Connect with us

News

Tesla to lose 64 Superchargers on New Jersey Turnpike in controversial decision

Tesla is set to lose 64 Superchargers on the extremely busy and congested New Jersey Turnpike.

Published

on

Credit: Tesla

Tesla is going to lose 64 Superchargers on the New Jersey Turnpike after a decision by the Turnpike’s governing body was made not to renew its contract with the automaker.

On Friday, Tesla revealed that the New Jersey Turnpike Authority (NJTA) had officially decided to choose a sole third-party provider for its electric vehicle infrastructure. This resulted in the NJTA not renewing its contract to keep Tesla Superchargers on the toll road.

The NJTA also requested, with its decision not to renew with Tesla, that the company decommission all 64 Supercharger stalls, an unprecedented decision that will remove these plugs from the turnpike, making charging more scarce on the busy roadway.

Tesla detailed the situation on Friday:

“The New Jersey Turnpike Authority (“NJTA”) has chosen a sole third-party charging provider to serve the New Jersey Turnpike and is not allowing us to co-locate. As a result, NJTA requested 64 existing Supercharger stalls on the New Jersey Turnpike to not be renewed and be decommissioned.”

Tesla said it has been preparing for the potential that the Turnpike Authority would make this decision for three years by building 116 Superchargers nearby to still supply drivers with reliable charging infrastructure.

Advertisement

The company also noted that its Trip Planner would adjust automatically.

There were also efforts to maintain a relationship that would benefit both the Turnpike and EV drivers who use it.

Tesla said it offered the NJTA various “above-market commercial items,” like an offer to build Superchargers at all New Jersey Service Plazas with equipment upgrades like screens and adapters for those companies who have gained access to its charging piles but need to utilize the NACS and CCS1 plugs.

The decision is one that seemed to baffle the company, especially as infrastructure is one of the biggest concerns among EV skeptics:

Advertisement

“Tesla always advocates for more infrastructure and co-location with additional third-party charging providers. This drives down costs through optionality, and accelerates EV adoption by having sufficient capacity to shoulder peaks. We expect that ~30 times more fast-charging capacity is needed to get to full EV adoption. NJTA’s decision to remove, rather than add, critical charging infrastructure is a setback for New Jersey’s EV adoption goals of 100% Zero-Emission New Car Sales by 2035. It removes Turnpike access to the most reliable (99.9% uptime), least congested (<1% waiters) and cost-effective (~30% lower $/kWh) charging. “

The company said it was more than willing to invest in Turnpike sites if the Authority or New Jersey Governor Phil Murphy wanted to reverse the decision.

Joey has been a journalist covering electric mobility at TESLARATI since August 2019. In his spare time, Joey is playing golf, watching MMA, or cheering on any of his favorite sports teams, including the Baltimore Ravens and Orioles, Miami Heat, Washington Capitals, and Penn State Nittany Lions. You can get in touch with joey at joey@teslarati.com. He is also on X @KlenderJoey. If you're looking for great Tesla accessories, check out shop.teslarati.com

Advertisement
Comments

News

Ford embraces Tesla-style gigacastings and Cybertruck’s 48V architecture

Ford Motor Company’s next-generation electric vehicles will adopt technologies that were first commercialized by the Tesla Cybertruck.

Published

on

Credit: Tesla

Ford Motor Company’s next-generation electric vehicles will adopt technologies that were first commercialized by the Tesla Cybertruck, such as the brutalist all-electric pickup’s 48-volt electrical architecture and its gigacastings. 

The shift is expected to start with a roughly $30,000 small electric pickup that is expected to be released in 2027, which is part of Ford’s $5 billion investment in its new Universal EV platform, as noted in a CNBC report.

Ford confirmed that its upcoming EV platform will move away from the traditional 12-volt system long used across the auto industry. Instead, it will implement a 48-volt electrical architecture that draws power directly from the vehicle’s high-voltage battery.

Tesla was the first automaker to bring a 48-volt system to U.S. consumers with the Cybertruck in 2023. The architecture reduces wiring bulk, lowers weight, and improves electrical efficiency. It also allows power to be stepped down to 12 volts through new electronic control units when needed.

Alan Clarke, Ford’s executive director of advanced EV development and a former Tesla engineer, called 48-volt systems “the future of automotive” due to their lower costs and smaller wiring requirements. Ford stated that the wiring harness in its new pickup will be more than 4,000 feet shorter and 22 pounds lighter than that of its first-generation electric SUV.

Advertisement

Apart from the Cybertruck’s 48-volt architecture, Ford is also embracing Tesla-style gigacastings for its next-generation EVs. Ford stated that its upcoming electric vehicle will use just two major structural front and rear castings, compared with 146 comparable components in the current gas-powered Maverick.

Ford CEO Jim Farley has described the effort as a “bet” and a “Model T moment” for the company, arguing that system-level innovation is necessary to lower costs and compete globally. “At Ford, we took on the challenge many others have stopped doing. We’re taking the fight to our competition, including the Chinese,” Farley previously stated.

Advertisement
Continue Reading

Energy

Tesla meets Giga New York’s Buffalo job target amid political pressures

Giga New York reported more than 3,460 statewide jobs at the end of 2025, meeting the benchmark tied to its dollar-a-year lease.

Published

on

Credit: Tesla

Tesla has surpassed its job commitments at Giga New York in Buffalo, easing pressure from lawmakers who threatened the company with fines, subsidy clawbacks, and dealership license revocations last year. 

The company reported more than 3,460 statewide jobs at the end of 2025, meeting the benchmark tied to its dollar-a-year lease at the state-built facility.

As per an employment report reviewed by local media, Tesla employed 2,399 full-time workers at Gigafactory New York and 1,060 additional employees across the state at the end of 2025. Part-time roles pushed the total headcount of Tesla’s New York staff above the 3,460-job target.

The gains stemmed in part from a new Long Island service center, a Buffalo warehouse, and additional showrooms in White Plains and Staten Island. Tesla also said it has invested $350 million in supercomputing infrastructure at the site and has begun manufacturing solar panels.

Advertisement

Empire State Development CEO Hope Knight said the agency was “very happy” with Giga New York’s progress, as noted in a WXXI report. The current lease runs through 2029, and negotiations over updated terms have included potential adjustments to job requirements and future rent payments.

Some lawmakers remain skeptical, however. Assemblymember Pat Burke questioned whether the reported job figures have been fully verified. State Sen. Patricia Fahy has also continued to sponsor legislation that would revoke Tesla’s company-owned dealership licenses in New York. John Kaehny of Reinvent Albany has argued that the project has not delivered the manufacturing impact originally promised as well.

Knight, for her part, maintained that Empire State Development has been making the best of a difficult situation. 

“(Empire State Development) has tried to make the best of a very difficult situation. There hasn’t been another use that has come forward that would replace this one, and so to the extent that we’re in this place, the fact that 2,000 families at (Giga New York) are being supported through the activity of this employer. It’s the best that we can have happen,” the CEO noted. 

Advertisement
Continue Reading

News

Tesla avoids California sales suspension after DMV review

The agency confirmed Tuesday that Tesla has taken “corrective action.”

Published

on

(Credit: Tesla)

Tesla will not face a 30-day sales suspension in California after the state’s Department of Motor Vehicles (DMV) stated that the company has come into compliance regarding the marketing of its automated-driving features. 

The agency confirmed Tuesday that Tesla has taken “corrective action” following a prior ruling over how it promoted Autopilot and Full Self-Driving (FSD), as noted in a Bloomberg News report.

The California DMV had previously given Tesla 90 days to address concerns that were raised by an administrative judge. Regulators had alleged that Tesla overstated the capabilities of its driver-assist systems, which were branded as Autopilot and Full Self-Driving.

A potential 30-day suspension of vehicle sales in California was on the table if Tesla had failed to comply. On Tuesday, however, the DMV stated that Tesla had met the requirements to avoid that penalty, though it did not provide detailed specifics about the changes that were made.

Advertisement

That being said, Tesla did discontinue its standalone Autopilot product in January and has ramped the marketing of its most advanced driver-assistance package available to consumers today, Full Self Driving (Supervised). From its naming, FSD (Supervised) clearly emphasizes that the system, despite its advanced features, still requires driver attention.

Following reports of a potential sales ban in California, Tesla clarified the matter on X, stating that the issue “was a ‘consumer protection’ order about the use of the term ‘Autopilot’ in a case where not one single customer came forward to say there’s a problem.” Tesla also noted that “Sales in California will continue uninterrupted.”

Tesla has not issued a comment about the matter as of writing.

Continue Reading