Tesla has declined $6.4 million in funding that would have been used to build four massive Supercharger stations in California due to stipulations with integrated payment methods that must be utilized to receive the money.
In September, Tesla planned to build four massive Superchargers, some with more than 100 total stalls, making them amongst the largest in the world.
The Superchargers were expected to be located throughout California, including a 164-stall site in Coalinga and two 100-stall sites in Willows and Barstow. California continues to lead the country in Tesla ownership, so it is ideal that the largest Supercharger stalls be located there.
Tesla was going to receive funding for these projects through the California Energy Commission’s Clean Transportation Rural Electric Vehicle Charging Program and was set to receive $6.4 million to build out these massive stations.
However, Tesla will not accept the funding, according to a letter obtained by Drive Tesla, as the stipulations related to payment infrastructure requirements are not something the automaker will align with. Tesla’s Policy and Business Development Lead in California, Jennifer Cohen, wrote to the CEC:
“The California Clean Energy Commission (CEC) has been a great visionary in the expansion of electric vehicle (EV) charging infrastructure in California. Unfortunately, due to unnecessarily cumbersome payment infrastructure requirements, we are unable to utilize this award.”
According to the Program’s Application Manual, qualifying chargers must have “multiple point-of-sale methods” and require stalls to offer payment methods such as “ISO 15118 Plug-and-Charge, a device which accepts RFID or Smart cards, or payment through mobile apps.”
Tesla’s Superchargers do not have screens, and the vehicle connects to the Supercharger with the credit card linked to the owner’s account. This creates a streamlined and touchless payment process and is simply linked to the card on file.
Tesla may not have plans to implement a POS system on its Superchargers, and this would immediately disqualify it from qualifying for the funding anyway. However, the State granted the automaker the ability to make the choice themselves, and they declined.
As for the Supercharger stations, it is unclear whether the plans will move forward. However, Tesla continues to build out its robust Supercharger network, which makes it more than believable that it will be able to find funding from other sources.
Tesla recently opened some of its Supercharger Network to non-Tesla EVs so it could qualify for a slice of $7.5 billion set aside for the expansion of the EV charging network through the Bipartisan Infrastructure Deal.
I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.
Elon Musk
Tesla Cybercab coming next to Giga Berlin, Optimus possibly after
“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said.
Tesla could add the Cybercab and Optimus humanoid robot to the production lineup at Giga Berlin, as per recent comments from CEO Elon Musk.
During a recent interview with Giga Berlin plant manager André Thierig, Musk identified the Cybercab as the most likely next major product for the German factory, with Optimus potentially following after.
“From a next major product standpoint, I think most likely is the Tesla Cybercab,” Musk said. He added that there are also “possibilities of Tesla Optimus” being produced in the facility.
Tesla has already begun production of the Cybercab in Giga Texas, with volume production expected to ramp this year. Based on Musk’s comments, it appears that if conditions align in Europe, Giga Berlin could eventually join that effort.
The CEO’s comments about Optimus coming to Gigafactory Berlin are quite unsurprising too considering that Musk has mentioned in the past that the humanoid robot will likely be Tesla’s highest volume product in the long run.
Giga Berlin will likely be able to produce mass volumes of Optimus, as the Model S and Model X lines being converted to an Optimus line in the Fremont Factory are already expected to produce 1 million units of the humanoid robot annually.
Apart from his comments about the Cybercab and Optimus, Elon Musk also confirmed that Giga Berlin has started ramping battery cell production and will continue expanding Model Y output, particularly as supervised Full Self-Driving (FSD) gains regulatory approvals in Europe.
Taken together, the remarks suggest Berlin’s role could evolve beyond vehicle assembly into a broader multi-product manufacturing hub, not just a regional Model Y plant.
Energy
Tesla Powerwall distribution expands in Australia
Inventory is expected to arrive in late February and official sales are expected to start mid-March 2026.
Supply Partners Group has secured a distribution agreement for the Tesla Powerwall in Australia, with inventory expected to arrive in late February and official sales beginning in mid-March 2026.
Under the new agreement, Supply Partners will distribute Tesla Powerwall units and related accessories across its national footprint, as noted in an ecogeneration report. The company said the addition strengthens its position as a distributor focused on premium, established brands.
“We are proud to officially welcome Tesla Powerwall into the Supply Partners portfolio,” Lliam Ricketts, Co-Founder and Director of Innovation at Supply Partners Group, stated.
“Tesla sets a high bar, and we’ve worked hard to earn the opportunity to represent a brand that customers actively ask for. This partnership reflects the strength of our logistics, technical services and customer experience, and it’s a win for installers who want premium options they can trust.”
Supply Partners noted that initial Tesla Powerwall stock will be warehoused locally before full commercial rollout in March. The distributor stated that the timing aligns with renewed growth momentum for the Powerwall, supported by competitive installer pricing, consumer rebates, and continued product and software updates.
“Powerwall is already a category-defining product, and what’s ahead makes it even more compelling,” Ricketts stated. “As pricing sharpens and capability expands, we see a clear runway for installers to confidently spec Powerwall for premium residential installs, backed by Supply Partners’ national distribution footprint and service model.”
Supply Partners noted that a joint go-to-market launch is planned, including Tesla-led training for its sales and technical teams to support installers during the home battery system’s domestic rollout.
Elon Musk
Tesla Giga Berlin growth could stall if not “free from external influences”: Elon Musk
The comments were delivered in a pre-recorded video discussion.
Tesla CEO Elon Musk has reportedly warned that future expansion of Gigafactory Berlin could be jeopardized if the site does not remain “free from external influences.”
Musk’s comments were delivered in a pre-recorded video discussion with employees and came at a sensitive moment for the facility, where union representation has been a recurring issue.
According to reports from Handelsblatt and Der Spiegel, citing participants at the event, Musk suggested that if Giga Berlin is no longer “free from external influences,” further expansion would become unlikely. He did not, however, hint that the plant would shut down.
While Musk did not name IG Metall directly, his remarks were widely interpreted as referencing the union, which is currently the largest faction on the works council but does not hold a majority, as noted in an electrive report.
The video conversation was conducted between Musk in Austin and Grünheide plant manager André Thierig, then played back to the workforce in Germany. Works council elections are scheduled for early March, heightening the tension between management and organized labor.
The CEO has previously voiced concerns that stronger union influence could limit Tesla’s operational flexibility and long-term strategy in Germany.
Despite the warning on expansion, Musk praised the Giga Berlin site during the same address, describing it as one of the most advanced factories worldwide and highlighting its cleanliness and team culture.
The discussion also reportedly touched on battery cell production. According to attendees cited in German media, Musk indicated that Tesla has begun ramping cell production at the site. That would mark a notable shift from earlier expectations that large-scale cell manufacturing in Brandenburg would not begin until 2027.