Connect with us

Investor's Corner

Rivian seeks $80B valuation in confidential IPO filing

Published

on

Rivian has filed for its Initial Public Offering (IPO) with the SEC confidentially and is seeking an initial valuation of $80 billion, according to reports.

Rivian, an electric car company headed by founder and CEO RJ Scaringe, is set to deliver its first vehicles in September. Ahead of the first deliveries of the R1T, Rivian has confidentially filed for its IPO, according to Bloomberg. Sources also stated that Rivian would seek an $80 billion valuation, which would make it the sixth-most valuable car company in the world, displacing General Motors with a valuation of $72.22 billion. Daimler is fifth with an $89.76 billion valuation.

Rivian Automotive’s Normal, IL factory. (Photo: Rivian)

Previously, Rivian sought out a $70 billion valuation with its IPO. In May, the company was reported to target this figure instead of the updated $80 billion number that is presently being discussed. In comparison, Tesla’s short-lived attempt to go private in 2018, which resulted in a feud between CEO Elon Musk and the SEC, would have given Tesla a $71 billion valuation with Musk’s targeted $420 share price.

The automaker filed an S-1 form under the radar last week with the SEC, according to sources familiar with the matter. The company expects the offering to be available around Thanksgiving, but timing ultimately depends on SEC approval. The filing is still not published based on the SEC’s EDGAR system filings, which show Rivian’s last interaction with the SEC was in 2012 when it filed a Form D, a notice of exempt offerings of securities.

Rivian R1T in Blue (Credit: Rivian)

Rivian is backed by several high-profile companies, including e-commerce giant Amazon, legacy automaker Ford, and Cox Automotive. The company has raised $10.5 billion from its investors since welcoming private investments for the first time in 2019. Rivian has had multiple billion-dollar funding rounds, with the first taking place in 2020. The company recently rounded up another funding round that was capped with $2.5 billion in private investments.

Rivian will be the first company to bring an all-electric pickup truck to the market when it begins deliveries next month. The company will have plenty of competition in the next few years, as Tesla will start production of the Cybertruck in early 2020, and Ford will introduce its F-150 Lightning EV pickup sometime next year. Additionally, other companies, like Nikola and Lordstown Motors, who have struggled recently with capital issues, could also bring competitive models to the market in the coming years.

Rivian is already looking for a home for its second U.S. production plant despite initial deliveries taking place next month. While the company has not finalized a location, Fort Worth, Texas, seems to be emerging as the frontrunner.

Don’t hesitate to contact us with tips! Email us at tips@teslarati.com, or you can email me directly at joey@teslarati.com.

Advertisement
-

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

Elon Musk

SpaceX turned a heralding moment for Starship into its greatest

Starship reached orbit despite losing an engine, deployed 26 Starlink V3 satellites on Flight 14.

Published

on

By

SpaceX’s Starship reached orbit for the first time on Monday, and for a few nail-biting minutes it looked like it wouldn’t. During ascent on Flight 14, one of Ship 41’s six Raptor engines shut down early, and SpaceX’s livestream host Dan Huot told viewers the team had decided not to commit to orbit. Minutes later, after what Huot described as a lot of conversation in the control room, the final poll came back in favor, and a roughly 19 second burn of a single Raptor pushed the ship into orbit about 170 miles up.

The reversal matters because SpaceX had written the exit ramp into the mission plan. The company said it would only fire the orbital insertion burn if flight controllers confirmed enough backup hardware remained for the deorbit burn, a condition Teslarati laid out ahead of the flight. Losing an engine was exactly the scenario that rule was built for.

Pressing forward fits Elon Musk’s history. Falcon 1 failed three straight times before its fourth launch reached orbit in 2008, with SpaceX nearly out of money, and Starship was developed by flying prototypes until they broke. What changed this year SpaceX going public, and with $SPCX sliding below its IPO price in July when Flight 13 slipped, the short interest climbed significantly, as Teslarati reported at the time. A Starship potentially lost today with revenue generating next-gen Starlink satellites aboard would have landed directly on shareholders.

That pressure showed up after orbit. SpaceX cut a flight planned to last nearly 10 hours to about three, moving splashdown from west of Chile to the North Pacific near Hawaii. SpaceX gave no reason, though Musk said this month the company was being extremely cautious about debris risk. The single Raptor for deorbit worked, and Ship 41 completed its flip and landing burn before breaking apart in the water, an outcome SpaceX expected. Musk has structured SpaceX’s governance to shield long term bets from market pressure.

Advertisement
-

The payload is the bigger business story. Musk posted that all 26 Starlink V3 satellites deployed and are “operating nominally.” Each V3 is rated for about 1 Tbps of downlink and 160 Gbps of uplink, so this single launch adds roughly 26 Tbps, about 10 times what a Falcon 9 load of V2 Mini satellites adds. The V3 is too large for Falcon 9, making Starship the only vehicle that can build out the planned 100,000 satellite constellation, at up to 60 per flight once it reaches routine service. Unlike the 20 V3 units on Flight 13, which reentered on a suborbital path, these will raise their orbits and could begin serving customers within weeks and bring in hundreds of millions of additional dollars in projected Starlink revenue.

SpaceX has already begun winding down Falcon 9 Starlink launches from Florida in favor of Starship. Reported targets put Flight 15 as early as October 19, leaving about three weeks to diagnose Monday’s engine shutdown before the next orbital attempt.

Continue Reading

Elon Musk

SpaceX just got the green light Starship has waited years for

The FAA has cleared Starship Flight 14, setting up SpaceX’s first orbital attempt on Monday.

Published

on

By

SpaceX has cleared the last regulatory hurdle standing between Starship and its first trip to orbit. The Federal Aviation Administration issued the launch license for Starship Flight 14 late Saturday, keeping the mission on track for liftoff Monday, September 28, from Pad 2 at Starbase, Texas.

The 75 minute launch window opens at 7:15 a.m. Central, and Boca Chica Beach closures are also scheduled for September 29 and 30 as backup dates. This will be Starship’s first revenue generating mission.

The license was the missing piece after SpaceX completed a full wet dress rehearsal with Booster 21 and Ship 41 on September 24. At the time, the company said the flight remained on track pending regulatory approval. Because Flight 14 flies an orbital profile, the FAA had to sign off on a modified license that met its safety, payload and financial responsibility requirements.

Observers combing through the new FAA paperwork also noticed that lightning no longer appears among Starship’s listed launch hazards. If that holds, it matters more for where Starship is headed than for Monday’s attempt. Florida and Louisiana, home to LC-39A and the planned Starbase Louisiana site, see some of the most frequent lightning in the United States.

SpaceX tells the FCC that Starship Flight 14 is going to orbit

Flight 14 is the mission SpaceX has been building toward for months. Ship 41 will carry 26 Starlink V3 satellites, the first operational V3 units to be deployed, and attempt roughly six orbits at about 275 kilometers over a flight lasting just under 10 hours. SpaceX says the ship will only perform its orbital insertion burn after flight controllers confirm enough hardware redundancy remains for the deorbit burn at the end of the mission. Ship 41 is targeting a splashdown in the Pacific west of Chile, while Super Heavy will return to the Gulf of Mexico.

The date carries some symbolism as well. A Monday launch would come 10 years and one day after Elon Musk first presented the Interplanetary Transport System, the design that became Starship, at the International Astronautical Congress in Guadalajara, Mexico.

Advertisement
-

SpaceX has not announced what comes next, but air traffic planning slides reported this week, list Flight 15 no earlier than October 19 and a first Starship launch from LC-39A in Florida no earlier than October 30. Both dates depend on how Monday goes.

Continue Reading

Investor's Corner

Tesla Optimus Gen 3 shows off a cleaner, factory-ready design in new app discovery

Renders hidden inside Tesla’s Android app show Optimus Gen 3’s design before any official reveal.

Published

on

By

Tesla Optimus Gen 3 [Credit: Tesla]

Tesla may have accidentally given a first look at its newest Optimus Gen 3 humanoid robot when photos were found in the Tesla smartphone app.

Design files tucked inside a recent Android version of the Tesla app appear to show the third generation humanoid robot next to the older Gen 2.5 prototype. The assets were extracted from the app package by Tesla community member @wholemars, who posted the renders on X late Tuesday night before deleting them. The Tesla Newswire reshared the side by side comparison on Wednesday, and the images have circulated widely since.

Tesla Optimus Gen 2.5 vs Gen 3 comparison via @WholeMars on X

Tesla Optimus Gen 2.5 vs Gen 3 comparison via @WholeMars on X

The files are labeled “gen3” and were built as models for Tesla app’s own interface, as validated directly by Grok to be official.

The comparison shows a robot that looks built for a factory line rather than a lab bench. Gen 2.5’s exposed mechanical linkages and gold plating on the knees and shins are gone. In their place, Gen 3 uses matte black fairings on the lower legs, paired with a more contoured champagne gold body. Flexible covers now seal the joint where the torso meets the upper thighs, keeping bearings and moving parts sealed from debris and unnecessary contact.

The body panels fit more tightly, and the hands, which Tesla has said carry 22 degrees of freedom, look far more refined than those on earlier units.

This most recent leak fills a gap Tesla has left open for most of the year. Elon Musk said on March 31 that Optimus 3 was walking around but needed “some finishing touches” before it could be shown, a delay Teslarati covered when Tesla missed its first quarter reveal target. Musk later said Tesla would hold the design back until closer to production, partly to keep competitors from copying it. No reveal date has been announced.

The app itself has been preparing for Optimus for months. In July, code in the Tesla app pointed to a dedicated robot phone key, a consent screen for collecting video and spatial data while Optimus works inside a home, and an alert system for low battery and mechanical faults. Finished 3D models of Gen 3 suggest the interface owners will eventually use is moving past placeholder code toward something Tesla intends to ship.

Manufacturing is moving in parallel. Tesla tore out the original Model S and Model X lines at Fremont this summer to make room for Optimus production, with a planned capacity of one million robots a year. At Giga Texas, the steel frame of a dedicated Optimus factory is nearing completion ahead of a targeted 2027 start, with Musk pointing to an eventual output of 10 million units annually.

Continue Reading