Tesla has announced that it has placed its 50th supercharger in Japan, continuing the company’s expansion in Asia.
This year, Tesla has worked to expand its presence and product offerings in Asia. The Tesla Model Y has been making waves in numerous Asian markets, Tesla started a virtual power plant in Japan, and the Tesla Model S Plaid has been spotted multiple times in China ahead of a possible launch in the country. Now the company has announced its 50th supercharger placed in Japan.
テスラと超急速充電ネットワークで、あなたならどこへいく?
日本全国50ヶ所に設置されたテスラ スーパーチャージャーの無料利用特典付きキャンペーンhttps://t.co/sYtXGz1Fsc pic.twitter.com/ZvzAfiqUcE
— Tesla Japan (@teslamotorsjp) September 23, 2022
Japan poses a unique challenge to Tesla’s charging infrastructure. The land is often sold at a premium due to space constraints. At the same time, Tesla must battle smaller and cheaper EV offerings that are usually only charged at home.
Looking at the map of Supercharger locations supplied by Tesla Japan, you can understand how the company has approached this problem. Foremost, the vast majority of the now 50 superchargers (red dots) are located in and around cities such as Tokyo and Osaka; the rest of the country is covered by many smaller destination chargers (200+ yellow dots).

While this would run counter to Tesla’s American charging locations that specifically target areas of significant amounts of travel, due to the relatively smaller size of the Japanese country, the company can get away with focusing on city centers while smaller and cheaper destination chargers service the small number of rural areas.
Along with placing their 50th Supercharger location in Japan, Tesla is now running a giveaway on their Japanese website for a free rental of a Tesla Model 3 for three days and free supercharging.
Japan is just one of the numerous Asian countries that will likely see an explosion of electric vehicles within the coming years, mirroring the market situation of China. The population density of the county, as well as the often high cost of gas, could be significant motivators for consumers to move to electric options in the coming years.
What do you think of the article? Do you have any comments, questions, or concerns? Shoot me an email at william@teslarati.com. You can also reach me on Twitter @WilliamWritin. If you have news tips, email us at tips@teslarati.com!
Energy
Tesla launches Powerwall Lease for affordable home backup
Tesla Energy has introduced the Powerwall Lease in conjunction with Tesla Electric, making the service available in Texas. This new option delivers whole-home backup power using two Powerwall units for a net monthly cost of $35 after credits, accompanied by a low fixed electricity rate.
Under the lease terms, customers pay a one-time order fee of $100. The base lease payment for the two Powerwalls is approximately $122 per month during the first year, subject to a 3 percent annual escalator thereafter. Enrollment in a qualifying Tesla Electric Backup plan or Virtual Power Plant plan provides an $87 monthly credit.
Powerwall Lease is now available with Tesla Electric in Texas
Whole-home backup for $35/month, with a low fixed electricity rate
– Two Powerwalls, $0 installation
– Storm Watch outage protection
– One app to manage it all pic.twitter.com/oTzqc6K3aF— Tesla Energy (@teslaenergy) August 13, 2026
This credit lowers the effective cost to roughly $35 per month plus applicable tax.
Installation of the standard system carries no additional charge. The package features Storm Watch for outage protection and allows complete management through a single Tesla application. The system supplies continuous whole-home backup capability.
The Powerwall system enables households to maintain electricity during severe storms that disrupt the utility grid. When outages occur, the batteries automatically provide seamless backup power to the home.
Tesla announces 100k Powerwalls are participating in Virtual Power Plants
Tesla Storm Watch monitors weather forecasts and ensures the units are fully charged ahead of anticipated severe weather events so that power remains available throughout the disruption, keeping lights, refrigeration, and other essential systems operating without interruption.
Availability is restricted to select Texas locations where retail electric choice exists. Participants must lease exactly two Powerwall units and maintain continuous enrollment with Tesla Electric. Solar panels cannot be included under this particular lease arrangement.
The monthly credit activates automatically once the system is installed, receives permission to operate, and enrollment is confirmed. To retain the credit, customers are required to stay enrolled in Tesla Electric and fulfill all program conditions.
Nonstandard installations that involve electrical upgrades or special permitting may lead to extra expenses and might impact eligibility for the credit, so be sure to check with either your installer or Tesla to ensure you will still qualify.
TESLARATI Premium Membership
$19.99 USDElon Musk
Inside Tesla’s secretive $10 Billion “Project Crystal Sun” filing
Tesla filed for a $10.1 billion Fort Bend solar factory, but the site isn’t confirmed.
Tesla has filed paperwork in Texas for a second massive manufacturing project in the same week it locked down its chip fabrication site, this time for a $10.1 billion solar cell plant in Fort Bend County. The filing, submitted July 22 under the state’s Jobs, Energy, Technology and Innovation Act and first surfaced by Sawyer Merritt on X, lists an internal project name of “Project Crystal Sun” and targets a site off FM 762 and FM 1994 near Richmond, about 40 minutes outside Houston.
Tesla is planning to build a $10.1 billion vertically integrated solar cell manufacturing facility in Fort Bend County, Texas, about 40 minutes from Houston, according to a new public application filing.
Tesla is aiming to start construction this year and finish in 2028, with… pic.twitter.com/f3HIK5HGST
— Sawyer Merritt (@SawyerMerritt) August 7, 2026
The application, prepared by Kroll Tax Services on Tesla’s behalf, spans five parcels totaling roughly 3,000 acres within the Lamar Consolidated Independent School District. Tesla wants a 10 year property tax limitation in exchange for the investment, split as $1.5 billion in real property and $8.6 billion in equipment and personal property. The company projects 9,712 permanent jobs once the plant reaches full operation, with 1,147 peak construction jobs during a build window running from this year through 2028 and commercial operations targeted for the first quarter of 2029.
Tesla is not fully committed to Fort Bend County yet. The filing states the company is weighing the site against an unnamed out of state alternative, and frames the tax abatement as what would make Texas competitive against that option. If the district and county decline the incentive, Tesla says it may build elsewhere.
Tesla Megapack Megafactory in Texas advances with major property sale
The plant would handle the full solar cell production chain in one facility, according to the filing, covering wafer and ingot manufacturing, coating, metallization and printing lines, cell testing, automated material handling and cleanroom infrastructure. That scope points to Tesla vertically integrating a part of its supply chain it currently sources largely from overseas partners, mirroring the approach behind its expanding Megapack production in Brookshire, Texas, where Tesla has already built out two buildings for its grid battery business.
The timing lines up closely with Tesla and SpaceX’s other big Texas commitment this month. SpaceX confirmed its Terafab chip factory would land in Grimes County days before this filing surfaced, with construction on that $16.8 billion project starting almost immediately after local officials met with residents. Terafab is meant to produce the AI chips running Tesla’s Optimus robots and Full Self-Driving software, while a solar cell plant would feed a different part of the business, the panels and storage systems Tesla sells to homeowners, businesses and utilities, and increasingly needs to power its own data centers.
Musk has talked about building domestic solar manufacturing capacity before, tying it to the amount of power Tesla’s AI ambitions will require.
Elon Musk
Tesla just trademarked MEGAPOD: here’s what it is
Tesla just trademarked ‘MEGAPOD’ with the United States Patent and Trademark Office (USPTO), its latest move in what seems to be a hint that the company is incredibly focused on its AI efforts and storage needs as compute increases.
The application carries serial number 99893717 and lists the applicant as Tesla, Inc., located at 1 Tesla Road, Austin, Texas 78725.
The filing remains in ‘live pending’ status, and it is a new application waiting for assignment to an examining attorney. It has not yet been published or registered.
Tesla just trademarked MEGAPOD
Summary:
“Modular data center hardware systems for artificial intelligence computing, comprised of computer servers, computer hardware for artificial intelligence processing, computer networking hardware, electrical power distribution units, and… pic.twitter.com/3l85DsKadl— Robin (@xdNiBoR) June 19, 2026
According to the official goods and services description in the application, Tesla describes ‘MEGAPOD’ as:
“Modular data center hardware systems for artificial intelligence computing, comprised of computer servers, computer hardware for artificial intelligence processing, computer networking hardware, electrical power distribution units, and cooling systems, sold as a unit; self-contained modular computing hardware systems for artificial intelligence workloads; integrated computer hardware platforms for artificial intelligence computing, namely, enclosures containing computer hardware, power distribution hardware, and cooling hardware, sold as a unit; downloadable software for monitoring, managing, optimizing, and regulating modular artificial intelligence computing hardware systems.”
This description specifies complete, self-contained modular units that integrate servers and specialized AI processing hardware with networking components, power distribution, and cooling systems. It also includes associated downloadable software for oversight and optimization of these systems. The language emphasizes hardware sold “as a unit” and enclosures that combine the necessary elements for AI computing workloads.
Tesla has an established history of developing and commercializing modular hardware systems. Its Megapack product line, for example, consists of utility-scale battery energy storage systems designed as containerized units for grid applications. The MEGAPOD filing follows a similar pattern of protecting a name for modular, integrated hardware platforms, this time focused on artificial intelligence computing infrastructure.
This could be an early move, especially as Tesla did not have trademark rights to the word ‘Cybercab,’ the name of its self-driving, ride-hailing-focused vehicle.
Trademark applications of this type allow companies to secure priority rights to a name for defined categories of goods and services. The USPTO examines applications for compliance with legal requirements, including distinctiveness and absence of conflicts with prior marks. If the application proceeds successfully through examination, publication, and any opposition period, it could result in a federal trademark registration providing nationwide protection. This is what Tesla’s obvious intention is with ‘MEGAPOD.’
Public reports and analysis suggest MEGAPOD could represent modular, container-style AI computing pods designed for easy deployment. These would bundle servers, AI accelerators, power systems, and cooling into self-contained units suitable for distributed AI workloads. This approach aligns with Tesla’s announced AI compute strategy.
In March 2026, Elon Musk outlined plans for “Digital Optimus” (also referred to as Macrohard), a joint Tesla-xAI project for AI agents capable of handling complex digital tasks. The plans include running these agents on Tesla’s AI4 hardware in parked vehicles as well as dedicated compute units installed at Supercharger stations, which collectively offer substantial unused electrical capacity.
What is Digital Optimus? The new Tesla and xAI project explained
A modular hardware platform like the one described in the ‘MEGAPOD’ filing would support scalable, rapid deployment of such distributed compute resources. It could complement Tesla’s other AI infrastructure efforts, including the Dojo supercomputer used for training models and the development of AI systems for autonomous driving and robotics, by enabling edge or regional AI inference without reliance on traditional centralized data centers.