Tesla Giga Shanghai has resumed over 80% production along with several other companies, according to Chinese official Zhang Hongtao — the chief engineer of the Shanghai Economics and Information Technology Commission.
China created a “whitelist” to support companies resuming production and minimize the impact of Covid along the supply chain. As of Saturday, April 30, approximately 1,854 companies have made it onto the whitelist, including Tesla, and are authorized to resume work.
During a press conference, Zhang stated that Shanghai created a second list of 1,188 companies that can resume work. According to the Global Times, the companies fall into the automobile manufacturing, equipment manufacturing, and biomedicine sector.
Tesla welcomed about 8,000 workers back to Giga Shanghai by April 19 after subsequent lockdowns due to Covid outbreaks. At the time, Giga Shanghai’s Senior Director of manufacturing Song Gang publicly stated that battery and motor production was “already producing at full speed.”
During the last TSLA earnings call, CFO Zachary Kirkhorn mentioned Giga Shanghai’s lockdowns in his opening remarks. He noted that Tesla lost about a month of build volume due to the shutdowns. Kirkhorn told investors that the Shanghai lockdowns might affect Tesla’s total build and volume numbers in the second quarter. However, he added that the company was working to get back to full production “as quickly as possible.”
The EV manufacturer adopted a closed-loop system to resume operations, including temporarily housing employees within the gigafactory’s complex. By April 22, 2022, Elon Musk mentioned that Giga Shanghai was “coming back with a vengeance.”
During the Q1 2022 earnings call, Musk estimated that Tesla’s Q2 build and delivery numbers might be more or less than it did in the first quarter as Shanghai ramps back up to full production. Tesla produced 305,407 and delivered 310,048 vehicles in the first quarter. However, Musk was optimistic that Shanghai’s build and delivery volume would significantly increase by Q3 and Q4.
The Teslarati team would appreciate hearing from you. If you have any tips, reach out to me at maria@teslarati.com or via Twitter @Writer_01001101.
News
Tesla Semi involved in first known fatal crash in Nevada
A Tesla Semi was involved in a fatal collision on U.S. Highway 50 in Dayton, Nevada, on Sunday, June 28, 2026, marking the first known fatal crash involving the electric Class 8 truck. The incident occurred around 7:20 a.m. at the intersection with Traditions Parkway, approximately 40 miles east of Reno and close to Tesla’s Gigafactory Nevada.
According to the Lyon County Sheriff’s Office and the Nevada State Police Highway Patrol, a semi-truck struck two passenger vehicles stopped at a traffic signal. The truck hit the vehicles from behind. Two people were pronounced dead at the scene, and a third person suffered life-threatening injuries and was flown to a hospital, Forbes reported.
Preliminary statements gathered at the scene by the Lyon County Sheriff’s Office suggested the truck driver may have fallen asleep at the wheel. However, the Nevada Highway Patrol, which is leading the investigation, stated that the official cause has not yet been determined.
Additional information is expected to be released early the following week. The truck was seized for evidence as part of the ongoing probe.
Responders at the scene included deputies from the Lyon County Sheriff’s Office, personnel from the Nevada Highway Patrol, Central Lyon County Fire Department, and the Nevada Department of Transportation. The crash led to the temporary closure of U.S. 50 in both directions.
The Tesla Semi is Tesla’s battery-electric heavy-duty truck, produced at the nearby Gigafactory in Nevada. Authorities initially described the vehicle as a semi-truck; its make was subsequently confirmed through reporting and scene identification; an interesting bit of information here, as the Semi is not yet available publicly and many do not know that Tesla builds electric trucks.
The investigation remains active, with no further official details on contributing factors or vehicle systems released as of early July 2026.
This incident highlights ongoing scrutiny of commercial vehicle safety on Nevada highways, particularly involving fatigue. Law enforcement continues to gather evidence and witness statements.
News
Tesla expands Robotaxi to Florida, marking its third state for autonomy
Tesla has expanded its Robotaxi program to Miami, Florida, marking the third state the autonomous ride-hailing platform has made its way to since launching last Summer.
Tesla announced today that the Robotaxi suite would now officially launch rides in a geofence in Miami:
🚨 Tesla’s “Long Weekend” continues with a HUGE announcement regarding Robotaxi!
It’s now in Miami!
Miami joins Austin, Dallas, Houston, and the Bay Area! https://t.co/ujjYjJT3Im pic.twitter.com/yPe1ZdSQIE
— TESLARATI (@Teslarati) July 3, 2026
The first geofence in Miami covers approximately 10 to 14 square miles. The area appears to be focused on western and central Miami, including Miami International Airport (MIA). It also includes popular routes like SR 826 (Palmetto Expressway), US 41 (Tamiami Trail), and connectors such as SR 968, 953, 959, and 972.
This is Tesla’s initial Miami launch zone, smaller and more targeted than some competitors’ areas (for example, Waymo’s initial rollout was broader in eastern neighborhoods). It prioritizes high-traffic, airport-linked routes before wider expansion.
The expansion is a huge signal for Tesla that it is now operating in Florida, a heavy-traffic state with many tourist areas, including Fort Lauderdale, Palm Beach, and the Boynton area, all of which are coastal and will attract perhaps millions of tourists in any given year.
¿Qué lo que Miami?
Robotaxi now available in Miami pic.twitter.com/P1m283seZU
— Tesla Robotaxi (@robotaxi) July 3, 2026
The Tesla Robotaxi network launched last year on June 22, in Austin, Texas, beginning limited commercial operations in that city. It expanded shortly thereafter into the San Francisco Bay Area of California in late July 2025, marking entry into a second state with service covering key areas such as San Francisco, San Jose, and Berkeley.
Full commercial service was achieved in Austin by November 18, 2025, strengthening its presence within Texas before further growth.
In 2026, the network continued expanding across Texas with the addition of Dallas and Houston on April 18, significantly broadening its footprint in the state. This new launch into Miami marks Tesla entering a new state and bringing active locations to include Austin, Dallas, Houston, San Antonio in Texas, and the Bay Area in California.
These sequential expansions have steadily increased the network’s reach across major metropolitan areas in Texas, California, and Florida, focusing on scaling operations city by city and state by state since the initial Austin debut.
Elon Musk
Elon Musk outlines Tesla Optimus production expectations
Tesla CEO Elon Musk has tempered expectations for the company’s humanoid robot Optimus, emphasizing that initial production will ramp up slowly despite recent progress on the manufacturing line. In a July 1 reply on X, Musk responded to optimistic community speculation by stating, “No, Optimus production will be extremely slow at first, as everything is new. This is not like making a car.”
No, Optimus production will be extremely slow at first, as everything is new. This is not like making a car.
— Elon Musk (@elonmusk) July 1, 2026
The comment came in response to a post theorizing that Tesla had accelerated Optimus V3 development and might soon unveil an impressive demonstration with multiple units already in meaningful production. Musk’s clarification highlights the fundamental differences between scaling a novel humanoid robot and Tesla’s established automotive operations, which benefit from over a century of refined supply chains, tooling, and processes.
Recent updates show tangible advancement. Musk shared a photo of himself walking the Optimus production line at Fremont, where Tesla is converting former Model S/X manufacturing space. According to Q1 2026 earnings commentary, limited production is slated to begin in late July or August 2026 on this converted line.
Tesla Optimus project fires up as Musk sees production line progress
Musk previously noted that Optimus features roughly 10,000 unique parts, making early output rates “literally impossible to predict” and describing them as “quite slow.” A larger dedicated factory at Giga Texas is under construction, targeting higher-volume production around summer 2027 with long-term annual capacity potentially reaching millions of units.
Some experts point out that pioneering humanoid robotics demands inventing new automation techniques, actuator supply chains, and quality-control standards in real time. Unlike vehicles, where components and assembly methods are mature, every element of Optimus—from dexterous hands to AI-integrated movement—requires fresh engineering solutions. Early units are expected to handle simple factory tasks before expanding to more complex roles.
This cautious approach aligns with Tesla’s history of under-promising and over-delivering on complex technologies. While enthusiasts hoped for rapid deployment, Musk’s message underscores a deliberate strategy: prioritize reliability and iterative improvement over rushed volume.
Analysts suggest the S-curve ramp typical of new manufacturing will eventually accelerate once foundational issues are resolved, positioning Optimus as a potential trillion-dollar product line.
Musk has long envisioned Optimus transforming labor markets, assisting in homes, factories, and hazardous environments. By setting realistic timelines, Tesla aims to build sustainable momentum rather than risk disappointment. As the Fremont line comes online this summer, investors and fans will watch closely for the first production metrics and capability demonstrations.