla’s Supercharger Network at 12,000 locations across North America but will need an adapter to do so until the vehicles are built with NACS as a standard.

The two monumental partnerships have already had residual effects as numerous charging companies have made announcements this morning that they would also adopt the NACS connector to support charging across the automakers that choose to utilize it.

Blink Charging was the first company to announce its intentions to adopt NACS in a statement this morning:

“Given recent announcements by Tesla, GM, and Ford, we are clearly witnessing the continued evolution of the EV charging industry as technologies advance and industry stakeholders come together and evaluate best practices.”

Advertisement

Kempower then came out with a similar announcement this morning, stating that it was prepared to add NACS to all North American deliveries.

“We want to offer reliable and smooth charging for all electric car drivers in North America. One of our strengths is our ability to respond quickly to customer and market expectations – we are adding NACS to our portfolio to continue to offer the best charging experience for all EV drivers across the globe,” the company said.

Both Tritium and ChargePoint followed up with announcements of their own, pledging to adopt NACS.

The acceptance of NACS following Tesla’s partnerships with Ford and GM are encouraging for the widespread adoption of the connector, which was first pushed by Aptera earlier this year. The connector will enable more vehicles to utilize Tesla’s Supercharger network, but also for the NACS to become the national standard, potentially replacing CCS charging connectors.

Advertisement

I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

SpaceX weighs Nasdaq listing as company explores early index entry: report

The company is reportedly seeking early inclusion in the Nasdaq-100 index.

Published

on

Credit: SpaceX/X

Elon Musk’s SpaceX is reportedly leaning toward listing its shares on the Nasdaq for a potential initial public offering (IPO) that could become the largest in history. 

As per a recent report, the company is reportedly seeking early inclusion in the Nasdaq-100 index. The update was reported by Reuters, citing people familiar with the matter.

According to the publication, SpaceX is considering Nasdaq as the venue for its eventual IPO, though the New York Stock Exchange is also competing for the listing. Neither exchange has reportedly been informed of a final decision.

Reuters has previously reported that SpaceX could pursue an IPO as early as June, though the company’s plans could still change.

Advertisement

One of the publication’s sources also suggested that SpaceX is targeting a valuation of about $1.75 trillion for its IPO. At that level, the company would rank among the largest publicly traded firms in the United States by market capitalization.

Nasdaq has proposed a rule change that could accelerate the inclusion of newly listed megacap companies into the Nasdaq-100 index.

Under the proposed “Fast Entry” rule, a newly listed company could qualify for the index in less than a month if its market capitalization ranks among the top 40 companies already included in the Nasdaq-100.

If SpaceX is successful in achieving its target valuation of $1.75 trillion, it would become the sixth-largest company by market value in the United States, at least based on recent share prices. 

Advertisement

Newly listed companies typically have to wait up to a year before becoming eligible for major indexes such as the Nasdaq-100 or S&P 500.

Inclusion in a major index can significantly broaden a company’s shareholder base because many institutional investors purchase shares through index-tracking funds.

According to Reuters, Nasdaq’s proposed fast-track rule is partly intended to attract highly valued private companies such as SpaceX, OpenAI, and Anthropic to list on the exchange.

Advertisement
Continue Reading

Elon Musk

The Boring Company’s Prufrock-2 emerges after completing new Vegas Loop tunnel

The new tunnel measures 2.28 miles, making it the company’s longest single Vegas Loop tunnel to date.

Published

on

Credit: The Boring Company/X

The Boring Company announced that its Prufrock-2 tunnel boring machine (TBM) has completed another Vegas Loop tunnel in Las Vegas. The company shared the update in a post on social media platform X.

According to The Boring Company’s post, the new tunnel measures 2.28 miles, making it the company’s longest single Vegas Loop tunnel to date.

The new tunnel marks the fourth tunnel constructed near Westgate Las Vegas as the Vegas Loop network continues expanding across the city.

The Boring Company also noted that the new tunnel surpassed its previous internal record of 2.26 miles for a single Vegas Loop segment.

Advertisement

Construction of the tunnel involved moving roughly 68,000 cubic yards of dirt. The excavation process also used about 4.8 miles of continuous conveyor belt, powered by six motors totaling 825 horsepower.

The Boring Company’s Prufrock-series all-electric tunnel boring machines are designed to support the rapid expansion of company’s underground transportation projects, including the growing Vegas Loop network. Prufrock machines are designed for reusability, thanks in no small part to their capability to be deployed and retrieved easily through their “porposing” feature.

The Vegas Loop, specifically the Las Vegas Convention Center (LVCC) Loop segment, has already been used during major events. Most recently, the LVCC Loop supported the 2026 CONEXPO-CON/AGG construction trade show, which was held from March 3-7, 2026. 

As per The Boring Company, the LVCC Loop transported roughly 82,000 passengers across the convention center campus during the event’s duration. 

Advertisement

CONEXPO-CON/AGG is one of the largest construction trade shows in North America, drawing more than 140,000 construction professionals from 128 countries this year.

The LVCC Loop forms the initial segment of the broader Vegas Loop network, which remains under active development as The Boring Company continues building new tunnels throughout the city.

Continue Reading

News

Tesla gathers Cybercab fleet in Gigafactory Texas

Images and video of the Cybercab fleet were shared by longtime Giga Texas observer Joe Tegtmeyer in posts on social media platform X.

Published

on

Credit: Credit: @JoeTegtmeyer/X

Tesla appears to be assembling a growing number of Cybercabs at Gigafactory Texas as preparations continue for the vehicle’s mass production. Recent footage shared online has shown over 30 Cybercabs being transported by trucks or staged near testing areas at the facility.

The images and video were shared by longtime Giga Texas observer and drone operator Joe Tegtmeyer in posts on social media platform X.

Interestingly enough, Tegtmeyer noted that many of the Cybercabs being loaded onto transport trucks were still equipped with steering wheels. This suggests that the vehicles are likely testing units rather than the final driverless configuration expected for the company’s Robotaxi service.

The vehicles could potentially be headed to testing sites across the United States as Tesla prepares to expand its Robotaxi fleet.

Advertisement

Additional footage captured at Gigafactory Texas also showed the Cybercab’s side and rear camera washer system operating as vehicles were being loaded onto transport trucks.

The growing number of Cybercabs at Giga Texas comes amidst the company’s announcement that the first production Cybercab has been produced at the facility. Full Cybercab production is expected to begin in April.

The vehicle is expected to play a central role in Tesla’s Robotaxi ambitions as the company looks to expand autonomous ride-hailing operations beyond its early deployments using Model Y vehicles.

Tesla has also linked Cybercab production to its proposed Unboxed manufacturing process, which assembles large vehicle modules separately before integrating them. The approach is intended to reduce production costs and accelerate output.

Advertisement

Musk has also noted that the Cybercab’s ramp will likely begin slowly due to the number of new components and manufacturing steps involved. However, he stated that once the process matures, Cybercab production could scale quickly.

Continue Reading