Today, General Motors made its $7 billion plan to expand electric vehicle and EV parts manufacturing in Michigan official. CEO Mary Barra announced the plans to add 4,000 new jobs to the State through EV updates to its factories. Additionally, it will build a new battery factory and convert an existing factory into a hub for manufacturing its electric pickup trucks.
Last week, we reported that GM was planning to invest at least $6.5 billion to develop new facilities in Michigan and contribute 4,000 new jobs while retaining an additional 1,000.
“Today, we are taking the next step in our continuous work to establish GM’s EV leadership by making investments in our vertically integrated battery production in the U.S. and our North American EV production capacity,” Mary Barra, CEO and Chairwoman of General Motors said. “We are building on the positive consumer response and reservations for our recent EV launches and debuts, including GMC HUMMER EV, Cadillac LYRIQ, Chevrolet Equinox EV, and Chevrolet Silverado EV. Our plan creates the broadest EV portfolio of any automaker and further solidifies our path toward U.S. EV leadership by mid-decade.”
GM will spend $2.6 billion on a brand new factory in the Lansing area in a joint venture with LG Energy Solution. Additionally, $4 billion will be used to convert the Orion Township factory into the main facility for GM’s various electric pickups, including the recently announced Chevrolet Silverado EV and the GMC Sierra EV, starting in 2024. It will also invest an additional $510 million of the $7 billion budget in two Lansing-area vehicle assembly plants, which will bring the facilities up-to-date, but it will upgrade its current offerings at these sites, which are non-electric.
“Michigan will be the recognized hub and leader of innovation in the U.S. for EV R&D and manufacturing,” GM President Mark Reuss said today.
Most of the EVs that GM plans to produce will be built at the Orion and Factory Zero facilities In Michigan, Reuss said. The Orion plant will produce 360,000 vehicles by 2025 if all goes according to plan. Factory Zero, GM’s site for “zero crashes, zero emissions, and zero congestion,” will build 270,000 units by mid-decade. To supplement its 1 million EV production goal, GM will convert additional plants across North America to build EVs.
Renovations and new construction continue at General Motors Factory ZERO Friday, July 2, 2021, in Detroit, Michigan. GM is investing $2.2 billion to convert the former Detroit-Hamtramck Assembly plant into its first fully dedicated electric vehicle assembly facility. (Photo by Jeffrey Sauger for General Motors)
$2.6 Billion Battery Plant in Lansing
The $2.6 billion battery plant that was announced in a joint venture with LG Energy Solution will land in the Lansing area of the State of Michigan. It will open in late 2024, according to GM, and will be 2.8-million square feet in size. The facility will produce GM’s Ultium EV battery cells, which is the automaker’s main point of emphasis for its expanding fleet of EVs. The Ultium cells will be made in-house, which could contribute to GM’s plan to expand EV manufacturing to monumental levels by 2025. Instead of sourcing the cells from third-party manufacturers, GM is planning to produce them in-house and avoid any potential bottlenecks in the supply chain, which also could cause the automaker to revise its production goals.
GM announces the Chevy Silverado EV: 400 miles of range with Ultium battery tech
GM could control the costs of its batteries by manufacturing them. Batteries are the most expensive part of an EV, and the key to controlling their cost is to fully integrate the entire supply chain into a business model. Everything from mining the raw materials to putting the battery pack into an EV can be done without the help of suppliers. It is difficult to do, but it is how Tesla basically managed to overtake every other manufacturer in the United States and gain recognition as the most-productive automaker in the country, based on production numbers from the Fremont Factory in Northern California. Tesla’s success also involved vertical integration of many of its parts, not just battery packs.
The Ultium cells could be capable of range ratings of 450 miles or greater. They are also manufactured differently, as they are pouch cells instead of cylindrical cells used by other companies.
GM plans to be all-electric by 2035.
I’d love to hear from you! If you have any comments, concerns, or questions, please email me at joey@teslarati.com. You can also reach me on Twitter @KlenderJoey, or if you have news tips, you can email us at tips@teslarati.com.
News
Tesla launches Full Self-Driving in a new region
Today, Tesla launched Full Self-Driving in Australia for purchase by car buyers for $10,100, according to Aussie automotive blog Man of Many, which tried out the suite earlier this week.

Tesla has launched its Full Self-Driving suite in a new region, marking a significant step in the company’s progress to expand its driver assistance suite on a global scale.
It is also the first time Tesla has launched FSD in a right-hand-drive market.
Today, Tesla launched Full Self-Driving in Australia for purchase by car buyers for $10,100, according to Aussie automotive blog Man of Many, which tried out the suite earlier this week.
Previously, Basic and Enhanced Autopilot suites were available, but the FSD capability now adds Traffic Light and Stop Sign Control, along with all the features of the previous two Autopilot suites.
🚨 Tesla has officially launched Full Self-Driving in Australia for the price of $10,100 outright.
The move marks a significant step in Tesla’s progress to expand the suite on a global scale pic.twitter.com/zzHa8Ngqls
— TESLARATI (@Teslarati) August 28, 2025
It is the first time Tesla has launched the suite by name in a region outside of North America. In China, Tesla has “City Autopilot,” as it was not permitted to use the Full Self-Driving label for regulatory reasons.
However, Tesla still lists Full Self-Driving (Supervised) as available in the U.S., Canada, China, Mexico, and Puerto Rico.
The company teased the launch of the suite in Australia earlier this week, and it appeared to have been released to select media members in the region earlier this week:
Tesla FSD upcoming Australia release seemingly teased bv media
The rollout of Full Self-Driving in the Australian market will occur in stages, as Model 3 and Model Y vehicles with Hardware 4 will receive the first batch of FSD rollouts in the region.
TechAU also reported that “the initial deployment of FSDs in Australia will roll out to a select number of people outside the company, these people are being invited into Tesla’s Early Access Program.”
Additionally, the company reportedly said it is “very close” to unlocking FSD in customer cars:
BREAKING: Tesla has officially announced that FSD (Supervised) is launching in Australia, marking a huge milestone for the company.
The rollout will happen in stages. HW4 Model 3s and Model Ys will get it first. Tesla says it is “very close” to being unlocked in customer cars.… pic.twitter.com/r1dYnFRa6o
— Sawyer Merritt (@SawyerMerritt) August 28, 2025
Each new Tesla sold will also come with a 30-day free trial of the suite.
Australia is the sixth country to officially have Full Self-Driving available to them, following the United States, Canada, China, Mexico, and Puerto Rico.
Here’s the first look at the suite operating in Australia:
News
Tesla AI6 chips will start sample production at surprising Samsung site
AI6 is expected to be used in Tesla’s expanding lineup of high-volume products, such as the Cybercab and Optimus.

It appears that the initial sample production of Tesla’s next-generation AI6 chip would not start in Samsung’s United States-based facilities.
AI6 is expected to be used in Tesla’s expanding lineup of high-volume products, such as the Cybercab and Optimus.
Early AI6 production
As noted in a ZDNet Korea report, the production of initial samples of Tesla’s AI6 chip is expected to start at Samsung Electronics’ domestic foundry and packing facilities in South Korea. Mass production for AI6 chips will follow at the tech giant’s Texas-based foundry in Taylor, which is expected to start operations in 2025. Investment in mass production facilities for the Taylor plant are expected to start this year, the publication noted.
Samsung has reportedly finalized the process design kit for its second-generation 2nm technology. This node offers a 12% performance improvement, 25% lower power consumption, and an 8% reduction in chip area compared to its previous-generation counterparts.
Tesla’s AI6 deal
As per previous reports, Tesla has signed a $16.5 billion contract with Samsung for the production of its AI6 chips. In a post on social media platform X, Musk clarified that $16.5 billion is actually just the bare minimum. Considering that the demand for AI6 chips will be substantial due to the ramp of products such as Optimus and the Cybercab, it would not be farfetched if the deal becomes notably larger in the future.
Musk has shared his excitement for Samsung’s production of AI6 chips, with the CEO stating on X that he would “walk the line personally” in the facility to “accelerate the pace of progress.” In a follow-up comment, the Tesla CEO stated that Samsung is fully aware of what a real partnership with Tesla will be like. “I had a video call with the chairman and senior leadership of Samsung to go over what a real partnership would be like. Use the strengths of both companies to achieve a great outcome,” Musk wrote in his post.
News
Elon Musk’s Boring Company begins Tesla FSD testing in Las Vegas tunnels
The update was shared by Las Vegas Convention and Visitors Authority (LVCVA) CEO Steve Hill.

The Boring Company has started testing Tesla’s Full Self-Driving (Supervised) system in its Las Vegas tunnels.
The update was shared by Las Vegas Convention and Visitors Authority (LVCVA) CEO Steve Hill in a comment to Fortune.
Controlled FSD testing
In his comments, Hill noted that Tesla’s FSD tests in the Boring Company’s underground tunnels in Las Vegas have been going on for months. However, the full-self driving Teslas have reportedly not been carrying passengers during the tests. Interestingly enough, Hill noted that the FSD-driven vehicles have not had any incidents in the Boring Company tunnels yet, though safety drivers have been required to intervene “periodically.”
Hill further noted that the self-driving Teslas have found some spots that seem quite difficult in the underground tunnels system. The LVCVA CEO added that the rock walls of the Boring Company tunnels and their colorful lighting have created some “interesting but odd lighting” for FSD. That being said, Hill noted that the FSD tests are ongoing, though the LVCVA will likely be a consultant before the self-driving vehicles’ safety drivers are removed.
The executive, however, noted that it will only be a matter of time before the Teslas in Las Vegas’ Boring Company tunnels are operating without a driver. “Sooner or later, this is going to be autonomous,” Hill said.
Vegas Loop updates
The Boring Company’s underground transit system has been operating beneath the Las Vegas Convention Center for about four years. While the network is slated for expansion across more of the city, it currently connects the convention grounds with a handful of nearby hotels. Updates from the Boring Company’s official social media account on X suggests that tunneling is underway across other stops in Las Vegas.
As per the Boring Company on its official website, the greater Vegas Loop, when completed, will have 104 stations across 68 miles of tunnels. This should allow the underground system to serve an estimated 90,000 passengers per hour. It will also be able to connect key locations across the city, such as Harry Reid International Airport, Allegiant Stadium, and downtown.
While the Vegas Loop is nowhere near complete, Hill noted that the system is already well appreciated by residents and visitors. As per the LVCVA CEO, the underground transport system is the “highest rated feature we have” at the Convention Center. “People love it,” he said, adding that the only reason the tunnels are not coming faster is due to holdups with permits. “We’re holding them back. They’re not holding us back,” he stated.
-
Elon Musk19 hours ago
SpaceX Starship Flight 10 was so successful, it’s breaking the anti-Musk narrative
-
News15 hours ago
Tesla appears to have teased a long-awaited Model Y trim for a Friday launch
-
News1 day ago
Tesla China working overtime to deliver Model Y L as quickly as possible
-
News3 days ago
Tesla Model Y L sold out for September 2025
-
Elon Musk3 days ago
Elon Musk argues lidar and radar make self driving cars more dangerous
-
News1 day ago
Tesla Semi earns strong reviews from veteran truckers
-
Elon Musk24 hours ago
Tesla reveals it has expanded its Robotaxi fleet in Austin
-
Elon Musk6 days ago
Elon Musk takes aim at Bill Gates’ Microsoft with new AI venture “Macrohard”