Connect with us
tesla-gigafactory-south-korea tesla-gigafactory-south-korea

News

Elon Musk considers South Korea for next Tesla Gigafactory location: report

(Credit: Tesla Greater China)

Published

on

South Korea’s presidential office revealed that President Yoon Suk-Yeol and Elon Musk conversed about Tesla in a video call on Wednesday, November 23. 

During the video call, Elon Musk reportedly told President Yoon that he considered South Korea one of the top candidates for a Tesla factory in Asia, reported Reuters. Since the beginning of the year, Musk has teased that Tesla plans to announce its next gigafactory location by the end of 2022. 

Tesla Canada

Last quarter, a few documents and occurrences appeared to suggest that Tesla might build its next gigafactory in Canada. The Minister of Innovation, Science and Industry in Canada, Francois-Philippe Champagne (FPC), confirmed that he held talks with Tesla. Minister Champagne also visited Tesla’s Markham facility in Canada. The Markham site makes machines installed at Tesla gigafactories worldwide. 

In August, Tesla lobbyist registry documents in Canada revealed that the EV automaker initiated talks with Canada’s federal government. The records covered possibilities of Tesla exploring manufacturing opportunities in Canada and speeding up permit timelines.

Canada has been working on becoming the global auto industry’s “supplier of choice.” The country is well-positioned to be a strong contender as a top EV supplier in North America, especially after the United States passed the Inflation Reduction Act (IRA). 

Tesla Gigafactory in South Korea

Even though Canada would be a good move for Tesla with the IRA enacted, the EV automaker could also be looking to strengthen its roots in Asia, and South Korea would be a good choice. Giga Shanghai has been a powerhouse factory for the company, making significant contributions to Tesla’s output and finances. However, the tension between the United States and China might place Tesla in a precarious position. 

South Korea is an ideal country for another Tesla gigafactory in Asia. Elon Musk and President Yoon also talked about Tesla stepping up cooperation with South Korea on supply chains, hinting that the EV maker would have a reliable support system for a gigafactory in the country.

Advertisement
-

Tesla already has strong ties to South Korea. It works closely with LG Energy Solutions (LGES) to produce batteries. In June, the South Korean battery producer announced plans to invest $567.76 million to expand production at home. LGES provided Teslarati with details on the expansion, which included plans for a new assembly that would produce 4680 cylindrical battery cells

Heard anything about Tesla’s next gigafactory location? I’d like to hear from you. Contact me at maria@teslarati.com or via Twitter @Writer_01001101. Or contact the entire team at tips@teslarati.com

Maria--aka "M"-- is an experienced writer and book editor. She's written about several topics including health, tech, and politics. As a book editor, she's worked with authors who write Sci-Fi, Romance, and Dark Fantasy. M loves hearing from TESLARATI readers. If you have any tips or article ideas, contact her at maria@teslarati.com or via X, @Writer_01001101.

Advertisement
Comments

News

Tesla Full Self-Driving expands to another European country

Published

on

Credit: Tesla

Tesla’s Full Self-Driving (Supervised) is heading to Czechia after the Czech Ministry of Transport recognised the Dutch RDW’s provisional type approval, making the country the seventh EU member state to clear the system for public roads. Tesla Europe announced on 21 September 2026 that “FSD Supervised is now approved in Czechia” and that rollout “will begin soon.”

The decision marks a notable reversal. Earlier in 2026, Prague had declined to automatically recognise the Netherlands’ April approval, citing concerns over speed-limit compliance, traffic-sign recognition and driver-attention monitoring, and arguing that a coordinated EU approach was preferable. Officials said months of expert review, talks with Tesla and other member states, and real-world data from countries already using the system resolved those issues.

“Safety remains the top priority,” the ministry stated.

FSD Supervised remains a Level 2 driver-assistance system: the driver must stay engaged and is legally responsible. Eligible vehicles need AI4, the company’s most up-to-date hardware version. Tesla is expected to push the feature over the air in the coming days, following the pattern seen after earlier national approvals.

Europe’s rollout began when Dutch regulator RDW issued a provisional EU type approval on 10 April 2026 after extensive testing. Mutual recognition then produced a rapid cascade: Lithuania (20 May), Estonia (29 May), Denmark (9 June), Belgium (10 June) and Slovenia (7 September). Czechia now completes that list of seven.

The approvals cover only a modest share of the EU population, but they add political weight ahead of a 6 October vote by the Technical Committee on Motor Vehicles. A qualified majority, at least 15 of 27 member states representing 65 percent of the EU population, could open the remaining markets, including large ones such as Germany, France, Italy and Spain that have so far preferred to wait for a bloc-wide decision.

For Czech Tesla owners, the immediate prize is access to the same supervised highway and city driving already available in the other six countries. For Tesla, each new market generates additional European driving data and strengthens the case that FSD Supervised can operate safely under the continent’s varied road rules. The Czech approval is therefore both a local milestone and another incremental step toward a wider European launch.

Continue Reading

News

Tesla Roadster event requires restricted airspace, and the FAA obliges

Published

on

Credit: @BLKMDL3/Twitter

The Federal Aviation Administration (FAA) has established a Temporary Flight Restriction over SpaceX’s McGregor, Texas, rocket development and test facility, a move widely viewed as preparation for Tesla’s October 1 Roadster reveal. The restriction took effect September 18 and runs through October 2.

NOTAM FDC 6/3825 covers a 1.5-nautical-mile radius around the site near Waco and extends from the surface to 10,000 feet above ground level. The FAA cited hazards under 14 CFR 91.137(a)(3) and barred aircraft and drones from the zone. Tesla’s invitation to reservation holders already placed the event in Waco, about 20 minutes from McGregor, making the timing and location more than coincidental.

What stands out is the altitude. Typical recent TFRs at McGregor for engine static fires and component tests have used far lower ceilings, often around 2,000 feet. Raising the limit to 10,000 feet is unusually high even compared with some Starbase restrictions and signals operations that go beyond a standard ground-level engine test.

That extra airspace has fueled speculation about the long-promised SpaceX Package for the Roadster. Elon Musk has described cold-gas thrusters that could deliver sub-one-second 0-60 times and, more dramatically, brief lift-off. Reports earlier this year indicated Tesla planned a remote-controlled demonstration at McGregor in which the car would leave the ground with no one inside; spectators kept hundreds of yards away because of the noise.

The 10,000-foot envelope would give operators a large safety buffer even if the vehicle only hovers a short distance.

Tesla has not confirmed a flight demo. The company has only used the phrase “Go for launch” and posted a teaser image of the car on what looks like a launch pad. The TFR itself mentions only hazards. Still, closing airspace this high and this close to the reveal date strongly suggests the event will include more than a static display.

Whether the Roadster actually hovers on October 1 remains to be seen. What is certain is that the FAA has cleared a large vertical slice of Texas sky for whatever Tesla and SpaceX intend to show. Reservation holders heading to Waco will be among the first to find out if the car can do more than drive.

Continue Reading

Elon Musk

Elon Musk drops a surprise update on Boring Company’s next big dig

Musk says Boring Company could shrink the Austin to San Antonio drive to just minutes.

Published

on

By

Elon Musk says The Boring Company is working on what he called “a simple, precursor Hyperloop” tunnel connecting Austin and San Antonio, targeting speeds above 200 mph and cutting a drive that can take up to two and a half hours down to a consistent under 30 minutes. Musk posted the idea on X Sunday, in a reply to a repost of an AI generated video imagining a science fiction future with human colonies on other worlds, which he shared with the line “This is the future we shall bring into being.”


The Boring Company’s own account picked up the idea in the same thread, adding a detail about how the trip would actually work: “Because Loop/Hyperloop is express (i.e. no intermediate stops), one could travel from an Austin parking lot to a favorite San Antonio restaurant in about 30 minutes. As long as they both have Loop stations.” That framing ties the proposed intercity link to the same station model the company already runs in Las Vegas, where riders enter the tunnel network through small, garage style stops rather than one central terminal.

This is not the company’s first run at the Austin to San Antonio corridor. Boring Company floated tunnels between the two cities as far back as 2021, and later competed for a separate San Antonio Loop project tied to the airport before that specific bid stalled. Pitches for tunnels in Chicago, Los Angeles, and a New York to Washington corridor have followed a similar pattern of big announcement without a shovel in the ground.

What is different this time is the balance sheet, especially since The Boring Company closed a 3 billion dollar funding round led by investors in the United Arab Emirates earlier this month at a valuation near 23 billion dollars, giving the tunneling company more capital to chase speculative projects than it had during its earlier Texas pitches. The company is also mid-build on two other intercity systems it has actually broken ground on, inc;luding a Nashville tunnel linking downtown to the airport, where a second boring machine finished commissioning in June, and its Las Vegas network, where the station count keeps climbing on paper faster than tunnels get dug.

That gap between announcement and execution is the reason to treat Sunday’s post as an opening bid rather than a project. A tunnel spanning roughly 80 miles between two metro areas, running at speeds Boring Company has not demonstrated over any real distance, would dwarf anything the company has built. For now, the Austin to San Antonio Hyperloop exists as a caption under an AI generated space video.

Continue Reading