News
Elon Musk’s Boring Company begins Tesla FSD testing in Las Vegas tunnels
The update was shared by Las Vegas Convention and Visitors Authority (LVCVA) CEO Steve Hill.
The Boring Company has started testing Tesla’s Full Self-Driving (Supervised) system in its Las Vegas tunnels.
The update was shared by Las Vegas Convention and Visitors Authority (LVCVA) CEO Steve Hill in a comment to Fortune.
Controlled FSD testing
In his comments, Hill noted that Tesla’s FSD tests in the Boring Company’s underground tunnels in Las Vegas have been going on for months. However, the full-self driving Teslas have reportedly not been carrying passengers during the tests. Interestingly enough, Hill noted that the FSD-driven vehicles have not had any incidents in the Boring Company tunnels yet, though safety drivers have been required to intervene “periodically.”
Hill further noted that the self-driving Teslas have found some spots that seem quite difficult in the underground tunnels system. The LVCVA CEO added that the rock walls of the Boring Company tunnels and their colorful lighting have created some “interesting but odd lighting” for FSD. That being said, Hill noted that the FSD tests are ongoing, though the LVCVA will likely be a consultant before the self-driving vehicles’ safety drivers are removed.
The executive, however, noted that it will only be a matter of time before the Teslas in Las Vegas’ Boring Company tunnels are operating without a driver. “Sooner or later, this is going to be autonomous,” Hill said.
Vegas Loop updates
The Boring Company’s underground transit system has been operating beneath the Las Vegas Convention Center for about four years. While the network is slated for expansion across more of the city, it currently connects the convention grounds with a handful of nearby hotels. Updates from the Boring Company’s official social media account on X suggests that tunneling is underway across other stops in Las Vegas.
As per the Boring Company on its official website, the greater Vegas Loop, when completed, will have 104 stations across 68 miles of tunnels. This should allow the underground system to serve an estimated 90,000 passengers per hour. It will also be able to connect key locations across the city, such as Harry Reid International Airport, Allegiant Stadium, and downtown.
While the Vegas Loop is nowhere near complete, Hill noted that the system is already well appreciated by residents and visitors. As per the LVCVA CEO, the underground transport system is the “highest rated feature we have” at the Convention Center. “People love it,” he said, adding that the only reason the tunnels are not coming faster is due to holdups with permits. “We’re holding them back. They’re not holding us back,” he stated.
Investor's Corner
Tesla unfolded its first European “folding Supercharger”
Tesla’s folding Supercharger just arrived in Europe and it changes how fast charging expands.
Tesla’s Folding Unit Supercharger has officially landed in Europe, with the company teasing a new installation in its effort for a broader rollout targeting major motorway rest stops across the European continent in Q3 2026. The arrival marks a notable shift in how Tesla is thinking about network expansion, moving from hardware performance alone to engineering the logistics chain itself.
While Tesla did not reveal the exact location for the new folding Supercharger in Europe, the photo shared on X heavily suggests that this maybe somewhere in Norway. Historically, whenever Tesla rolls out an entirely new infrastructure architecture in Europe, whether it was the original Supercharger stalls years ago or these brand-new modular V4 “Folding Units”, Norway is almost always the designated launch pad because of its unmatched EV adoption rate and supportive infrastructure
The Folding Unit, introduced in March 2026, is a factory pre-assembled V4 charging station built on an industrial hinge system mounted to a heavy-duty concrete base. The entire assembly arrives on site ready to unfold and connect. Tesla confirmed the units feature telescopic light poles specifically designed for easy transportation and fast on-site deployment, a detail that signals how carefully the logistics chain has been engineered alongside the hardware itself. The design allows 33% more stalls per delivery truck, cuts installation time roughly in half, and reduces overall deployment costs by more than 20% compared to traditional installations.
Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet
Tesla also noted telescopic light poles which provide benefits over traditional Supercharger installations that require fixed-height poles that are awkward to ship, slow to position on site, and often require separate crews and equipment to erect before charging hardware can even be staged. By engineering poles that compress for transit and extend on arrival, Tesla has removed one of the quieter bottlenecks in the physical deployment process. Every hour saved on a light pole installation is an hour redirected toward getting stalls energized. At scale, across dozens of new sites per quarter, those hours add up to a meaningful acceleration in how quickly a location goes from approved permit to serving its first customer.
Each Folding Unit pairs a single V4 power cabinet with eight charging posts. The V4 cabinet delivers up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, supporting twice the stalls per cabinet at three times the power density of its predecessor. Longer cables make every new station immediately usable by non-Tesla vehicles, a priority as Tesla continues opening its network to Ford, GM, Rivian, Hyundai, Stellantis, and others.
As Teslarati reported when the Folding Unit was first unveiled, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet in March 2026 after more than seven years and 15,000 units, completing a full pivot to V4 production. The European arrival of the folding design is the next chapter in that transition.
Faster and cheaper deployment means Tesla can justify building in markets and corridors that were previously too expensive to serve, filling the coverage gaps that have slowed EV adoption outside major urban centers.
First Folding Unit Superchargers in Europe 🇪🇺 https://t.co/KNfYWJukkL pic.twitter.com/YR1udIpH1i
— Tesla Charging (@TeslaCharging) June 10, 2026
News
Tesla stuns with another FSD approval in Europe, its second in two days
Tesla has stunned by gaining yet another approval for its Full Self-Driving suite in Europe, its second in two days and its fifth overall.
Belgium will be the latest country to allow Tesla owners to utilize FSD on public roads in Europe, joining a quickly growing list that started with the Netherlands, Lithuania, and Estonia.
On Tuesday, Denmark announced its approval of the FSD suite, which has now been followed by Belgium just one day later.
The country’s Minister of Mobility, Annick De Ridder, announced the approval on her X account, stating that she had just signed the approval of Tesla FSD. It now goes to the country’s homologation department for the last step of the approval process.
De @Tesla community houdt hier al geruime tijd de vinger aan de pols over de toelating voor de FSD-technologie op onze Vlaamse en Belgische wegen.
Uit waardering voor jullie niet-aflatende interesse (en aanmoediging 😉), krijgen jullie hierbij de primeur: ik heb net de toelating… pic.twitter.com/Yrps4OHTj8— Annick De Ridder (@AnnickDeRidder) June 10, 2026
The Belgian approval is one of mighty importance because it truly shows how quickly countries in Europe could greenlight the FSD suite consecutively. Approvals are already coming in relatively quickly, which is a great sign.
Perhaps the next big development that could come from FSD approvals in Europe is an approval from a country like England, Italy, France, Spain, or Germany. It would be something to see how FSD would perform in a major European metro, such as London, Barcelona, Madrid, Paris, Rome, or Berlin.
Getting Full Self-Driving in Spain and England will be such huge milestones for Tesla. I am so excited to see how FSD performs in Madrid, Barcelona, and London, specifically.
The ultimate test will always be Mumbai or New Delhi. Excited for India’s eventual approval! https://t.co/paw9Ch1qmL pic.twitter.com/9RdDERVSSJ
— TESLARATI (@Teslarati) June 9, 2026
Full Self-Driving does an excellent job of roaming around major U.S. cities like New York and Los Angeles, but other high-profile international cities of significance would truly mark a line in the sand for Tesla, which can simply enable any vehicle in its customer-owned fleet to run FSD with the correct approvals.
Elon Musk
SpaceX’s Elon Musk relieves worries about orbital data centers
SpaceX CEO Elon Musk recently confronted worries about orbital data centers and launching satellites in mass quantities in space, as some voiced concerns about crowding.
Musk’s SpaceX plans to combat the issue of needing data centers by launching them into space instead of taking up valuable real estate on Earth. It has been a major point of SpaceX’s future, including its looming IPO, which could be the largest ever.
In a recent interview filmed at SpaceX’s Starlink terminal factory in Bastrop, Texas, Elon Musk directly addressed concerns that deploying large numbers of AI satellites for orbital data centers could crowd Earth’s orbit. His message was straightforward and reassuring: space is vast beyond human intuition.
“Space is really big,” Musk said. “It’s not like space is gonna get crowded. Space is enormous. If you actually look at it relative to the Earth, the satellites are so tiny you can’t even see them.” He emphasized that even zooming in makes a satellite appear large, but from a planetary perspective, they are minuscule specks.
Elon on concerns that AI satellites will crowd space:
“Space is really big. It’s not like space is gonna get crowded. Space is enormous. If you actually look at it relative to the earth, the satellites are so tiny you can’t even see them.” https://t.co/Mvr7NpL25Q pic.twitter.com/5Fi629Rii7
— Sawyer Merritt (@SawyerMerritt) June 8, 2026
Musk pointed to SpaceX’s real-world experience operating roughly 10,000 Starlink satellites as evidence that large constellations can be managed safely. “We’ve got a pretty good idea of how to operate just really large constellations and do it safely,” he noted. SpaceX remains the only operator with meaningful experience at this scale, giving the company unique insight into tight orbital packing without compromising safety
The discussion highlighted SpaceX’s plans for “AI1” satellites—essentially orbiting racks of AI compute powered by massive solar arrays and cooled via radiative panels in space’s vacuum.
These satellites leverage proven Starlink V3 technology, making them simpler to design than communications satellites. A first-generation unit targets around 150 kW peak power, with a 70-meter wingspan for solar panels and radiators. Laser links will connect them to each other and the Starlink network, delivering low-latency access (on the order of a few milliseconds from low-Earth orbit).
FCC accepts SpaceX filing for 1 million orbital data center plan
Musk framed orbital data centers as a practical solution to Earth’s constraints on AI growth. Ground-based facilities face power shortages, water demands for cooling, and grid limitations. In space, constant sunlight (no day-night cycle), vacuum radiative cooling, and abundant solar energy offer clear advantages.
Production will ramp up at an expanded “Gigasat” factory in Bastrop, with solar manufacturing already underway and full AI satellite output expected at reasonable volume by the end of 2027. Starship’s rapid, high-volume launch capability, aiming for multiple flights per hour, will make massive deployment feasible.
Critics sometimes raise risks like space debris or Kessler syndrome, but Musk’s response underscores scale: even a million satellites would represent an imperceptible fraction of available orbital volume when viewed against Earth’s size. SpaceX’s automated collision avoidance and deorbiting designs for Starlink further mitigate concerns.
This vision ties into broader ambitions. Musk sees orbital AI compute as a step toward harnessing more of the Sun’s energy, advancing humanity on the Kardashev scale from a Type 0 civilization toward Type 1 and eventually Type 2. By moving power-hungry data centers off-planet, SpaceX aims to unlock orders-of-magnitude more compute while preserving Earth’s resources.
Musk’s comments should ease public anxiety. With proven operational expertise, incremental engineering, and the immensity of space itself, orbital data centers represent not overcrowding, but smart expansion into the final frontier.