Connect with us

News

Tesla has built 400 Supercharger stalls in Hong Kong

Credit: Tesla Charging | X

Published

on

Tesla has built its 400th Supercharger stall in Hong Kong, as highlighted by the company this week and celebrated with a special wrap.

On Friday, Tesla’s Charging account on X announced building Hong Kong’s 400th Supercharging stall, along with a picture of the charging post that shows a special wrap. The wrap shows text highlighting that it’s the “400th Supercharger in Hong Kong,” along with a special design that highlights the city’s unique skyline.

The Supercharger station is Tesla’s 80th in Hong Kong, and it’s located in Xibaocheng. The company also notes in the post that the stall arrives amidst Hong Kong’s 10-year Supercharger anniversary, and it just so happens to be a V4 charging station.

Credit: Tesla Charging | X

The stall is just the latest of Tesla’s charging stations to sport a special celebratory wrap, as the company often does when reaching an important milestone in a given country or throughout the world.

Last month, for example, Tesla surpassed 2,000 charging stalls in Norway, and it went on to build a stall with a Norwegian flag wrap to celebrate. Similarly, Tesla built its 500th Supercharging post in Denmark in March, including a wrap with the Danish flag.

Arguably the most notorious of these celebratory wraps came when Tesla built its 50,000th Supercharger stall worldwide, after which the company posted a photo of the stall painted in Ultra Red and debuted a scavenger hunt of sorts for owners to find the new site’s location. The Supercharging stall turned out to be located in Roseville, California, after Tesla owners discovered it in just a few days.

Tesla installed its first V4 Supercharger in Asia last October, as located on Hong Kong Island at the Lee Garden One hub in Causeway Bay. The company has been slowly rolling out the next-gen technology in multiple markets, and while most of the locations still only charge at V3 speeds, Tesla has been starting to experiment with faster charging rates in the U.S.

Advertisement
-

Tesla Superchargers dominate J.D. Power EV Charging Study

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

Elon Musk teases TSMC as potential Terafab partner

Published

on

SpaceX Terafab rendering
SpaceX Terafab rendering

Elon Musk has acknowledged that early discussions with Taiwan Semiconductor Manufacturing Company (TSMC) could bring the company into his ambitious Terafab semiconductor project, signaling a possible partnership with the world’s leading contract chipmaker.

Musk confirmed that early talks are underway, but as of right now, they are “just discussions.” There is no confirmation of a deal nor dismissal of the possibility of one, leaving open the prospect of one of the largest advanced-chip collaborations under discussion in the U.S.

The report that speculated on potential discussions between Terafab and TSMC comes from Tim Culpan, who outlined a few ways the collaboration could operate. One is TSMC using the project as an “anchor customer” for future facilities in Texas, potentially contributing process expertise, operational know-how, or capacity while Terafab provides capital, long-term purchase commitments, or both.

Tesla and SpaceX jointly developed the Terafab project, with Intel already participating on the tech side. Elon Musk announced the project in March, and it intends to produce more than one terawatt of AI compute capacity annually once fully built.

Advertisement
-

Elon Musk’s Terafab project locks up massive new partner

Company statements place the first phase at approximately $16.8 billion in cost, with later filings pointing to a total that could reach well into the tens of billions across multiple stages.

Intel joined the effort in April 2026 and is expected to supply its 14A manufacturing process for the full-scale plant.

Musk has said existing suppliers, including Samsung and TSMC, remain important for near-term needs; Tesla already has production arrangements with Samsung for AI5 and AI6 chips, but that future demand from Optimus robots, Cybercab vehicles, and planned space-based data centers will eventually exceed what the global industry can currently deliver.

Terafab is positioned as the long-term answer to that projected shortfall, and Tesla did something similar during COVID to avoid a chip shortage. This is just a much larger-scale solution.

If the partnership were to materialize, it would add TSMC’s industry-leading strategies to a project that already combines Tesla’s and SpaceX’s capital and offtake with Intel’s process technology. For now, the only public confirmation is Musk’s brief acknowledgement that conversations are occurring.

Advertisement
-
Continue Reading

News

Tesla reveals early Robotaxi charging strategy, showing scrappy DNA

Published

on

Credit: Tesla

Tesla’s early strategy for charging units operating within its Robotaxi fleet reveals that the company surely has not lost any of that scrappy DNA that took it from an unlikely success story to the most valuable carmaker in the world.

An observer at a Tesla Supercharger in Austin spotted ten total Robotaxi vehicles arrive: one Cybercab and nine Model Y units. A Tesla employee was waiting at the lot and allowed each unit to park itself; every car that arrived had nobody in it.

Tesla wins FCC approval for wireless Cybercab charging system

The Tesla employee would walk around and plug each car in, adjusting the parking if needed:

Advertisement
-

It’s a very interesting strategy, but extremely understandable at this early point in the Robotaxi program. It’s only been out for about 15 months, and Cybercab just entered the fleet in early September.

On top of that, Tesla is still working tirelessly on its wireless charging apparatus, and a new patent was just published regarding that product last week.

However, this is just another example of how Tesla still has plenty of that scrappy DNA leftover from the “production hell” days, when CEO Elon Musk slept on the floor of the factory, employees were working crazy hours, Tesla was building Sprung Structures to build cars in, and the company was tiptoeing on the brink of bankruptcy.

For now, Tesla is utilizing a simple system for recharging its ride-hailing vehicles, and that is a Tesla employee doing it manually until another solution presents itself. Sure, it’s not the most high-tech thing, and it certainly is not what people might have expected at this point in time, but it works, and it’s keeping the entire suite running.

Advertisement
-
Continue Reading

News

Tesla Robotaxi expands hours, Musk explains why it’s been a challenge

Published

on

Credit: Tesla

Tesla is expanding its Robotaxi service hours by pushing the time back by one hour, keeping the ride-hailing service operational until 11 p.m., one hour later than previously.

CEO Elon Musk confirmed the change and offered a specific reason the expansion has been gradual: the system still needs to reliably avoid small pets that are difficult to see after dark, as they commonly blend into the color of the road, especially when they’re grey.

The latest adjustment restores only a fraction of the operating window the service once held. When paid Robotaxi rides began in Austin on June 22, 2025, vehicles ran from 6 a.m. to midnight.

Tesla Robotaxi will be a 24/7 service: here’s when

In September 2025, Tesla lengthened the day to a 2 a.m. close, producing a 20-hour window that stayed in place for most of the following year. By early August of this year, the cutoff had already been pulled back; an August 26 update formalized hours of 6 a.m. to 10 p.m. across Austin and several other markets.

The October move to 11 p.m. therefore leaves the Austin day one hour shorter than the original launch schedule and three hours shorter than the 2025 peak.

Advertisement
-

Musk addressed the constraint directly after the announcement. “The main thing we’re trying to solve is making sure that we don’t run over pets when they’re hard to see at night,” he wrote. “Literally trying to avoid grey kittens on grey tarmac in the dark.”

The example points to a low-contrast perception problem in which a small animal can blend into the road surface under limited lighting.

Tesla’s vehicles rely on cameras and neural-network processing rather than lidar; Musk has previously argued that advanced vision software can extract useful information even in low light by analyzing photon counts, but the pet-detection case remains the stated limiter in later hours.

Advertisement
-

The modest schedule change arrives alongside faster growth in the purpose-built Cybercab fleet. Texas registration data tracked by observers showed the Austin Cybercab count rising sharply in recent weeks, reaching 169 vehicles after more than 100 were added in a short span.

Tesla has indicated that a broader shift toward 24-hour operation is tied to the upcoming FSD v15 software release expected this month on Robotaxi vehicles. Until that capability is validated for the edge cases Musk described, the company continues to add service time incrementally rather than jumping straight to overnight coverage.

The one-hour extension gives Austin riders a later option for evening trips while the underlying detection work continues.

Continue Reading