Connect with us

News

Tesla shares more footage of Optimus walking improvements

Credit: Tesla Optimus/X

Published

on

Tesla has shared its latest clip of the Optimus humanoid robot, once again showing off how smoothly the bot is able to walk around.

On Saturday, Tesla’s Optimus account on X shared footage of the humanoid robot walking around one of its testing facilities, featuring the caption “Getting my daily steps in.” The robot appears to be a newer, or at least more complete, build than a similar video shared a few weeks ago, depicting the robot as it smoothly strides around the area.

Advertisement

In a repost of the video, Tesla’s Head of Optimus Engineering, Milan Kovac, noted that the robot’s walking speed is its fastest yet. Kovac says the unit can now walk at around 0.6 meters per second (~1.34 mph), representing a 30 percent speed boost since the last video had been released. Eventually, Optimus is expected to be able to walk up to five miles per hour.

Advertisement

The post comes just a few weeks after CEO Elon Musk shared another video of a second-generation Optimus prototype walking, showing a more stripped-back version of the technology than the current one as it similarly paced around the facility. It also comes after Tesla opened up 61 Optimus jobs earlier this month, featuring listings for manufacturing and testing engineers, along with a wide range of other related roles.

You can see the video posted by Musk in January below.

Advertisement

Tesla unveiled its Optimus project in August 2021, and Musk last month said that the company could begin shipping the Optimus robots as soon as next year. The robot is being designed to help eliminate dangerous, repetitive and boring tasks for humans, and Musk has also said that the first production versions of the technology will work in Tesla’s factories.

The Optimus program has come a long way since it was unveiled, with recent updates from Tesla showing that prototypes of the robots can already fold laundry, balance well, move their necks, arms and legs, and handle tasks that require fine motor skills and discernment, like sorting blocks into matching categories.

In December, Musk also said he expects Optimus to be able to thread a needle within the next year, and original claims about the humanoid robot’s cost say it could be under $20,000 once Tesla begins selling the units.

Updated 2/25/24: Added Tesla Optimus Engineer’s comments on this being the fastest the robot has walked yet, and embedded the January video for comparison.

Advertisement

Tesla updates Optimus Bot production figures and why they might be lower than expected

What are your thoughts? Let me know at zach@teslarati.com, find me on X at @zacharyvisconti, or send us news tips at tips@teslarati.com.

Zach is a renewable energy reporter who has been covering electric vehicles since 2020. He grew up in Fremont, California, and he currently lives in Colorado. His work has appeared in the Chicago Tribune, KRON4 San Francisco, FOX31 Denver, InsideEVs, CleanTechnica, and many other publications. When he isn't covering Tesla or other EV companies, you can find him writing and performing music, drinking a good cup of coffee, or hanging out with his cats, Banks and Freddie. Reach out at zach@teslarati.com, find him on X at @zacharyvisconti, or send us tips at tips@teslarati.com.

Advertisement
Comments

Elon Musk

SpaceX weighs Nasdaq listing as company explores early index entry: report

The company is reportedly seeking early inclusion in the Nasdaq-100 index.

Published

on

Credit: SpaceX/X

Elon Musk’s SpaceX is reportedly leaning toward listing its shares on the Nasdaq for a potential initial public offering (IPO) that could become the largest in history. 

As per a recent report, the company is reportedly seeking early inclusion in the Nasdaq-100 index. The update was reported by Reuters, citing people familiar with the matter.

According to the publication, SpaceX is considering Nasdaq as the venue for its eventual IPO, though the New York Stock Exchange is also competing for the listing. Neither exchange has reportedly been informed of a final decision.

Reuters has previously reported that SpaceX could pursue an IPO as early as June, though the company’s plans could still change.

Advertisement

One of the publication’s sources also suggested that SpaceX is targeting a valuation of about $1.75 trillion for its IPO. At that level, the company would rank among the largest publicly traded firms in the United States by market capitalization.

Nasdaq has proposed a rule change that could accelerate the inclusion of newly listed megacap companies into the Nasdaq-100 index.

Under the proposed “Fast Entry” rule, a newly listed company could qualify for the index in less than a month if its market capitalization ranks among the top 40 companies already included in the Nasdaq-100.

If SpaceX is successful in achieving its target valuation of $1.75 trillion, it would become the sixth-largest company by market value in the United States, at least based on recent share prices. 

Advertisement

Newly listed companies typically have to wait up to a year before becoming eligible for major indexes such as the Nasdaq-100 or S&P 500.

Inclusion in a major index can significantly broaden a company’s shareholder base because many institutional investors purchase shares through index-tracking funds.

According to Reuters, Nasdaq’s proposed fast-track rule is partly intended to attract highly valued private companies such as SpaceX, OpenAI, and Anthropic to list on the exchange.

Advertisement
Continue Reading

Elon Musk

The Boring Company’s Prufrock-2 emerges after completing new Vegas Loop tunnel

The new tunnel measures 2.28 miles, making it the company’s longest single Vegas Loop tunnel to date.

Published

on

Credit: The Boring Company/X

The Boring Company announced that its Prufrock-2 tunnel boring machine (TBM) has completed another Vegas Loop tunnel in Las Vegas. The company shared the update in a post on social media platform X.

According to The Boring Company’s post, the new tunnel measures 2.28 miles, making it the company’s longest single Vegas Loop tunnel to date.

The new tunnel marks the fourth tunnel constructed near Westgate Las Vegas as the Vegas Loop network continues expanding across the city.

The Boring Company also noted that the new tunnel surpassed its previous internal record of 2.26 miles for a single Vegas Loop segment.

Advertisement

Construction of the tunnel involved moving roughly 68,000 cubic yards of dirt. The excavation process also used about 4.8 miles of continuous conveyor belt, powered by six motors totaling 825 horsepower.

The Boring Company’s Prufrock-series all-electric tunnel boring machines are designed to support the rapid expansion of company’s underground transportation projects, including the growing Vegas Loop network. Prufrock machines are designed for reusability, thanks in no small part to their capability to be deployed and retrieved easily through their “porposing” feature.

The Vegas Loop, specifically the Las Vegas Convention Center (LVCC) Loop segment, has already been used during major events. Most recently, the LVCC Loop supported the 2026 CONEXPO-CON/AGG construction trade show, which was held from March 3-7, 2026. 

As per The Boring Company, the LVCC Loop transported roughly 82,000 passengers across the convention center campus during the event’s duration. 

Advertisement

CONEXPO-CON/AGG is one of the largest construction trade shows in North America, drawing more than 140,000 construction professionals from 128 countries this year.

The LVCC Loop forms the initial segment of the broader Vegas Loop network, which remains under active development as The Boring Company continues building new tunnels throughout the city.

Continue Reading

News

Tesla gathers Cybercab fleet in Gigafactory Texas

Images and video of the Cybercab fleet were shared by longtime Giga Texas observer Joe Tegtmeyer in posts on social media platform X.

Published

on

Credit: Credit: @JoeTegtmeyer/X

Tesla appears to be assembling a growing number of Cybercabs at Gigafactory Texas as preparations continue for the vehicle’s mass production. Recent footage shared online has shown over 30 Cybercabs being transported by trucks or staged near testing areas at the facility.

The images and video were shared by longtime Giga Texas observer and drone operator Joe Tegtmeyer in posts on social media platform X.

Interestingly enough, Tegtmeyer noted that many of the Cybercabs being loaded onto transport trucks were still equipped with steering wheels. This suggests that the vehicles are likely testing units rather than the final driverless configuration expected for the company’s Robotaxi service.

The vehicles could potentially be headed to testing sites across the United States as Tesla prepares to expand its Robotaxi fleet.

Advertisement

Additional footage captured at Gigafactory Texas also showed the Cybercab’s side and rear camera washer system operating as vehicles were being loaded onto transport trucks.

The growing number of Cybercabs at Giga Texas comes amidst the company’s announcement that the first production Cybercab has been produced at the facility. Full Cybercab production is expected to begin in April.

The vehicle is expected to play a central role in Tesla’s Robotaxi ambitions as the company looks to expand autonomous ride-hailing operations beyond its early deployments using Model Y vehicles.

Tesla has also linked Cybercab production to its proposed Unboxed manufacturing process, which assembles large vehicle modules separately before integrating them. The approach is intended to reduce production costs and accelerate output.

Advertisement

Musk has also noted that the Cybercab’s ramp will likely begin slowly due to the number of new components and manufacturing steps involved. However, he stated that once the process matures, Cybercab production could scale quickly.

Continue Reading