Connect with us

News

Tesla’s original home state hits 1 million EV milestone as electric cars become CA’s biggest export

Credit: everything_tesla_pr0/Instagram

Published

on

California officially sold 1 million electric vehicles this month, according to the California Energy Commission (CEC) Chair David Hochschild. California is home to many EV automakers, including Tesla, the leading pure electric car manufacturer in the market today.

“We just hit this month a very significant milestone, reaching 1 million electric vehicles sold in California,” Hochschild said. “There are almost three dozen companies making EVs in the state, which are now its largest export,” said Hochschild during an event hosted by The Washington Post on Monday.

Tesla’s Fremont Factory is located in California. Tesla spearheaded the recent EV revolution, and many credit the company for encouraging legacy automakers and new companies to manufacture electric vehicles. Through its most turbulent years, California was home to Tesla.

During the event, Hochschild emphasized the roles local and state leaders played and continue to play in decarbonization. “Local and state leadership is really how change happens in our world,” Hochschild said. “It’s really from the bottom up. And what we need at the local and state level is support from the national government.”

Advertisement

Ironically, at the height of the pandemic in 2020, Tesla’s CEO threatened to move the company away from California, even filing a lawsuit against Alameda County after officials refused to allow the Fremont Factory to reopen. By the time Musk made the announcement, Tesla had already made several attempts to fulfill the requirements of Alameda County with regards to infection prevention at the Fremont Factory. Tesla has also made several attempts to contact Alameda County to get the green light to open.

Musk made the announcement after California Governor Gavin Newsom delivered new guidance on the pandemic, allowing lower-risk businesses, including those in manufacturing, to reopen with limited operations. Despite Gov. Newsom’s announcements, Tesla was not permitted to reopen while other car manufacturers in the country already restarted operations at a limited capacity.

Tesla still has a strong presence in California, with Elon Musk announcing that the company would be expanding the Fremont Factory’s capacity by 50%. However, Tesla has officially moved its headquarters to the Lone Star state, where Giga Texas will start operations soon. Giga Texas fits the company’s current position as the leader of the EV industry and has ample space to accommodate Tesla’s growing ambitions and future plans.

The Teslarati team would appreciate hearing from you. If you have any tips, reach out to me at maria@teslarati.com or via Twitter @Writer_01001101.

Advertisement

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

Energy

Tesla’s newest “Folding V4 Superchargers” are key to its most aggressive expansion yet

Tesla’s folding V4 Supercharger ships 33% more per truck, cuts deployment time and cost significantly.

Published

on

By

Tesla V4 Supercharger installation ramping in Europe

Tesla is rolling out a folding V4 Supercharger design, an engineering change that allows 33% more units to fit on a single delivery truck, cuts deployment time in half, and reduces overall installation cost by roughly 20%.

The folding mechanism addresses one of the least glamorous but most consequential bottlenecks in charging infrastructure: getting hardware from factory floor to job site efficiently. By collapsing the form factor for transit and unfolding into an operational configuration on arrival, the new design dramatically reduces the logistics overhead that has historically slowed Supercharger rollouts, particularly at large or remote sites where multiple units are needed simultaneously.

The timing aligns with a broader acceleration in Tesla’s network strategy. In March 2026, Tesla’s Gigafactory New York produced its final V3 Supercharger cabinet after more than seven years and 15,000 units, pivoting entirely to V4 cabinet production. The V4 cabinet itself is already a generational leap, delivering up to 500 kW per stall for passenger vehicles and up to 1.2 MW for the Tesla Semi, while supporting twice the stalls per cabinet at three times the power density of its predecessor. The folding transport innovation layers logistical efficiency on top of that technical foundation.

Tesla launches first ‘true’ East Coast V4 Supercharger: here’s what that means

Tesla Charging’s Director Max de Zegher, commenting on the V4 cabinet when it launched, captured the operational philosophy behind these changes: “Posts can peak up to 500kW for cars, but we need less than 1MW across 8 posts to deliver maximum power to cars 99% of the time.” The design philosophy has always been about maximizing real-world throughput, not just peak specs, and the folding transport upgrade extends that thinking into the supply chain itself.

Continue Reading

Elon Musk

The Boring Company clears final Nashville hurdle: Music City loop is full speed ahead

The Boring Company has cleared its final Nashville hurdles, putting the Music City Loop on track for 2026.

Published

on

By

The Boring Company has cleared one of its most significant regulatory milestones yet, securing a key easement from the Music City Center in Nashville just days ago, the latest in a series of approvals that have pushed the Music City Loop project firmly into construction reality.

On March 24, 2026, the Convention Center Authority voted to grant The Boring Company access to an easement along the west side of the Music City Center property, allowing tunneling beneath the privately owned venue. The move follows a unanimous 7-0 vote by the Metro Nashville Airport Authority on February 18, and a joint state and federal approval from the Tennessee Department of Transportation and the Federal Highway Administration on February 25. Together, these green lights have cleared the path for a roughly 10-mile underground tunnel connecting downtown Nashville to Nashville International Airport, with potential extensions into midtown along West End Avenue.

Music City Loop could highlight The Boring Company’s real disruption

Nashville was selected by The Boring Company largely because of its rapid population growth and the strain that growth has placed on surface infrastructure. Traffic has become a persistent problem for residents, convention visitors, and airport travelers alike. The Music City Loop promises an approximately 8-minute underground transit time between downtown and the Nashville International Airport (BNA), removing thousands of vehicles from surface roads daily while operating as a fully electric, zero-emissions system at no cost to taxpayers.

The project fits squarely within a broader vision Musk has championed for years. In responding to a breakdown of the Loop’s construction costs, Musk posted on X: “Tunnels are so underrated.” The comment reflected a longstanding belief that underground transit represents one of the most cost-effective and scalable infrastructure solutions available. The Boring Company has claimed it can build 13 miles of twin tunnels in Nashville for between $240 million and $300 million total, a fraction of what comparable projects cost elsewhere in the country.

The Las Vegas Loop, The Boring Company’s first operational system, has served as a proof of concept. During the CONEXPO trade show in March 2026, the Vegas Loop transported approximately 82,000 passengers over five days at the Las Vegas Convention Center, demonstrating the system’s capacity during large-scale events. Nashville draws millions of convention visitors and tourists each year, and local business leaders have pointed to that same capacity as a major draw for supporting the project.

The Music City Loop was first announced in July 2025. Construction began within hours of the February 25 state approval, with The Boring Company’s Prufrock tunneling machine already in the ground the same evening. The first operational segment is targeted for late 2026, with the full route expected to be complete by 2029. The project represents one of the largest privately funded infrastructure efforts currently underway in the United States.

Continue Reading

Elon Musk

Elon Musk demands Delaware Judge recuse herself after ‘support’ post celebrating $2B court loss

A banner on the post read “Katie McCormick supports this,” using LinkedIn’s heart-in-hand “support” icon, an endorsement stronger than a simple “like.” Musk’s lawyers argue the action creates “a perception of bias against Mr. Musk,” warranting immediate recusal to preserve judicial impartiality.

Published

on

elon musk
Ministério Das Comunicações, CC BY 2.0 , via Wikimedia Commons

Tesla CEO Elon Musk’s legal team has filed a motion demanding that Delaware Chancellor Kathaleen McCormick disqualify herself from an ongoing high-stakes Tesla shareholder lawsuit.

The filing, submitted March 25, cites an apparent LinkedIn “support” reaction from McCormick’s account to a post celebrating a $2 billion jury verdict against Musk in a separate California securities-fraud case.

The move escalates long-simmering tensions between Musk, Tesla, and the Delaware judiciary, where McCormick previously presided over the landmark challenge to Musk’s record $56 billion 2018 compensation package.

Delaware Supreme Court reinstates Elon Musk’s 2018 Tesla CEO pay package

The LinkedIn post was written by Harry Plotkin, a Southern California jury consultant who assisted the plaintiffs who sued Musk over 2022 tweets about his Twitter acquisition. Plotkin praised the trial team for “standing up for the little guy against the richest man in the world.”

The New York Post initially reported the story.

A banner on the post read “Katie McCormick supports this,” using LinkedIn’s heart-in-hand “support” icon, an endorsement stronger than a simple “like.” Musk’s lawyers argue the action creates “a perception of bias against Mr. Musk,” warranting immediate recusal to preserve judicial impartiality.

McCormick swiftly denied intentional endorsement. In a letter to attorneys, she stated she was unaware of the interaction until LinkedIn notified her. She wrote:

“I either did not click the ‘support’ icon at all, or I did so accidentally. I do not believe that I did it accidentally.”

The chancellor maintains the reaction was inadvertent, but critics, including Musk allies, call the explanation implausible given the platform’s deliberate interface.

McCormick’s central role in the Tesla pay-package litigation underscores the stakes. In Tornetta v. Musk, in January 2024, she ruled the 2018 performance-based stock-option grant, potentially worth $56 billion at the time and now valued far higher, was invalid.

The package consisted of 12 tranches of options, each vesting only after Tesla achieved ambitious market-cap and operational milestones. McCormick found Musk exercised “transaction-specific control” over Tesla as a controlling stockholder, the board lacked sufficient independence, and proxy disclosures to shareholders were materially deficient.

Applying the entire-fairness standard, she concluded defendants failed to prove the deal was fair in process or price and ordered full rescission, an “unfathomable” remedy she described as necessary to deter fiduciary breaches.

After the ruling, Tesla shareholders ratified the package a second time in June 2024. McCormick rejected that ratification in December 2024, holding that post-trial votes could not cure defects.

Tesla appealed. On December 19 of last year, the Delaware Supreme Court unanimously reversed the rescission remedy while largely leaving McCormick’s liability findings intact. The high court deemed total unwinding inequitable and impractical, restoring the package but awarding the plaintiff only nominal $1 damages plus reduced attorneys’ fees. Musk ultimately received the full award.

The current recusal motion arises in yet another Tesla derivative suit before McCormick. Legal observers say granting it could signal heightened scrutiny of judicial social-media activity; denial might reinforce perceptions of an insular Delaware bench.

Broader fallout includes accelerated corporate migration out of Delaware, Musk himself moved Tesla’s incorporation to Texas after the first ruling, and renewed debate over whether the state’s specialized courts remain the gold standard for corporate governance disputes.

A decision is expected soon; whichever way it lands, the episode highlights the fragile balance between judicial independence and public confidence in high-profile litigation.

Continue Reading