News
Tesla is looking to grow its headcount in nearly every division of the company
Elon Musk may have expressed concerns about the US economy earlier this year, but according to job listings on Tesla’s website, the most valuable automaker in the world is now trying to grow its headcount in nearly every division of the company.
Back in June, Musk noted that he had a “super bad “feeling about the economy. Tesla then went and initiated optimization efforts on its workforce, resulting in some layoffs. Musk later tweeted that despite these efforts, Tesla’s overall headcount should rise over the following 12 months.
Since the middle of June, when Reuters started tracking Tesla job listings, the electric vehicle maker has added about 50% more jobs to its Careers page. This past week alone, Tesla’s total job listings on its Careers page totaled over 6,900. This is close to the 2022 peak of over 7,400 job listings from May. Tesla’s job openings saw a steep dive in June and July as the company optimized its workforce.
Since July, however, job listings for Engineering & Information Technology, Vehicle Service, and Manufacturing saw a massive resurgence, accounting for the vast majority of openings across 17 categories in Tesla’s Careers page. Vehicle Service alone saw a jump of over 40% to over 1,600 listings this week. Manufacturing jobs, on the other hand, saw a 20% rise from June to October.
Interestingly enough, openings for Solar, Energy, Charging, and Sales-related jobs increased more quickly than those for Manufacturing, with postings in the Energy – Solar & Storage and Charging categories growing 3x since late June. Job listings for Autopilot and Robotics almost doubled this week as well after hitting a relatively low point in July. This seems to be in line with the company’s efforts in its Full Self-Driving and Optimus programs.
So far, Tesla’s massive hiring spree appears to be focused on the United States, with about 75% of the job openings on the company’s Careers website representing US-based positions. However, a generous number of openings are also available in Germany, where Giga Berlin is located, and Canada, which is rumored to be the site of a new facility. Tesla China also has over 200 job openings on its own website.
Tesla’s mass hiring initiative comes as other automakers adopt a rather conservative stance on their workforce. It should be noted that almost 90% of global CEOs surveyed by KPMG anticipate a recession over the next 12 months, with nearly half considering employment cuts in their respective companies.
Don’t hesitate to contact us with news tips. Just send a message to simon@teslarati.com to give us a heads up.
News
Tesla unveils juicy new detail on the Roadster and hints at new unveil timeline
Tesla unveiled a juicy new detail on the Roadster, its long-delayed supercar project, and additionally hinted at a new unveiling timeline, as it appears yet another month will pass without seeing the capabilities of the vehicle.
Vice President of Vehicle Engineering at Tesla, Lars Moravy, revealed on the Ride the Lightning podcast that the Roadster will be built at Gigafactory Texas, adding that “you’ll start to see a lot of things unfold in the next months.”
While we get a good detail on the plant of manufacture, we also get another letdown, as it appears the unveiling event will not take place in May, as CEO Elon Musk hinted during the Earnings Call.
Franz von Holzhausen revealed in the Ride the Lightning podcast that the Tesla Roadster will be built at Gigafactory Texas https://t.co/t9Bu9k824Q pic.twitter.com/TT01IWJaFD
— TESLARATI (@Teslarati) May 24, 2026
The Roadster was first unveiled back in 2017, alongside the Semi, which entered production earlier this year. It was Tesla’s attempt at a true supercar; it would be rare, expensive, and lightning quick, among other incredible capabilities, like potentially hovering for a short period thanks to a collaboration project with SpaceX.
However, the vehicle was set to be delivered in 2020. Parts and supply chain issues due to the COVID-19 pandemic started these delays, and since then, Tesla, and specifically Musk, have wanted to push the capabilities of the Roadster to somewhere the human mind may not be able to currently comprehend.
Both Chief Designer Franz von Holzhausen and Moravy have said many things about the Roadster over the past few years, hinting that the car truly could be worth the wait. However, the continuous delays we’ve seen have undoubtedly been discouraging.
With that being said, it’s not like Tesla has been doing nothing. Instead, the company has been focusing on revamping current models, phasing out others, and working on developing the cars of the future, specifically, the Cybercab, which entered production at Giga Texas in April.
Despite the Roadster’s delays, there is still a ton of anticipation for the vehicle to be released. It will have a steering wheel, as Musk said it will be “the best of the last of the human-driven cars.”
Elon Musk
NASA just gave SpaceX more crew missions because Boeing can’t certify
NASA has filed a procurement notice announcing its intent to add six post-certification missions to SpaceX’s existing Commercial Crew Transportation Capability contract. The agency said it would order up to three of those missions immediately upon adding them to the contract, with the remaining three available as needed through the end of the International Space Station’s planned operations in 2030.
The reason for the expansion is straightforward. NASA cited recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, and the ongoing technical challenges of maintaining a reliable crew transportation capability as the driving factors behind the decision. Boeing’s CST-100 Starliner has still not been certified for crewed flights, and a cargo-only Starliner mission was not included on NASA’s most recent mission manifest. With Boeing effectively sidelined for the foreseeable future, SpaceX is the only American company capable of rotating crews to the station.
The history behind this contract tells the fuller story of how SpaceX got here. NASA originally awarded SpaceX its Commercial Crew contract in 2014 for $2.6 billion. In 2022 NASA modified the contract to add five missions covering Crew-10 through Crew-14, worth $1.436 billion, bringing the total contract value at that point to $4.9 billion. The recent May 18 filing by NASA extends that runway further, with Crew-12 currently docked at the station and Crew-13 assigned and targeting a mid-September 2026 launch.
According to a report by SpaceNews, NASA stated in its filing: “It is necessary to award additional PCMs to SpaceX given the recently shortened ISS mission durations, technical issues and schedule delays encountered by Boeing, the allocation of missions between Boeing and SpaceX, NASA’s projections for when an alternative crew transportation system may become available, and the ongoing technical challenges of maintaining a reliable capability for crewed flights to ISS.”
No dollar value for the new six missions has been publicly confirmed yet, but based on the 2022 precedent of roughly $287 million per mission, the new block could represent close to $1.7 billion in additional contract value. With SpaceX simultaneously preparing Starship as NASA’s Artemis lunar lander, filing its S-1 for a June IPO, and now absorbing more ISS crew rotation work, the company’s role as the primary contractor for American human spaceflight is no longer a matter of circumstance. It is NASA policy.
Energy
Zuckerberg’s Meta taps Musk’s Tesla for massive clean energy project
In a notable intersection of Big Tech powerhouses, Meta, led by Mark Zuckerberg, has partnered with Canadian energy infrastructure giant Enbridge on a significant renewable energy initiative that will rely on battery technology from Elon Musk’s Tesla.
The project, which was announced this week, marks another step in Meta’s aggressive push to power its expanding data center operations with clean energy, dispelling many of the complaints people have about them.
This new development is located near Cheyenne, Wyoming, and will feature a 365-megawatt (MW) solar farm paired with a 200 MW/1,600 megawatt-hour (MWh) battery energy storage system, also known as BESS. Tesla is providing the batteries for the project, valued at roughly $200 million.
The story was originally reported by Utility Dive.
This Wyoming project represents the first phase of Enbridge and Meta’s joint “Cowboy Project.” Once operational, it will deliver power to Meta’s regional data centers through Cheyenne Light, Fuel, and Power under Wyoming’s Large Power Contract Service tariff.
This tariff, originally developed in collaboration with Microsoft and Black Hills Energy, is designed specifically for large loads like data centers. It ensures that the renewable supply serves hyperscale customers without impacting retail electricity rates for other users.
The battery system will operate under a long-term tolling agreement, providing dispatchable capacity that enhances grid reliability. During periods of high demand, the utility can access the backup generation, addressing one of the key challenges of integrating large-scale renewables with the explosive growth of data center electricity demand driven by artificial intelligence.
This latest collaboration builds on prior joint efforts between Enbridge and Meta in Texas, including the 600 MW Clear Fork Solar, 152 MW Easter Wind, and 300 MW Cone Wind projects. Together with the Wyoming initiative, the companies have now partnered on roughly 1.6 gigawatts (GW) of combined solar, wind, and storage capacity.
The deal highlights the intensifying demand for reliable, low-carbon power from technology giants. Meta has committed to supporting its data center growth with renewable energy, joining peers like Microsoft and Google in seeking large-scale solutions. Enbridge’s Allen Capps described the project as “one of the larger utility-scale battery installations supporting U.S. data center operations and growth.”
The involvement of Tesla’s battery technology adds an intriguing layer, linking two of the world’s most prominent tech leaders—Zuckerberg and Musk—in the clean energy transition.
As data centers continue to drive unprecedented electricity load growth across the United States, projects like this one illustrate how hyperscalers are turning to strategic partnerships with traditional energy players and innovative storage solutions to meet both sustainability goals and reliability needs.