Connect with us

Energy

Tesla’s “Autopilot for grid-type batteries” now manages over 1.2 GWh of energy storage

Credit: Tesla

Published

on

Autobidder, Tesla’s machine learning-driven energy management software described by Senior Vice President of Powertrain and Energy Engineering Drew Baglino as “Autopilot for grid-tied batteries,” is now managing more than 1.2 GWh worth of energy capacity. 

The rather remarkable update was shared on LinkedIn by Rohan Ma, an energy veteran who worked at SolarCity before coming aboard Tesla in February 2017 as part of its Energy Products Optimization team. While sharing recent reports about a massive battery project in Angleton, Texas, Ma noted that the Autobidder portfolio is operating over 1.2 GWh in 2021.

“With the Autobidder portfolio operating over 1.2 GWh in 2021, we’re pumped to be launching in Texas this summer. Always interested to connect with people who have experience in ERCOT,” Ma wrote. 

With this in mind, it appears that the upcoming Angleton, Texas battery would also be using Autobidder. The same will likely be true for other high-profile Tesla Energy projects in the United States, such as the Moss Landing battery, which seems to be nearing completion. The Moss Landing battery installation is massive, being a formidable 182.5 MW/730 MWh system when fully completed. 

During a previous earnings call, Tesla executive Drew Baglino noted that Autobidder is basically Autopilot for grid-type batteries, and it is a pivotal aspect of the company’s strategy to ensure grid stability. Tesla CEO Elon Musk explained the nature of the system further, as well as its innate potential. 

Advertisement
-

“It’s just grid stabilization at the most heightened level, so it just shows that things are super smooth. It’s like a UPS, uninterruptible power supply, of a normal size but just ensure that this grid is smooth sailing. And then the batteries, the computers, like all, interact with each other and make sure that they’re working together to make the grid smooth. And this can be done with the Powerwalls and the Megapacks and the Powerpacks all working together and interacting with third-party systems as well,” Musk said. 

Autobidder is arguably one of Tesla’s most underrated products, with its use of machine learning to manage energy projects. As per Autobidder’s official page, the system’s algorithms are capable of performing various functionalities, including price forecasting, load forecasting, generation forecasting, dispatch optimization, and smart bidding. Autobidder is currently being used in the Hornsdale Power Reserve, where it has helped drive down energy costs through market bidding. 

Don’t hesitate to contact us for news tips. Just send a message to tips@teslarati.com to give us a heads up.

Simon is an experienced automotive reporter with a passion for electric cars and clean energy. Fascinated by the world envisioned by Elon Musk, he hopes to make it to Mars (at least as a tourist) someday. For stories or tips--or even to just say a simple hello--send a message to his email, simon@teslarati.com or his handle on X, @ResidentSponge.

Advertisement
Comments

Elon Musk

Google just picked SpaceX for its first step into orbital AI

Google will launch its first Project Suncatcher AI satellite on SpaceX’s Transporter-18 rideshare next week.

Published

on

By

Google is about to put its own AI chips into orbit for the first time, and it is paying SpaceX to get them there.

The company said Thursday that the first in-orbit test of Project Suncatcher, its research effort to find out whether space can host large-scale AI computing, will fly next week on SpaceX’s Transporter-18 rideshare mission.

The satellite, called MVP, is about the size of a refrigerator and carries four of Google’s Tensor Processing Units, the same chips Google runs in its ground data centers. Google originally planned to launch two custom satellites in 2027, but chose to move faster by integrating its chips into a satellite.

MVP’s solar panels supply about one kilowatt of power, and Google will run Gemini models on the TPUs only in bursts of roughly 15 minutes before the chips shut down so the radiators can shed heat. In a blog post, Google said its Trillium TPUs survived vibration testing that mimicked sustained launch loads of up to 10g, with individual components seeing 50 to 100g, and handled a radiation dose greater than a five year mission would deliver.

SpaceX and Google mull massive partnership on Musk’s orbital data dream: report

Next week’s flight, slated for October 1, follows a relationship that became public in May, when Teslarati reported that Google was in talks with SpaceX for a launch deal tied to orbital data centers. Google also holds a stake of roughly 6% in SpaceX.

Advertisement
-

The two companies are chasing the same idea from very different starting points. SpaceX’s own orbital compute program is built around the AI1 satellite, a roughly 70 meter structure derived from Starlink V3 hardware that is designed for 150 kW of peak compute, about 150 times the power MVP will draw. Elon Musk has brushed off concerns about crowding orbit with those satellites, and SpaceX is building its Gigasat factory in Bastrop, Texas, to produce them, targeting an annualized rate of about 1 GW of space compute by the end of 2027.

Musk also posted on X on Thursday that “the amount of compute in space will obviously round up to 100% of all compute.”

Google has been more cautious in public. Its research estimates that launch prices need to fall below about $200 per kilogram before an orbital data center can compete with a ground facility on energy cost, a threshold the company believes could be reached around the mid 2030s. The Suncatcher team has said it expects the effort to remain a project rather than a product for years, which leaves the first real test of its hardware riding on a rocket from the company with the most aggressive timeline in the field.

Continue Reading

Energy

Tesla Semi factory is getting a celebration nobody expected

Tesla will inaugurate its Nevada Semi factory September 24, five months after production quietly began ramping.

Published

on

By

Tesla says it will officially inaugurate its new Semi factory in Nevada next month. The Tesla Semi account posted the announcement on X, sharing a graphic titled “Semi Rollout” with a date of September 24. No further details were given about the format of the event or who would attend.

While Tesla’s dedicated Semi plant in Sparks, adjacent to Gigafactory Nevada, opened back in April, with the first trucks rolling off the high volume line on April 29, the timing for the factory inauguration comes at a surprise. The ribbon cutting event five months into production is a break from how Tesla has usually handled its other factories, where the first truck or car off the line typically served as the milestone moment.

The 1.7 million square foot factory was built as part of a $3.6 billion expansion Tesla announced in early 2023, and it shares a site with the battery cell lines that feed the Semi’s structural pack, a decision meant to remove the supply bottleneck that delayed the truck for years. The plant is designed for 50,000 trucks a year at full ramp. Semi program director Dan Priestley has said production “is now ramping” rather than claiming it has reached scale.

Nine years passed between the Semi’s 2017 unveiling and this stage of production, with the truck slipping from an original 2019 target through hand built pilot units for PepsiCo and a slow build out of the Nevada plant. An inauguration event now gives Tesla a stage to talk up that ramp and reset expectations for how many trucks it can begin delivering at scale.

Advertisement
-

The September date also lines up with the Semi’s next milestone. Tesla confirmed the truck is heading to Europe with a full unveiling at the IAA Transportation trade show in Hannover, Germany, running September 15 through 20. Between the Nevada event and the Hannover reveal, Tesla has roughly a week and a half in September to make the case that the Semi is now a truck being built and sold on two continents rather than tested in a handful of fleets.

Continue Reading

Energy

Tesla launches Powerwall Lease for affordable home backup

Published

on

Credit: Tesla

Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.

Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.

Advertisement
-

This credit lowers the effective cost to roughly $35 per month plus applicable tax.

Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.

The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.

Tesla announces 100k Powerwalls are participating in Virtual Power Plants

Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.

Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.

Advertisement
-

The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.

Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.

Continue Reading