Tesla’s liquid-cooled charging connector patent paves way for the Semi’s Megachargers

The Tesla Semi visits Yandell Truckaway. (Photo: Arash Malek)

Published

on

A recently published patent application from Tesla suggests that the electric car maker is continuing in its efforts to improve its already-stellar Supercharger Network. The design outlined in the document, which features a liquid-cooled charging connector, can potentially pave the way for a more ambitious charging infrastructure, perhaps one that can specifically cater to the all-electric Semi’s Megacharger Network. 

During the all-electric truck’s unveiling, CEO Elon Musk mentioned that the Semi will be able to replenish as much as 400 miles of range in as little as 30 minutes thanks to a network of Megachargers. Neither Musk nor Tesla provided the specs of the Megacharger during the vehicle’s unveiling, though speculations were high that network might provide a power output that is several times more powerful than the company’s Supercharger V2 Network, which had an output of around 120 kW then (Supercharger V2 stations have since been improved to 150 kW).

Being a large vehicle, the Semi requires a lot of power for its charging needs, involving the rapid transfer of mass amounts of electricity in a very short period of time without encountering any heating issues. This is a key concept outlined by Tesla in its recently published patent, titled “Liquid-Cooled Charging Connector,” which involves the use of a liquid cooling system on a charging connector itself. Tesla describes its concept in the discussion below. 

An illustration of Tesla’s liquid-cooled Supercharger design. (Credit: US Patent Office)

“To transfer energy faster and decrease charging times, the cable and charging connector must be capable of withstanding high current loads. Current charging connectors are limited in the current loads that they can support as their ability to dissipate heat is limited. Thus, there is a need for a new charging connector to solve the aforementioned problems.

“The present disclosure related to a new charging connector. The charging connector has a first electrical socket and a second electrical socket. A first sleeve is concentrically coupled to the first electrical socket and a second sleeve is concentrically coupled to the second electrical socket. A manifold assembly encloses the first and second electrical sockets and the first and second sleeves, such that the first and second sleeves and manifold assembly create a hollow interior space there between. The manifold assembly has an inlet conduit and an outlet conduit such that inlet conduit, interior space, and outlet conduit together create a fluid flow path. 

“Cooling fluid flows through the fluid flow path and cools the charging connector. During operation, the cooling fluid bifurcates into a first fluid stream which flows around the first sleeve, and a second fluid stream which flows around the second sleeve. The first and second fluid streams combine upstream of the outlet conduit. The first sleeve encloses the first electrical socket, and the second sleeve encloses the second electrical socket. The cooling sleeves are made from a thermally conducting material such that heat generated by electrical sockets can be removed by the cooling fluid. In embodiments, this thermally conducting material is a thermally conductive plastic material.” 

Tesla notes that its liquid-cooled supercharger connector does not only allow faster charging; it also makes the routing of wires in a charging connector much more efficient. This means that Tesla’s Supercharger connectors could eventually be smaller and more compact despite being capable of greater output. An example of this appears to be hinted at by Supercharger V3’s liquid-cooled cables, which are smaller and more compact than those used in Tesla’s V2 Network. 

Advertisement
-
An illustration of Tesla’s liquid-cooled Supercharger design. (Credit: US Patent Office)

“Cooling fluid absorbs thermal energy from heat in the electrical sockets 404, 406. Sleeves 410, 412 are made of a thermally conducting, electrically insulating material. Heat from the electrical sockets 404, 406 is transferred to cooling fluid through sleeves 410, 412. After flowing around hollow interior space 416, the first fluid stream 804 and the second fluid stream 806 combine together upstream of outlet conduit 514 and flow outside of manifold assembly 414 through outlet conduit 514. Cooling fluid flowing out of manifold assembly 414 through outlet conduit 514 may be received by a reservoir (not shown) which may provide for heat exchanging arrangements. A heat exchanger may be provided to take away heat absorbed by cooling fluid. After rejecting absorbed heat, the cooling fluid may be recirculated back to inlet conduit 512 for further cooling of charging connector 210.

“FIG. 9 shows another component included by charging connector 210. A Printed Circuit Board Assembly (PCBA) 902 is thermally coupled to charging connector 210. In embodiments, PCBA 902 is a two-part structure. A first part of PCBA 904 is coupled to charging connector 210 such that the first part of PCBA 904 sits on top of electrical sockets 404, 406. A second part of PCBA 908 is connected to the first part of PCBA 904 through a rigid-flex PCB construction, or other similar interconnects. The two-part structure of PCB A 902 allows for a more efficient routing of electrical wires of charging connector 210, and overall size of charging connector 210 may be conveniently reduced.”

Tesla’s Superchargers are among the fastest and most expansive electric vehicle charging infrastructures in the auto industry. In keeping with its spirit, the company has made it a point to never stop innovating, as exhibited by the company’s debut and ongoing ramp of its Supercharger V3 Network. This could ultimately pay off for Tesla, whose lead in the electric vehicle race might potentially increase even more. 

Such innovations appear to be required of the company, especially with the rollout of ambitious EVs such as the Semi, a vehicle with a different charging infrastructure compared to Tesla’s existing lineup of electric cars. That being said, Tesla nevertheless deserves credit for pushing the envelope and staying on top of its innovations. In the electric vehicle race, after all, a liquid-cooled charging connector could end up making the difference between the fast-charging capabilities of the Tesla Semi and rivals from Daimler and Nikola.

A link to the full text of Tesla’s liquid-cooled charger connector patent could be accessed here.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

News

Starlink Mini 2 arrives with one feature for true off-grid connectivity

Published

on

Credit: SpaceX

SpaceX officially launched the Starlink Mini 2 on November 10, delivering the first portable Starlink terminal designed around independent power.

Invitation-only preorders for select U.S. customers are priced at $999 plus tax, a figure that includes a full year of Roam Unlimited service valued at roughly $2,100. A refundable $100 deposit reserves the kit, with the balance due at shipment, expected to begin in mid-December. Broader availability is listed as coming soon.

Advertisement
-

The headline feature is the quick-swap 71 Wh battery. Clipped to the rear of the dish without tools, it delivers up to 4.5 hours of connectivity on a single charge.

The 490-gram pack includes its own USB-C port and LED indicators, so users can charge a spare separately and swap it in seconds while staying online. Starlink notes that the terminal can continue operating while the battery charges or run directly from a 60 W USB-C source. The retail box includes one battery, a 60 W USB-C charger, and a 3-meter cable.

Beyond power, the Mini 2 is thinner at 23.1 mm (versus 38.5 mm on the original Mini) while measuring 263 × 314 mm. With the battery and kickstand attached it weighs 1.6 kg.

Built-in Wi-Fi 6 expands coverage to up to 1,800 square feet, an IP67 rating protects against dust and water, and a standard 1/4-20 tripod thread plus physical power button round out the design. Field of view remains 110 degrees, and the unit retains support for mobile use.

For travelers, campers, and remote workers, the swappable battery removes the longstanding requirement for an external power bank or vehicle outlet that defined the first Mini. Spare packs sold separately further extend runtime, turning the compact terminal into a more self-contained solution.

While the bundled $999 invitation price sits well above the original Mini’s current $149 starting point, the included year of service and genuine untethered operation mark a clear step forward in portable satellite internet.

Advertisement
-
Continue Reading

Elon Musk

SpaceX’s $24B Starbase supercomputer plan slipped past a key roadblock

SpaceX wants a Starbase tax break for a $24 billion gas plant and supercomputer campus.

Published

on

By

Concept rendering of SpaceX President Gwynne Shotwell overlooks the company’s Hawthorne, California headquarters as an American flag flies over the campus at sunset.

SpaceX is asking its own company town for a tax break on a $24 billion natural gas power plant and supercomputing facility at Starbase, Texas, and the land it picked sits just outside the reach of a data center moratorium that took effect in neighboring Brownsville last week.

A City of Starbase public hearing notice says SpaceX “proposes to construct, own, and operate a gas-fired power plant and super-compute facility” on roughly 444 acres between Boca Chica Boulevard and the Port of Brownsville. The $24 billion figure covers only the initial phases, and the notice leaves room for future expansions. The Starbase City Commission will consider a property tax abatement and a related economic development agreement at a 7 p.m. hearing on December 9. The notice does not disclose the size or length of the abatement, or how much computing capacity the site would hold.

The location has a history. Over the summer, SpaceX asked Brownsville to remove the tract from its city limits and offered $220 million for water and wastewater projects in return. Brownsville approved the move in August, and Starbase later annexed the land. Brownsville’s own 90-day pause on data center applications took effect last week, and had the tract stayed inside the city, the project likely would have needed a different home.

The power side is already in front of state regulators. SpaceX has applied to the Texas Commission on Environmental Quality for air permits covering 35 mobile gas turbines producing roughly 750 megawatts, according to Politico, which also noted that two of the three Starbase commissioners voting on the incentives are SpaceX executives.

Building its own plant lets SpaceX skip the Texas grid. Gov. Greg Abbott paused new data center grid connections in August pending an audit, but a facility that generates its own electricity does not need one. The air permit still has to clear the TCEQ, where Abbott also ordered a halt on data center permits.

Advertisement
-

The bigger test arrives in January. Governor-elect Gina Hinojosa, who unseated Abbott last week, has said she will block data center approvals until the legislature passes new protections, and she has already asked state officials to hold off on any sale of Boca Chica State Park to SpaceX until she is sworn in. Tesla and SpaceX shares both fell the day after the election, and Musk’s first reaction on X was “Data centers in space looking pretty appealing right now.”

That line points to Starmind, SpaceX’s orbital compute constellation. Musk has said terrestrial compute will be “peanuts compared to orbital compute” and expects monthly orbital deployments to pass ground deployments around the end of 2028, as Teslarati reported. Until then, SpaceX still needs gigawatts on the ground. It ended the third quarter with 1.7 GW of nameplate compute, is targeting 2.5 to 3 GW by the end of this year and wants at least 10 GW more in 2027. Its existing Colossus sites around Memphis already run on gas turbines and face a lawsuit from residents over emissions.

Local reaction is split. The South Texas Environmental Justice Network has announced a protest, citing air quality, water use and energy bills, while some Brownsville residents told the Tribune they welcome the jobs. SpaceX did not respond to the Tribune’s questions about the project.

Continue Reading

Elon Musk

Tesla extends Cybertruck production as Musk concedes ‘sentimentality’

Published

on

Credit: diagnosticdennis/Instagram and @smile__no via Tesla Owners of Santa Clarita Valley/X

Tesla CEO Elon Musk announced that the company will extend Cybertruck production slightly to handle its extensive order backlog.

On Wednesday, Musk announced that “In order to work through more of the Cybertruck order backlog, production will be extended through the end of summer 2027.”

Tesla has already attempted to simplify its last months of production for the Cybertruck by eliminating several trim levels and only offering the Cyberbeast, the most expensive trim that starts at $109,990. The other two trim levels, the Cybertruck All-Wheel-Drive and Premium All-Wheel-Drive have both been discontinued.

There has been plenty of backlash against Tesla’s decision to ax the Cybertruck, but the company’s forecast prioritizes Cybercab and autonomy. Factory space at Gigafactory Texas that is not necessary is now being set aside for the Cybercab as the company truly embraces its “transportation-as-a-service” model.

There is still a slim chance the Cybertruck survives. Last evening, Tesla upfitter Unplugged Performance offered to take the Cybertruck line off of Tesla’s hands and continue building it, along with a CyberSUV.

Nevertheless, Tesla seems to be ending the Cybertruck on its terms after what will be a three-and-a-half-year run. It still does not really feel quite real; I think many of us thought the Cybertruck would be around for years to come.

Musk added more detail, stating that while it was not the smartest move, “there must be some room in this world for sentimentality or what’s the point?”

Other EV pickups on the market have experienced a similar fate.

The Ford F-150 Lightning was axed by the Detroit company due to the continued losses the company took from sales. That truck was never profitable, and Ford is still taking a quarterly loss in its EV side. However, things are moving along as it has plans for a mass market EV pickup, which will likely gather some substantial demand if Ford can get it just right.

Perhaps another extension or even a total change of heart might come. Only Musk knows.

Continue Reading