Connect with us

News

SpaceX accepts delivery of NASA’s DART asteroid impact spacecraft

NASA's DART asteroid impactor has officially arrived in California and reached SpaceX's West Coast launch site. (USSF/NASA)

Published

on

NASA says that the Double Asteroid Redirect Test (DART) spacecraft has arrived at SpaceX’s Vandenberg Space Force Base (VSFB) facilities for a launch later this month.

After being carefully packaged for shipment from Maryland’s Johns Hopkins University Applied Physics Lab (JHUAPL) on September 29th, the small 690 kg (~1500 lb) spacecraft was transported by road and arrived at third-party VSFB processing facilities on October 2nd. Once there, technicians unpacked DART, charged its batteries, and performed a wide range of final tests and checkouts to verify the nominal operation of all spacecraft systems after an almost three-thousand-mile journey.

On October 26th, the spacecraft was once again prepared for transport, this time traveling just a few miles from Asrtotech’s to SpaceX’s payload processing facilities (PPF). Colocated inside the company’s main Space Launch Complex 4 (SLC-4) hangar, where DART’s reused Falcon 9 rocket is also preparing for flight, the NASA spacecraft is now just a fraction of a mile away from where it will soon take flight.

At SpaceX’s PPF, DART will be fueled with toxic hydrazine propellant for its attitude control thrusters and (likely but unconfirmed) xenon propellant for its main ion thruster propulsion system Engineers and technicians will also perform final closeout work, removing protective covers, unlatching and priming mechanical systems, and generally preparing the spacecraft for launch.

Advertisement

Around 7-10 days prior to NASA’s current 10:20 pm PST, Nov 23 (05:20 UTC, Nov 24) launch date, SpaceX will encapsulate DART and its Italian-built LICIACube smallsat companion inside Falcon 9’s payload fairing, which will dwarf the relatively tiny duo.

Technicians unpack DART after its VSFB arrival. (USSF/NASA)
DART is about twice as large as the Transiting Exoplanet Survey Satellite (TESS) SpaceX launched in 2018. (NASA)

Sans fairing and DART, twice-flown Falcon 9 booster B1063 and a new expendable upper stage will likely roll out to SLC-4E for the first time around November 16th to complete a prelaunch wet dress rehearsal and static fire test. Falcon 9 will then return to the hangar, where SpaceX will install its payload fairing with DART safely cocooned inside. Barring surprises, the fully integrated rocket will then roll out to the pad for the last time a few days prior to launch.

Despite the small payload and indications from public NASA and SpaceX data that Falcon 9 is more than capable of a return-to-launch-site landing after launching a spacecraft ~50% heavier than DART, Falcon 9 B1063 will reportedly land downrange on drone ship Of Course I Still Love You (OCISLY). Regardless, DART will be the first interplanetary NASA payload launched on a flight-proven commercial rocket and Falcon 9’s first interplanetary launch ever (excluding TESS and DSCOVR, which technically remain under the gravitational influence of the Earth-Moon system).

Eric Ralph is Teslarati's senior spaceflight reporter and has been covering the industry in some capacity for almost half a decade, largely spurred in 2016 by a trip to Mexico to watch Elon Musk reveal SpaceX's plans for Mars in person. Aside from spreading interest and excitement about spaceflight far and wide, his primary goal is to cover humanity's ongoing efforts to expand beyond Earth to the Moon, Mars, and elsewhere.

Advertisement
Comments

Elon Musk

Tesla Supercharger for Business exposes jaw-dropping ROI gap between best and worst locations

Tesla’s new Supercharger for Business calculator reveals an eye-opening all-in cost and location-based ROI projections.

Published

on

By

tesla v4 supercharger

Tesla has launched an online calculator for its Supercharger for Business program, giving property owners their first transparent look at what it really costs to install Superchargers on site and what kind of return they can expect.

The program itself launched in September 2025, allowing businesses to purchase and operate Supercharger hardware on their own property while Tesla handles installation, maintenance, software, and 24/7 driver support. As Teslarati reported at launch, hosts also get their logo placed on the chargers and their location integrated into Tesla’s in-car navigation, meaning drivers are actively routed there. The stalls are open to all EVs, not just Teslas.


The new online calculator, announced by Tesla on Wednesday with the note that “simplicity and transparency” have been a problem in the industry, lets any business enter a U.S. address and get a real cost and revenue model. A standard 8-stall V4 Supercharger site runs approximately $500,000 in hardware and $55,000 per post for installation, bringing an all-in price just shy of $1 million. Tesla charges a flat $0.10 per kWh fee to cover software, billing, and network operations. Businesses set their own retail price and keep the margin above that fee.

Tesla expands its branded ‘For Business’ Superchargers

 

Taking a look at Tesla’s Supercharger for Business online calculator, we can see that ROI is not uniform, and the gap between a strong location and a poor one can stretch the breakeven point by several years.

The biggest driver is foot traffic and how long people stay. A busy rest station, hotel, or outlet mall brings in repeat visitors who need to charge while they’re already stopped, pushing utilization numbers higher and shortening payback time.

Tesla Supercharger for Business ROI calculator

Tesla Supercharger for Business ROI calculator

Local electricity rates matter just as much on the cost side. Markets like California carry some of the highest commercial electricity rates in the country, which eats into the margin between what a host pays per kWh and what they charge drivers. At the same time, dense urban areas with high EV adoption tend to support higher retail charging prices, which can offset that cost if demand is strong enough. Weather also plays a role. Cold climates reduce battery efficiency and increase charging frequency, but they can also suppress utilization in winter months if drivers avoid stopping in exposed outdoor locations. Suburban and rural sites face a different problem: lower baseline EV traffic, which means a site with cheaper power and lower operating costs can still take longer to pay back simply because the stalls sit idle more often. Tesla’s calculator uses real fleet data to pre-fill utilization estimates by ZIP code, so businesses can run their specific address against these variables rather than relying on averages.

The program has seen real adoption. Wawa, already the largest host of Tesla Superchargers with over 2,100 stalls across 223 locations, opened its first fully owned and branded site in Alachua, Florida earlier this year. Francis Energy of Oklahoma and the city of Alpharetta, Georgia have also deployed branded stations through the program, as Teslarati covered in January.

Tesla now exceeds 80,000 Supercharger stalls worldwide, and the calculator makes the economic case for accelerating that number through private investment rather than company-owned sites alone.

Continue Reading

News

Elon Musk drops a bomb regarding Tesla Model S, X inventory

After more than a decade on the road, the original flagship sedan and SUV platforms are effectively at the end of the line. Production of new Model S and Model X vehicles has ceased, and custom orders were quietly halted in early April. What remains are roughly a few hundred factory inventory units scattered across the globe, mostly Plaid variants, and they are disappearing fast.

Published

on

lon Musk at the Tesla Model S production launch at the Fremont factory, June 2012. Photo shared by Musk on X, March 2026.
lon Musk at the Tesla Model S production launch at the Fremont factory, June 2012. Photo shared by Musk on X, March 2026.

Elon Musk just dropped a bomb regarding Tesla Model S and X inventory, and as the company is phasing out the flagship vehicles, it sounds like the time to purchase one brand new is almost over.

Musk confirmed on Wednesday that there are “only a few hundred Tesla Model S & X cars left in inventory. Order now if you want one.”

Tesla is running out of units rather quickly.

The message from Musk reads like a final call for two of the company’s most storied vehicles.

After more than a decade on the road, the original flagship sedan and SUV platforms are effectively at the end of the line. Production of new Model S and Model X vehicles has ceased, and custom orders were quietly halted in early April. What remains are roughly a few hundred factory inventory units scattered across the globe, mostly Plaid variants, and they are disappearing fast.

The news marks the close of a remarkable 14-year chapter. Launched in 2012, the Model S redefined the electric vehicle with blistering acceleration, over-the-air updates, and a luxury interior that embarrassed traditional sedans.

The Model X followed in 2015, turning heads with its Falcon-wing doors and seating for seven.

Together, the Model S and Model X proved EVs could be desirable halo cars, not just eco-friendly commuters. Their departure clears factory space at Tesla’s Fremont plant for something the mass production of the Optimus humanoid robot, which Musk believes will be the greatest contributor to the company’s value.

Musk has repeatedly signaled that Tesla’s future lies beyond passenger cars. Resources once devoted to low-volume flagships are shifting toward autonomy, Robotaxis, and AI hardware. Optimus, the company’s general-purpose robot, is expected to handle manufacturing, household chores, and eventually complex labor.

In the short term, the scarcity has already driven prices on remaining inventory up by about $15,000, turning the last Model S and X into instant collector’s items.

Tesla uses Model S and X ‘sentimental’ value to enforce massive pricing move

 

The announcement underscores Tesla’s relentless pivot. While the Model Y continues to hold strong sales, the legacy S and X represented an earlier era of pure performance luxury.

The future has been paved by Tesla and Musk’s focus on autonomy, at least in the United States. Customers continue to call for a large SUV, which might be on the way after a recent nudge from Musk on X. 

However, whatever the future holds, it has been forged by Tesla’s two flagship vehicles.

Once these final cars are gone, the Model S and Model X will live on only in driveways, forums, and the rear-view mirror of automotive history.

Continue Reading

News

Tesla Cybercab production ignites with 60 units spotted at Giga Texas

Designed exclusively for unsupervised Full Self-Driving, the Cybercab promises to deliver safe, affordable, on-demand mobility without human drivers. Early units with temporary controls allow engineers to refine hardware and software in controlled settings before full autonomous fleets hit the roads.

Published

on

Credit: Joe Tegtmeyer

Tesla Cybercab production at Giga Texas seems to have ignited, as 60 units were spotted outside of the production facility on Wednesday, with speculation hinting the all-electric ride-hailing vehicle could be headed to the lineup sooner rather than later.

Interestingly, they were also spotted with steering wheels, which Tesla said the car would be void of.

Giga Texas observer and drone operator Joe Tegtmeyer shared on X a new post that revealed approximately 60 Cybercabs parked in two organized groups in the factory’s outbound lot—the largest concentration observed to date.

Tegtmeyer noted white seats inside several vehicles and clearly visible steering wheels on most. These are not yet the final steering-wheel-free production versions unveiled in 2024, but early units are likely undergoing validation testing for new features and real-world robotaxi operations across the country.

The timing could not be more symbolic. Tesla has consistently affirmed that mass manufacturing of the Cybercab would begin this month.

CEO Elon Musk has reiterated the April 2026 target multiple times, emphasizing that while initial output will be slow, following the classic S-curve of new-vehicle ramps, the Giga Texas line is being prepared to produce hundreds of units per week.

Tesla CEO Elon Musk outlines expectations for Cybercab production

The first Cybercab already rolled off the line in February, but April marks the official shift to volume production of this purpose-built, pedal- and steering-wheel-free autonomous vehicle.

These 60 Cybercabs signal far more than parked prototypes. They represent tangible proof that Tesla is executing on its ambitious robotaxi roadmap.

Designed exclusively for unsupervised Full Self-Driving, the Cybercab promises to deliver safe, affordable, on-demand mobility without human drivers. Early units with temporary controls allow engineers to refine hardware and software in controlled settings before full autonomous fleets hit the roads.

As production scales, Giga Texas, already home to Cybertruck production, will become the epicenter of Tesla’s autonomous revolution, targeting millions of vehicles annually in the years ahead.

For Tesla and its investors, this sighting underscores manufacturing excellence and timeline discipline. It counters skepticism about the company’s ability to deliver on next-generation vehicles amid a competitive autonomous landscape.

Broader implications are profound: lower transportation costs, reduced emissions, and safer roads as robotaxis proliferate. Musk’s vision of a future where Cybercabs operate 24/7, generating revenue for owners and riders alike, is now visibly underway.

With mass production officially ramping in April, today’s images are not just a snapshot of parked vehicles; they are the first frames of a mobility transformation. Tesla is not only meeting its commitments; it is accelerating toward an era where autonomy reshapes daily life. The Cybercab era has begun.

Continue Reading