Connect with us

Energy

Tesla’s partner Panasonic to expand EV battery production in Japan

Published

on

As Tesla ramps up its production for the Model 3, one of its partners is also planning to increase production of electric vehicle batteries halfway around the world. According to the Japan Times, “Panasonic Corp. said Friday it will start manufacturing lithium-ion batteries for electric cars in fiscal 2019 at its plant in Himeji, Hyogo Prefecture, expanding domestic production to meet growing demand for green vehicles across the globe.”

It’s reported that, “Panasonic has been expanding its lithium-ion battery production both at home and abroad. The Japanese electronics maker supplies lithium-ion batteries to U.S. electric-car maker and energy company Tesla Inc., and the two companies also jointly run a plant in Nevada named Gigafactory that mass-produces the batteries.”

Panasonic, including its output via Tesla’s Gigafactory, remains the industry leader for electric vehicle battery production worldwide (Source: The Economist)

It turns out that Panasonic’s latest plant will be a factory conversion from LCD TV panel production to lithium-ion batteries for electric vehicles. “The Osaka-based electronics maker is likely to spend tens of billions of yen on setting up production lines there… [and] within Japan, Panasonic already has five other lithium-ion battery production plants.” Panasonic’s latest plans are aligned with recent efforts to pivot its business towards the auto sector.

Nasdaq (via Reuters) notes that, “Panasonic, the exclusive battery cell supplier for Tesla Inc’s mass-market Model 3, is reinventing itself as a provider of advanced auto parts to escape the price competition of smartphones and other lower-margin consumer products.” And Panasonic’s new direction is proving to be increasingly promising: “Panasonic sees batteries as a key driver for its plan to nearly double its automotive business revenue to 2.5 trillion yen ($22 billion) in the year through March 2022.”

And that’s not all — the company is also opening a new battery plant in Dalian, China. In addition to Tesla, it’s likely Panasonic’s new plants will service multiple automakers, especially in light of changes occurring in the world biggest auto market, China. Panasonic said in a statement: “The global market for eco-conscious vehicles has been growing… [leading to] increasing expectations from auto manufacturers on Panasonic, the leading manufacturer of automotive lithium-ion batteries.”

This story was originally published by Matt Pressman on EVANNEX.

Advertisement
-
Advertisement
Comments

Elon Musk

Google just picked SpaceX for its first step into orbital AI

Google will launch its first Project Suncatcher AI satellite on SpaceX’s Transporter-18 rideshare next week.

Published

on

By

Google is about to put its own AI chips into orbit for the first time, and it is paying SpaceX to get them there.

The company said Thursday that the first in-orbit test of Project Suncatcher, its research effort to find out whether space can host large-scale AI computing, will fly next week on SpaceX’s Transporter-18 rideshare mission.

The satellite, called MVP, is about the size of a refrigerator and carries four of Google’s Tensor Processing Units, the same chips Google runs in its ground data centers. Google originally planned to launch two custom satellites in 2027, but chose to move faster by integrating its chips into a satellite.

MVP’s solar panels supply about one kilowatt of power, and Google will run Gemini models on the TPUs only in bursts of roughly 15 minutes before the chips shut down so the radiators can shed heat. In a blog post, Google said its Trillium TPUs survived vibration testing that mimicked sustained launch loads of up to 10g, with individual components seeing 50 to 100g, and handled a radiation dose greater than a five year mission would deliver.

SpaceX and Google mull massive partnership on Musk’s orbital data dream: report

Next week’s flight, slated for October 1, follows a relationship that became public in May, when Teslarati reported that Google was in talks with SpaceX for a launch deal tied to orbital data centers. Google also holds a stake of roughly 6% in SpaceX.

Advertisement
-

The two companies are chasing the same idea from very different starting points. SpaceX’s own orbital compute program is built around the AI1 satellite, a roughly 70 meter structure derived from Starlink V3 hardware that is designed for 150 kW of peak compute, about 150 times the power MVP will draw. Elon Musk has brushed off concerns about crowding orbit with those satellites, and SpaceX is building its Gigasat factory in Bastrop, Texas, to produce them, targeting an annualized rate of about 1 GW of space compute by the end of 2027.

Musk also posted on X on Thursday that “the amount of compute in space will obviously round up to 100% of all compute.”

Google has been more cautious in public. Its research estimates that launch prices need to fall below about $200 per kilogram before an orbital data center can compete with a ground facility on energy cost, a threshold the company believes could be reached around the mid 2030s. The Suncatcher team has said it expects the effort to remain a project rather than a product for years, which leaves the first real test of its hardware riding on a rocket from the company with the most aggressive timeline in the field.

Continue Reading

Energy

Tesla Semi factory is getting a celebration nobody expected

Tesla will inaugurate its Nevada Semi factory September 24, five months after production quietly began ramping.

Published

on

By

Tesla says it will officially inaugurate its new Semi factory in Nevada next month. The Tesla Semi account posted the announcement on X, sharing a graphic titled “Semi Rollout” with a date of September 24. No further details were given about the format of the event or who would attend.

While Tesla’s dedicated Semi plant in Sparks, adjacent to Gigafactory Nevada, opened back in April, with the first trucks rolling off the high volume line on April 29, the timing for the factory inauguration comes at a surprise. The ribbon cutting event five months into production is a break from how Tesla has usually handled its other factories, where the first truck or car off the line typically served as the milestone moment.

The 1.7 million square foot factory was built as part of a $3.6 billion expansion Tesla announced in early 2023, and it shares a site with the battery cell lines that feed the Semi’s structural pack, a decision meant to remove the supply bottleneck that delayed the truck for years. The plant is designed for 50,000 trucks a year at full ramp. Semi program director Dan Priestley has said production “is now ramping” rather than claiming it has reached scale.

Nine years passed between the Semi’s 2017 unveiling and this stage of production, with the truck slipping from an original 2019 target through hand built pilot units for PepsiCo and a slow build out of the Nevada plant. An inauguration event now gives Tesla a stage to talk up that ramp and reset expectations for how many trucks it can begin delivering at scale.

Advertisement
-

The September date also lines up with the Semi’s next milestone. Tesla confirmed the truck is heading to Europe with a full unveiling at the IAA Transportation trade show in Hannover, Germany, running September 15 through 20. Between the Nevada event and the Hannover reveal, Tesla has roughly a week and a half in September to make the case that the Semi is now a truck being built and sold on two continents rather than tested in a handful of fleets.

Continue Reading

Energy

Tesla launches Powerwall Lease for affordable home backup

Published

on

Credit: Tesla

Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.

Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.

Advertisement
-

This credit lowers the effective cost to roughly $35 per month plus applicable tax.

Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.

The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.

Tesla announces 100k Powerwalls are participating in Virtual Power Plants

Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.

Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.

Advertisement
-

The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.

Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.

Continue Reading